Common use of Relations with Public Authorities Clause in Contracts

Relations with Public Authorities. The contractor shall make sufficient arrangement for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to Government. (vide Govt Circular No CST -1086 / CR-243 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Clause 56: The contractor shall comply with all the provision of the Apprentices Act, 1961 and Rules and Orders issued there under from time to time. If he fails to do so, his failure will be breach of the contract and the Superintending Engineer may in his discretion cancel the contract. The contractor shall also be liable for any pecuniary liability arising on account of any violation by him of the provision of the Act Clause 57: The tender rates are inclusive of all taxes, rates, cesses and are also inclusive of the leviable tax in respect if sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules 58 of Maharashtra Value Added Tax Act-2005. For the purpose of levy of tax. Clause 58 : In case of material which become surplus with the contractor from those issued for the work contracted from the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale tax will be recovered on such sale. Clause 59(1) : QUALITY ASSURANCE AND MAINTENANCE.(Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th October 1991 regarding incorporation additional condition for quality assurance and Maintaince Manual) To ensure the specific quality of work which will also include necessary surveys, temporary works, etc., the contractor shall prepare a quality assurance plan and get the same approved from the Engineer-in-charge within one month from the date of work order. For this, the contractor shall submit an organisation chart of his technical personnel to be deployed on the work along with their qualification, job description defining the function of reporting, supervising, inspecting and approving. The contractor shall also submit a list of tools, equipment and the machinery and instrumentation, which he proposes to use for the construction and for testing in the field and/or in the laboratory and monitoring. The contractor shall modify supplement the organisation chart and the list of Machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel and equipment on the field as per the approved chart and the list respectively. The contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-in-charge. The quality of the work shall be property documented through certificates, records, check lists and Log book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently and this will be the responsibility of the contractor. The form should be got approved from the Engineer in charge. Clause 59 (2) :Where the work is to be on xxx-sum basis on contractor’s design the contractor shall also submit a maintenance manual giving procedure for maintenance, with the periodically of maintenance works including inspections to be used, means of accessibility for all pats of the structure. He shall also include in the manual, the specification, for maintenance works that would be appropriate for his design and technique of construction. This manual shall be submitting within the contract period. Clause 60 : It is obligatory on the part of agency to procure R.C.C. pipe (ISI marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with the bill pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes and also items, in which the use of R.C.C. pipes is contemplated, would be released only after fulfillment of the conditions, laid down as above.

Appears in 6 contracts

Samples: Government of Maharashtra, Government of Maharashtra, pwd.maharashtra.etenders.in

