Resident Engineer Sample Clauses

Resident Engineer. 6. Sign and date the “Certification” statement (provided as per step 3b) on the Key Sheet mylar and return it to the Design Consultant with a copy of the letter of transmittal to the Regional Construction Engineer, Field Manager and Project Manager.
AutoNDA by SimpleDocs
Resident Engineer. One (1) copy.
Resident Engineer. One (1) copy of the Work Order with a copy of all attachments.
Resident Engineer. If required by the SC, the Consultants shall ensure that at all times during the Consultants' performance of the Services, a Resident Engineer acceptable to the Client, shall take charge of the performance of such Services
Resident Engineer. The Authority’s on-site administrator of a single or multiple construction project(s). This position must be a Maine licensed Professional Engineer. Scope of Work (or Services). A clear, accurate, and detailed description of; the technical requirements for the services to be rendered, how the work must be conducted, how achievements will be assessed, and the obligations of both the Consultant and Authority. The words work and services are used interchangeably throughout this document. Special Provision. A provision unique to an agreement or contract which supersedes any inconsistent or conflicting clause in the Engineering Consultant General Conditions. Special Provisions shall be identified in the Contract.
Resident Engineer. If authorized by the Owner, the Engineer will furnish the services of a Resident Engineer and/or construction representative(s) for continuous on-the-site representation.
Resident Engineer i. Qualification: Must be IT graduate
AutoNDA by SimpleDocs
Resident Engineer. Provide full time resident engineer to monitor and document construction progress, confirm conformance with schedules, plans and specifications, measure and document construction pay quantities, document significant conversations or situations, document input or visits by local authorities, etc., and photograph daily construction activities. Conduct up to three (3) weekly meeting on-site to coordinate progress of the construction work with the Airport, airport tenants, and the Contractor. Prepare daily activity reports documenting construction progress when onsite, materials used, number of workers and work process, and equipment used. Construction is anticipated to last 3 weeks.
Resident Engineer estimating 2 days a week, staying in Pueblo 1 night each trip.
Resident Engineer. 1. Review and facilitate Contractor(s) Site Safety Plan submittals to DDC for acceptability.
Time is Money Join Law Insider Premium to draft better contracts faster.