Sampling Methodology Sample Clauses

Sampling Methodology. The Cover Pool Monitor will confirm the sampling methodology used in connection with the matters set out in Section 2.2, including a description of the Sample and populations used, in each case, accords with the Industry Standard Sampling Size.
AutoNDA by SimpleDocs
Sampling Methodology. Parameters measured include discharge (cfs) using USGS pygmy and price AA meters with a Xxxxxxx digital revs/secs counter, suspended sediment (DH 48 wading sampler, DH 59 bridge sampler at site EBR-003 during high flows), bedload sediment (Helly-Xxxxx 3" sampler), and turbidity with a HACH 2100A turbidity meter. Standard sample collection techniques associated with each equipment type are used in the field. Sampling methodology shall remain the same unless otherwise approved by the EBOC in the event of sampling technique or equipment changes.
Sampling Methodology. The sample frame that will be used for this research is the Inter Departmental Business Register (IDBR). The key components of the sampling methodology include: The sampling requirements of the survey are detailed in section 4.3 of the CVTS4 manual. In summary, the minimum requirements for the sample are as follows: · UK enterprises with 10 or more persons; · Stratified by 20 XXXX Rev.2 industry categories B, C10-C12 ,C13-C15 ,C17-C18, C19-C23, C24-C25, C26-C28 and C33, C29-C30, C16+C31-32, D-E, F, G(45), G(46), G(47), I, H, J, K(64,65), K(66), L+M+N+R+S; as well as the UK extension of XXXX categories A, O, P and Q. · Stratified by six enterprise size categories depending on the number of persons employed: (10-19) (20-49) (50-249) (250-499) (500-999) (1000 and more); · Achieved sample and response rate should be sufficient to assure a maximum half length of the 95% confidence interval of 20% for each cell in a matrix of 24 XXXX by 6 size categories. In terms of the sampling procedure, for each sample stratum, the number of sampling units in the frame needs to be counted and recorded, and the pre-defined number of sampling units has to be taken by simple random sampling. All data available about the sampling units (response and non-response) will be saved and every effort will be made to reduce the unit and item non-response during the fieldwork process. The response rate will be assessed by Eurostat as: achieved interviews / the whole sample issued less any non-contactable deadwood The contractor will therefore ensure that attempts are made to contact the entire sample (i.e. non will be ‘parked’), anticipating the likely rate of ‘deadwood’ (non-contactable) in the total sample. The contractor will aim for an achieved response rate of 50% in order to calculate the overall required sample size. Progress reports Progress reports for fieldwork will be provided weekly, with more frequent contact where necessary at the front and back end of the project. The Contractor will also provide the Department with access to a secure web-based project portal, which will show progress in fieldwork. Data coding and cleaning The importance of adhering to the quality control procedures as specified by Eurostat is paramount. These requirements will be thoroughly analysed by the Contractor prior to the fieldwork to ensure that all necessary checks and procedures are in place before the data is gathered. The validity checks specified in the CVTS4 manual should be coded into the ...
Sampling Methodology. The concrete slab floors will be breached with an electric drill and sub-slab gas sampling will be conducted directly beneath the slab (within any encountered subgrade aggregate fill materials). Sample tubing (0.188 inch inner diameter Teflon) will be inserted below the slab to a depth no greater than two inches into the sub-slab material (actual depth will be dependant on Site conditions and the cause of any significant deviation will be documented). Any space between the borehole and tubing will be sealed off with a non-VOC containing material to prevent surface air from entering the system. Air in the Teflon tubing will be screened for VOCs prior to purging. For all sampling locations, the exact purge volume will be dependent on the boring depth and subsequent length of tubing. Three borehole and tubing volumes will be purged prior to collection. The purge rate will not exceed 0.2 liters per minute. If warranted, purge gas will be discharged outside of the building, via plastic tubing. Following purging of ambient air from the collection device, soil gas samples will be collected over a one-hour period (at a rate not exceeding 0.2 liters per minute) into individual laboratory-certified clean Summa canisters equipped with one-hour flow regulators.
Sampling Methodology. Sample locations will be determined by the conditions encountered on the Site. Sediment samples will be collected in areas of visual impact; however; if impact is not observed one surface water sample, one sediment (0-6 inches) sample, and one soil (6-12 inches) sample will be taken for comparison to data from sediment samples taken in 1995. The sediment and the soil samples will also be compared to the Division of Fish, Wildlife, and Marine Resources (DFWMR) sediment criteria and the protection of ecological resources values found in 6 NYCRR Part 375 Table 375 6.8b. In addition, one surface water and one sediment sample will be collected upstream of the Site in order to evaluate background conditions.

