RENTAL FOR OPTIONAL H2S EQUIPMENT Sample Clauses

RENTAL FOR OPTIONAL H2S EQUIPMENT. Rental for H2S Safety Equipment as Per Exhibit-D (Annexure – I – Appendix – 14 ) shall be per day including its mobilization and de-mobilization charges. The option to take these equipment shall be with the Operator and rental of above equipment shall be payable only during its period of use. In case of utilization of these equipments, Operator shall give the Contractor a notice period of 30 days.
AutoNDA by SimpleDocs

Related to RENTAL FOR OPTIONAL H2S EQUIPMENT

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • Equipment Installation In order to meet its obligations under this Agreement, a Party that owns, rents, or leases equipment (the equipment owner) may require installation of such equipment on property owned by another Party (the property owner), provided that the property is being used for an electric utility purpose and that the property owner shall not be required to do so if it would thereby be prevented from performing its own obligations or exercising its rights under this Agreement.

  • Additional Equipment Additional Equipment may from time to time be added as the subject matter of this Agreement as agreed on by the parties. Any additional property will be added in an amendment describing the property, the monthly rental, security deposit, and stipulated loss value of the additional Equipment. All amendments must be in writing and signed by both parties. Other than by this amendment procedure, this Agreement may not be amended, modified, or altered in any manner except in writing signed by both parties.

  • Licenses for Permanent Installation The contractor must comply with all State mandatory licensing requirements prior to installation. Questions on licensing requirements should be directed to the State Licensing Board. Contractor must furnish and install all furniture and materials in compliance with all applicable codes, whether local, state, or federal; and that all permits or licenses required for installation will be obtained without cost to the State.

  • No Installing Generator Not to install or keep or run any generator in the Said Apartment.

  • Rental Equipment 7.1 We will at all times own all Rental Equipment supplied to you. You will not let, sell, charge, assign, sub-license or allow a third party to use the Rental Equipment nor remove any labels, and shall not prejudice our rights in the Rental Equipment in any way. We may replace the Rental Equipment from time to time either with your prior consent or provided that the replacement Rental Equipment is of a specification that is at least equal to the Rental Equipment originally supplied and such change does not materially disrupt the provision of the Services.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • Mandatory equipment (a) All Employees engaged to work on site will be supplied with safety footwear and safety helmets appropriate to the work that they perform before commencing work on a project. The safety footwear will be of an equivalent standard to those made by:

  • Lease of Equipment Lessor leases to Lessee, and Lessee leases from Lessor, all the property described in the Lease Schedules which are signed from time to time by Lessor and Lessee.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

Time is Money Join Law Insider Premium to draft better contracts faster.