Road Pavement Sample Clauses

Road Pavement. Road pavements shall be designed for AASHTO H-20 truck loads and loads due to a 65‑ton wheel‑mounted maintenance crane. Parking lot pavement and all accessible areas of the power block shall be designed for passenger cars and light trucks. Design life of the asphalt pavement shall be 10 years.
AutoNDA by SimpleDocs
Road Pavement. A formal design shall be prepared by a registered N.A.T.A. laboratory based on sampling and testing of subgrade materials from the site. Details of the pavement design, results of subgrade testing (including 4 day soak CBR’s) are to be submitted with the design drawings.  Pavements should be designed using the general principles of Austroads 1992 “Pavement Design – A Guide to the Structural Design of Road Pavements”.  Alternatively, the Roads and Traffic Authority’s Standard PTB Structure (Drawing reference 0000.000.PT.0003) can be adopted.  Sandstone shall not be used in pavements. Wearing surfaces shall be asphaltic concrete only (AC) only.
Road Pavement. Outside exclusion zone (1.0m from the outside rail) Road Manager Maintenance as per the Commissioner’s Master Specifications, especially: a) Division 1 General Part 170 – Railway Provisions b) Division 8 Maintenance Part 812 – Exceptions from Routine Maintenance Within exclusion zone Rail Infrastructure Manager Standard agreed between Parties. Traffic Control Devices Advance Warning signage Road Manager AS 1742, Manual of Uniform Traffic Control Devices plus Austroads Guide for Traffic Control Devices. Active advance warning signage Road Authority DPTI Operational Instruction 20.1 “Care, Control & Management of Roads (Highways) by the Commissioner of Highways (section 26 of the Highways Act). Primary warning device Rail Infrastructure Manager AS 1742.7, Manual of Uniform Traffic Control Devices – Railway Crossings within the delegation approved by the Minister for Transport pursuant to the Rail Operation and Safety Act. Shard Masts Structure Rail Infrastructure Manager Rail Devices Rail Transport Operator Road Devices Road Authority Track Infrastructure Rail Infrastructure Manager Rail Signalling Rail Infrastructure Manager Line of Sight Road Corridor Road Manager AS 1742.7, Manual of Uniform Traffic Control Devices – Railway Crossings. GWA Document No.: RS-RSI-006 Issue Date: 30/06/2017 Version No.: D001_v4 ELEMENT MAINTAINED BY STANDARDS Austroads guide to Geometric Design of Rural Roads. Rail Corridor Rail Infrastructure Manager GWA Track Manager to determine Private land including Crown Land Land Owner (requires use of Local Government powers) Native Vegetation Act TSA Vegetation Policy
Road Pavement. The need for periodic maintenance of the road pavement will be determined by the use of annual condition and usage surveys. The function of these surveys will be to record, in both absolute and relative terms, the road pavement’s performance, rideability and structural integrity. Bump integrator or latest technology available shall be used for the purpose of condition survey. Condition surveys shall be undertaken of the whole road pavement within the Project on an annual basis. These surveys shall be divided into one kilometer sections and shall record:
Road Pavement. A formal design shall be prepared by a registered N.A.T.A. laboratory based on sampling and testing of subgrade materials from the site. Details of the pavement design, results of subgrade testing (including 4 day soak CBR’s) are to be submitted with the design drawings.
Road Pavement 

Related to Road Pavement

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Sidewalks doorways, vestibules, halls, stairways and other similar areas shall not be obstructed by Tenant or used by Tenant for any purpose other than ingress and egress to and from the Premises. No rubbish, litter, trash, or material shall be placed, emptied, or thrown in those areas. At no time shall Tenant permit Tenant’s employees to loiter in Common Areas or elsewhere about the Building or Property.

  • Pavement Design If applicable, the Engineer shall incorporate the pavement design developed by the State for this project. If the pavement design is not available, the State may request the Engineer to perform pavement design and submit to State for review and approval.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Roads 16. (1) The Joint Venturers shall —

  • Landscape Develop and coordinate landscape design concepts entailing analysis of existing conditions, proposed components and how the occupants will use the facility. Include location and description of planting, ground improvements and visual barriers.

  • Shopping Goods and works estimated to cost less than $100,000 equivalent per contract may be procured under contracts awarded on the basis of Shopping.

  • Driveways 2.8 The Shop Response must include the possible impact description as well as a timeframe for restoration of Utility or work area. End users and O&M must be made aware of the possible impact in case of failure of redundant system/equipment. End user(s) and O&M must have some say of the date and time it may take place.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

Time is Money Join Law Insider Premium to draft better contracts faster.