Related to Sampling Methodology

  • Methodology 1. The price at which the Assuming Institution sells or disposes of Qualified Financial Contracts will be deemed to be the fair market value of such contracts, if such sale or disposition occurs at prevailing market rates within a predefined timetable as agreed upon by the Assuming Institution and the Receiver.

  • Underwriting Methodology The methodology used in underwriting the extension of credit for each Mortgage Loan employs objective mathematical principles which relate the related Mortgagor's income, assets and liabilities to the proposed payment and such underwriting methodology does not rely on the extent of the related Mortgagor's equity in the collateral as the principal determining factor in approving such credit extension. Such underwriting methodology confirmed that at the time of origination (application/approval) the related Mortgagor had a reasonable ability to make timely payments on the Mortgage Loan;

  • Service Providing Methodology 1.3.1 Party A and Party B agree that during the term of this Agreement, where necessary, Party B may enter into further service agreements with Party A or any other party designated by Party A, which shall provide the specific contents, manner, personnel, and fees for the specific services.

  • Accounting Method For both financial and tax reporting purposes, the books and records of the Company shall be kept on the accrual method of accounting applied in a consistent manner and shall reflect all Company transactions and be appropriate and adequate for the Company’s business.

  • Accounting Methods Implement or adopt any material change in its accounting principles, practices or methods, other than as may be required by GAAP or any Governmental Entity.

  • Sampling The Licensee agrees that the Composition is purchased as a “Work Made for Hire” whereby the clearing of any sampled materials is the responsibility of Licensee.

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

  • Selection Criteria Each Contract is secured by a new or used Motorcycle. No Contract has a Contract Rate less than 1.00%. Each Contract amortizes the amount financed over an original term no greater than 84 months (excluding periods of deferral of first payment). Each Contract has a Principal Balance of at least $500.00 as of the Cutoff Date.

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

  • Testing Landlord shall have the right to conduct annual tests of the Premises to determine whether any contamination of the Premises or the Project has occurred as a result of Tenant’s use. Tenant shall be required to pay the cost of such annual test of the Premises; provided, however, that if Tenant conducts its own tests of the Premises using third party contractors and test procedures acceptable to Landlord which tests are certified to Landlord, Landlord shall accept such tests in lieu of the annual tests to be paid for by Tenant. In addition, at any time, and from time to time, prior to the expiration or earlier termination of the Term, Landlord shall have the right to conduct appropriate tests of the Premises and the Project to determine if contamination has occurred as a result of Tenant’s use of the Premises. In connection with such testing, upon the request of Landlord, Tenant shall deliver to Landlord or its consultant such non-proprietary information concerning the use of Hazardous Materials in or about the Premises by Tenant or any Tenant Party. If contamination has occurred for which Tenant is liable under this Section 30, Tenant shall pay all costs to conduct such tests. If no such contamination is found, Landlord shall pay the costs of such tests (which shall not constitute an Operating Expense). Landlord shall provide Tenant with a copy of all third party, non-confidential reports and tests of the Premises made by or on behalf of Landlord during the Term without representation or warranty and subject to a confidentiality agreement. Tenant shall, at its sole cost and expense, promptly and satisfactorily remediate any environmental conditions identified by such testing in accordance with all Environmental Requirements. Landlord’s receipt of or satisfaction with any environmental assessment in no way waives any rights which Landlord may have against Tenant.

Time is Money Join Law Insider Premium to draft better contracts faster.