Road Upgrading Sample Clauses

Road Upgrading. Reconstruction of the existing 2 (two) lanes of the M5 Road Section and construction of 2 (two) additional lanes to the X0 Xxxx Section, including construction of about 6 (six) two-level interchanges, seven overpasses, 4 (four) new bridges, and two pedestrian underpasses.
AutoNDA by SimpleDocs
Road Upgrading. If required by the Joint Venturers the State will at the Joint Venturers’ cost and expense (except where and to the extent that the Commissioner of Main Roads agrees to bear the whole or any part of the cost) widen upgrade or realign any public road existing from time to time which the Joint Venturers desire to use for their operations hereunder.

Related to Road Upgrading

  • Upgrading You may request an Upgrade. For purposes of an Upgrade request, each individual who constitutes the Depositor under the agreement for Retail Direct Services is considered a required Signing Officer for purposes of acceptance of the Upgrade, and You agree to ensure that each such individual agrees to the Upgrade and accepts the terms of this Agreement before initiating the Upgrade request. Implementation of an Upgrade is subject to the approval of the Financial Institution. We may rely on Your Upgrade request when evidenced by a single Signing Officer and treat such Upgrade request as binding on You. If We then implement the Upgrade, this Agreement is deemed to be accepted by and binding on You. If multiple individuals constitute the Depositor, this Agreement will be deemed provisionally accepted until all individuals who constitute the Depositor under the agreement for Retail Direct Services provide evidence of their acceptance of this Agreement to the Financial Institution (“Provisionally Accepted”). You agree to ensure that all such individuals provide timely evidence of their acceptance of this Agreement to Us. While this Agreement is Provisionally Accepted, one of the following states will apply:

  • Grading The coarse aggregate as delivered to the mixer, shall be well graded as per IS specifications. Maximum size of aggregate used for the work shall be 20mm or 40mm or as specified in items in the bill of quantities and it shall confirm to IS: 383-1970, clause 4.2 (Table-2) However, the exact gradation required to produce a dense concrete of specified strength and desired workability shall be decided as per laboratory test by the Engineer. Coarse aggregate for use in concrete shall be well graded and shall conform to IS: 383-1970 requirements (as per Table-II) given below: IS sieve Designation Percentage Passing by weight for graded aggregate of nominal size. 40mm 20mm 16mm 12.5mm 63mm 100 - - - 40mm 00-000 000 - - 20mm 00-00 00-000 100 - 16mm - - 00-000 000 12.5 - - - 90-100 10.00 00-00 00-00 00-00 00-00 4.75mm 0-5 0-10 0-10 0-10

  • Temporary Upgrading (a) In the event that an employee is temporarily transferred to a higher classification than that to which the employee is regularly assigned, he or she shall be paid at the normal wage scale for such higher classification during the period of such transfer for not less than a full tour of duty.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Construction Sequencing In general, the sequence of the proposed dates of Initial Operation of Interconnection Customers seeking interconnection to the Transmission System will determine the sequence of construction of Network Upgrades.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

Time is Money Join Law Insider Premium to draft better contracts faster.