Retaining Walls / Drainage Easements / Slopes / Entry Features Sample Clauses

Retaining Walls / Drainage Easements / Slopes / Entry Features. The Purchaser is hereby advised that the proposed lot grading may require the use of retaining walls, fences, acoustical berms and/or barriers, easements for drainage purposes, culverts, drains, catch basins and/or lot sloping, all of which shall be maintained in good condition and repaired and replaced solely at the cost and obligation of Purchaser. With respect to retaining walls, acoustical berms and/or barriers and fences, maintenance shall be done with the same materials and to the same standards and have the same colour and appearance as the original retaining wall, acoustical berm and/or barrier and/or fence. The Purchaser will not alter or remove the original material or colour of any acoustical barrier or alter the original grades within two (2) metres of any acoustical barrier unless authorized in writing by the Municipality. Purchaser agrees to allow the erection and maintenance on the Land of entry features or other structures (which may include hydro transformers and/or telecommunication, telephone or cable TV pedestals) and hereby consents to allow the erection thereof after closing and the Purchaser shall be obligated to maintain any such entry features and/or other structures unless the Municipality otherwise accepts that responsibility. The Purchaser is hereby given notice that the Land may require some or all of the aforementioned. SAMPLE AGREEMENT
AutoNDA by SimpleDocs

Related to Retaining Walls / Drainage Easements / Slopes / Entry Features

  • Access Easement The Owner shall grant to VBWD the necessary easements and rights-of-way and/or maintain perpetual access from public rights-of-way to the Facility for VBWD, its agent, or contractor.

  • Utility Easements 2.1 Some properties may at the discretion of the Developer be subject to easements in favour of suppliers of water, power, gas, telephone, internet and wastewater utilities and services, including SaskPower for location of a transformer and SaskTel. The Property Owner acknowledges that the location of any transformer and which lots will be affected by any such easements, will not be known until such utility and service providers complete their design work and the Developer has negotiated the terms and conditions thereof. The Property Owner further specifically acknowledges and agrees that the Property may be subject to any such easement, and that the same shall not affect or result in a decrease or abatement of the purchase price of the Property.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Access to Project Site Redeveloper shall permit the representatives of the City to enter Project Site at any and all reasonable times, as the City may deem necessary for the purposes of this Redevelopment Agreement, including but not limited to work and inspection of all work being performed in connection with the construction of the Redeveloper Improvements. Similarly, the City shall permit Redeveloper such entry upon the public rights of way for such purposes. No compensation shall be payable nor shall any charges be made in any form by any party for the access or inspection provided for in this Section. The City’s right of access granted under this Section shall terminate upon issuance by the City of the Redeveloper’s Certificate of Completion of Redeveloper Improvements. Notwithstanding the above, Redeveloper shall not be relieved of the provisions contained in Chapter 14.29 of the Lincoln Municipal Code regarding the use of streets for private construction purposes.

  • Access Roads The Company is to construct a public access road from Xxxxx Avenue to the Town Centre together with all other roads shown on the Land Tenure Plan. All roads are to be paved and drained to the satisfaction of the City.

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Provisioning of Line Sharing and Splitter Space 3.2.1 BellSouth will provide ONS with access to the High Frequency Spectrum as follows:

Time is Money Join Law Insider Premium to draft better contracts faster.