Rock Coring Sample Clauses

Rock Coring. 1. This work will be measured for payment by the actual number of vertical linear feet of acceptably drilled hole in bedrock and in individual boulders two (2) feet or more in thickness.
AutoNDA by SimpleDocs

Related to Rock Coring

  • PIONEERING Pioneering may not extend past construction that will be completed during the current construction season. Pioneering may not extend more than 500 feet beyond completed construction unless approved in writing by the Contract Administrator. In addition, the following actions must be taken as pioneering progresses:  Drainage must be provided on all uncompleted construction.  Road pioneering operations may not undercut the final cut slope or restrict drainage.  Culverts at live stream crossings must be installed during pioneering operations prior to embankment.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. Forest Service engineering shall be completed according to the schedule in A8. Should Forest Service be unable to perform the designated survey and design by the completion date or other agreed to time, upon written agreement, Purchaser shall assume responsibility for such work. In such event, Contracting Officer shall revise:

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

  • Forestry (a) An employee occupying an FLSA-exempt position shall have their overtime pay rate changed from one (1) hour of time off for every hour of authorized overtime worked that exceeds eight (8) or ten (10) hours in a day, whichever is applicable, or forty (40) hours in a workweek to time and one-half (1½) for any authorized overtime worked that exceeds eight (8) or ten (10) hours in a day, whichever is applicable, or forty (40) hours in a workweek when all of the following conditions are met:

  • MSEA SEIU shall have exclusive rights to payroll deduction of membership dues, service fees, and premiums for current MSEA-SEIU spon- sored insurance programs. Deductions for other programs may be mutually agreed to by the parties.

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Geotechnical Services Engineer will obtain all necessary subsurface investigations, tests, reports, and perform related surveys.

  • Bridges a. Installation of a temporary (Xxxxxx-type) bridge over an existing structure or at a previously disturbed location, such as a former bridge location, to allow passage of emergency vehicles.

Time is Money Join Law Insider Premium to draft better contracts faster.