Required Submittals Sample Clauses

Required Submittals. Complete shop drawings and manufacturer’s catalog data shall be submitted to the State and approved by the State prior to start of any construction work. Power and lighting panel configuration shall be complete with schedule of branch panels, separate disconnects, and circuit breakers, based on calculated and estimated motor, resistive and lighting loads. All circuits shall be labeled at the panel and at the outlet/power pole for future reference. Location of all electrical receptacles and telephone outlets (including power drops for the systems furnishings) shall be designated on a block floor plan showing the systems furnishings layout provided by the State. Said block floor plan shall be furnished by the State to the Owner/Lessor no later than 4 weeks after approved construction plans are received by the State.
AutoNDA by SimpleDocs
Required Submittals. Prior to commencement of construction, the Owner/Lessor shall submit two (2) copies of all shop drawings and manufacturers’ catalogue information for all construction items proposed to the State. These drawings shall include complete schedules for finishes, doors, floors, ceilings, hardware, plumbing fixtures and accessories, HVAC equipment and accessories, etc. Shop drawings and manufacturer’s catalogue information shall be checked and approved by the State. Monthly written construction progress reports and site inspection approvals shall be prepared by the Owner/Lessor and copies submitted to the State. Upon substantial completion of construction and within 30 days of final acceptance, the Owner/Lessor shall submit to the State the following: Two (2) complete sets of reproducible (mylar) as-built drawings corresponding to the approved construction drawings.
Required Submittals. 4.1 The following information must be submitted with your response to this Invitation to Bid:
Required Submittals. JOC shall submit the completed forms referenced in the Forms Appendix (Exhibit “B”) attached hereto to City for approval prior to receipt of a Notice to Proceed issued by City for the Project.
Required Submittals. In addition to Recipient providing to County Recipient’s contracts to review prior to execution per provision 8.C of this Grant Agreement, Recipient shall also provide to County prior to start of work all required permits. Failure of Recipient to provide the aforementioned submittals may result in Recipient’s dismissal of future TLT grant awards.
Required Submittals. The following information shall be submitted to the local agency overseeing system installation:
Required Submittals. In addition to the requirements of Section 8.5 above, Owners shall not be required to make any payment to Contractor pursuant to this Article 8 if Contractor has not provided the submittals described in this Section 8.9(a):
AutoNDA by SimpleDocs
Required Submittals. All certified payroll reports for this project are to be reported through the electronic software system called e-Mars. Instructions for using e-Mars can be found at xxxxx://xxx.xxx-xxx.xxx/wp-content/uploads/Certified-Payroll-Information.pdf. • Form SF1413 “Statement and Acknowledgment” (attached) – This form must be completed and submitted to Contractor by Subcontractor and all sub-subcontractors (if any) used by the Subcontractor under this Subcontract. Instructions for completing this form are available from Contractor. If additional sub-subcontractors are added, an updated SF1413 form including the addition (along with all previous listed sub-subcontractors) must be submitted before any certified payrolls can be processed. • Form WH347 Payroll Reporting Form (available from Contractor) - This form must be submitted on a weekly basis to the Contractor, even when there is no payroll to report for the week. • Statement of Compliance (available from Contractor) – This form must be submitted on a weekly basis to Contractor. SC-8 PERFORMANCE AND PAYMENT BONDS (if required, as shown on subcontract cover page) Subcontractor shall furnish copies of all executed bonds, including any necessary reinsurance agreements, to the Contractor, within 10 days from award of this Subcontract or prior to performing any of the Work, either offsite or onsite, whichever occurs first.
Required Submittals. Prior to commencement of construction, the Lessor shall submit two copies of all Shop Drawings and Manufacturers' Catalogue information for all construction items proposed for use by the Lessee’s authorized representative. These drawings shall include complete schedules for finishes, doors, floors, ceilings, hardware, plumbing fixtures and accessories, HVAC equipment and accessories, etc. Shop Drawings and Manufacturer's Catalogue information shall be checked and approved by the Lessor's Architect/Engineer. Monthly written Construction Progress Reports and site inspection approvals shall be prepared by the Lessor's Architect/Engineer and copies submitted to the Lessee. Construction tests such as soil borings, concrete mix designs, and other pertinent field verifications shall be submitted to the Lessee prior to construction. Upon Substantial Completion of construction and within 30 days of final acceptance, the Lessor shall submit to the Lessee the following: One complete set of reproducible As-Built Drawings corresponding to the approved construction drawings. One copy of the final approved Floor Plan in the form of a computer disc(s) compatible with Autocad software. One complete set of permanent operations manuals, instructions, and manufacturers' repair and maintenance information for all systems and equipment. These items shall be bound in a ring binder. One reduced size composite floor plan (11" x 17") designating all emergency valves, switches, controls, locations of equipment that will require periodic maintenance, etc. Provide the Lessee's designee with training to understand and familiarize occupants with building controls and systems locations/operations, etc.
Required Submittals. (Existing facility will be evaluated on an individual basis.) Complete shop drawings and manufacturer’s catalog data shall be submitted to the Lessee and approved by the Lessee prior to start of any construction work. Power and lighting panel configuration shall be complete with schedule of branch panels, separate disconnects, and circuit breakers, based on calculated and estimated motor, resistive and lighting loads. All circuits shall be labeled at the panel and at the outlet/power pole for future reference. Location of all electrical receptacles and telephone outlets (including power drops for the modular furniture system) shall be designated on a floor plan showing the modular furniture layout provided by the Lessee. Said floor plan shall be available approximately four weeks after approval of construction plans are received.