Reporting to IFD and review of the Project Sample Clauses

Reporting to IFD and review of the Project. 6.1. Steering Committee meeting documents and minutes
AutoNDA by SimpleDocs

Related to Reporting to IFD and review of the Project

  • Reporting to Work All Contractor personnel shall report to their appropriate supervisor upon arrival at a CCI work location. Contractor Management shall ensure that Contractor personnel are given safety orientations for familiarization with potential job site hazards and emergency procedures.

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Project Monitoring Reporting Evaluation A. The Project Implementing Entity shall monitor and evaluate the progress of its activities under the Project and prepare Project Reports in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of indicators agreed with the Bank. Each such report shall cover the period of one

  • Implementation of and Reporting on the Project A. The Grantee shall implement and complete the Project in accordance with Exhibit A and with the plans and specifications contained in its Grant Application, which is on file with the State and is incorporated by reference. Modification of the Project shall require prior written approval of the State.

  • Response/Compliance with Audit or Inspection Findings A. Grantee must act to ensure its and its Subcontractors’ compliance with all corrections necessary to address any finding of noncompliance with any law, regulation, audit requirement, or generally accepted accounting principle, or any other deficiency identified in any audit, review, or inspection of the Contract and the services and Deliverables provided. Any such correction will be at Grantee’s or its Subcontractor's sole expense. Whether Xxxxxxx's action corrects the noncompliance shall be solely the decision of the System Agency.

  • Testing/Trouble Reporting 1.15.1 TWTC will be responsible for testing and isolating troubles on Network Elements. TWTC must test and isolate trouble to the AT&T network before reporting the trouble to the Network Elements Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from AT&T at the time of the trouble report, TWTC will be required to provide the results of the TWTC test which indicate a problem on the AT&T network. Version: 4Q06 Standard ICA 11/30/06

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • Requirement to Utilize HUB Compliance Reporting System Pursuant to Texas Administrative Code, Title 34, Part 1, Sections 20.285(f) and 20.287(b), TFC administers monthly administration HSP-PAR compliance monitoring through its HUB Compliance Reporting System commonly known as B2G. PSP and PSP’s subcontractors/subconsultants shall submit required PAR information into the B2G system. Any delay in the timely submission of PAR information into the B2G system will be treated as an invoicing error subject to dispute under Texas Government Code Section 2251.042.

  • SCOPE OF INSPECTION The purpose of the inspection is to report the general condition of the home and identify and disclose major defects and deficiencies of the inspected systems and components which existed at the time of the inspection and which are evident to the inspector upon ordinary visual observation. Minor and cosmetic defects may be listed in the report for maintenance purposes but it is not the intent, nor will the inspection report identify and list all minor and cosmetic defects. The inspection is intended to evaluate systems and components of the primary premises. Included with the inspection is the evaluation of primary attached garages/carports/decks/porches/patios. The inspection does not include evaluation of detached garages/carports/patios/decks or other structures unless explicitly specified. The client is encouraged to accompany the inspector during the inspection. Client participation shall be at the client’s risk for personal injury or damage to person or property for any reason or from any cause. The inspection and report are performed and prepared for the sole, confidential and exclusive use and possession of the client(s). The inspection report is not transferable. Systems and components to be inspected include: exposed and visible foundations and structures, exteriors, roofing, plumbing, electrical, attic, interiors, bathrooms and kitchen, basement and crawlspaces, heating and central air conditioning, and garage or carport. LIMITS OF THE INSPECTION The inspection is limited to the readily accessible and visible systems, equipment and components of the home. The inspector will not dismantle and/or move equipment, systems, furniture, appliances, floor coverings, finished or fastened surfaces or components, personal property or other items to conduct this inspection or otherwise to expose concealed or inaccessible conditions. The inspection will not include destructive testing of any kind.

Time is Money Join Law Insider Premium to draft better contracts faster.