AutoNDA by SimpleDocs

Relations with Public Authorities. The contractor shall make sufficient arrangement arrangements for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation regulations, bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to of Government. (vide Govt Circular No CST -1086 / CR-243 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Vide Xxxx. Xxxxxxxx Xx. XXX- 0000/XX-000/Xx-Xxxx-0/Xxxxxxxxxx Xxxxxx 000000 dt. 11.8.87) Clause 56: The 56 :- A contractor shall comply with all the provision provisions of the Apprentices Act, . 1961 and the Rules and Orders issued there under from time to time. If he fails to do so, his failure will be a breach of the contract and the Superintending Engineer may may, in his discretion discretion, cancel the contract. The contractor shall also be liable for any an pecuniary liability arising on account of any violation by him of the provision of the Act (vide Xxxx. Xxxxxxxx Xx. XXX - 0000/XX-000 Xx-Xxxxxxxx-0/Xxxxxxxxxx, Bombay-400 032, dated 11 Sept. 1987). Clause 57: 57 :- The tender rates are inclusive of all taxes, rates, and cesses and are also inclusive of the s leviable tax in respect if of sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules Rule 58 of Maharashtra Value Added added Tax Act-2005. For Xxx 0000, for the purpose of levy of tax. Tax" Clause 58 : :- In case of material materials which become surplus with the contractor contractors from those issued for the work contracted from for the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale sales tax will be recovered on such sale. Clause 59(1) 59 :-Quality Assurance end Maintenance Manual:- ANNEXURE “A” : QUALITY ASSURANCE AND MAINTENANCE.(Annexure (Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th PWD, Circular No. CAT-1091/CR-60-Bldg-2 Dt. 14th October 1991 1991, regarding incorporation incorporating additional condition for quality assurance Quality Assurance and Maintaince Maintenance Manual) ). To ensure the specific specified quality of work which will also include necessary surveys, survey temporary works, works etc., . the contractor shall prepare a quality assurance plan and get get, the same approved provided from the Engineer-inIn-charge Charge within one month from the date of work order. For this, the this contractor shall submit an organisation organization chart of his technical personnel to be deployed on the work along with alongwith their qualification, job description descriptions defining the function functions of reporting, supervising, reporting supervising inspecting and approving. The contractor shall also submit a list of tools, tools equipment and the machinery and instrumentation, instrumentation which he proposes to use for the construction and for testing in the field and/or in the laboratory Laboratory and monitoring. The contractor shall modify modify/supplement the organisation organization chart and the list of Machinery/ machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel persons and equipment on the field fields as per the approved chart and the list respectively. The contractor Contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-inIn-chargeCharge. The quality of the work shall be property properly documented through certificatescertificate, records, check lists checks list, and Log book Book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently the supplementary and this will be the responsibility of the contractor. The form forms should be got approved from the Engineer in chargeExecutive Engineer-In-Charge. Clause 59 (2) :Where the work is to be done on xxx-lump- sum basis on contractor’s design the contractors designs. The contractor shall also submit a maintenance manual giving procedure for procedure. For maintenance, with the periodically periodicity of maintenance works including inspections inspection tools of the equipments to be used, used means of accessibility for all pats parts of the structure. He shall also include in the manual, the specification, specification for maintenance works that would be appropriate for his design and the technique of construction. This manual shall be submitting submitted within the contract period. Clause 60 60: It is obligatory on the part of agency to procure R.C.C. pipe (ISI ISI) marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill xxxx of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with alongwith the bill xxxx pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes R.C.C. pipes and also items, ,in which the use of R.C.C. pipes is contemplated, contemplated would be released only after fulfillment of the conditions, laid down as above.. Note : In case, provision of this form B-1 conflicts with those in detailed cyclostyled provision and condition attached to this tender, the detailed cyclostyled provision and condition would prevail over those in this form. GENERAL CONDITIONS OF CONTRACT

Appears in 3 contracts

Samples: maharashtra.etenders.in, pwd.maharashtra.etenders.in, pwd.maharashtra.etenders.in

Relations with Public Authorities. The contractor shall make sufficient arrangement for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to Government. (vide Govt Circular No CST -1086 Xxxx Xxxxxxxx Xx XXX -0000 / CR-243 XX-000 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Clause 5654: The contractor shall comply with all the provision of the Apprentices Act, 1961 and Rules and Orders issued there under from time to time. If he fails to do so, his failure will be breach of the contract and the Superintending Engineer may in his discretion cancel the contract. The contractor shall also be liable for any pecuniary liability arising on account of any violation by him of the provision of the Act Clause 5755: The tender rates are inclusive of all taxes, rates, cesses and are also inclusive of the leviable tax in respect if sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules 58 of Maharashtra Value Added Tax Act-2005. For the purpose of levy of tax. Clause 58 56: In case of material which become surplus with the contractor from those issued for the work contracted from the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale tax will be recovered on such sale. Clause 59(157(1) : QUALITY ASSURANCE AND MAINTENANCE.(Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th Xx 0000-/XX -00/ Xxxx -0 xx 00 xx October 1991 regarding incorporation additional condition for quality assurance and Maintaince Maintenance Manual) To ensure the specific quality of work which will also include necessary surveys, temporary works, etc., the contractor shall prepare a quality assurance plan and get the same approved from the Engineer-in-charge within one month from the date of work order. For this, the contractor shall submit an organisation chart of his technical personnel to be deployed on the work along with their qualification, job description defining the function of reporting, supervising, inspecting and approving. The contractor shall also submit a list of tools, equipment and the machinery and instrumentation, which he proposes to use for the construction and for testing in the field and/or in the laboratory and monitoring. The contractor shall modify supplement the organisation chart and the list of Machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel and equipment on the field as per the approved chart and the list respectively. The contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-in-charge. The quality of the work shall be property documented through certificates, records, check lists and Log book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently and this will be the responsibility of the contractor. The form should be got approved from the Engineer in charge. Clause 59 57 (2) :Where the work is to be on xxxlump-sum basis on contractor’s design the contractor shall also submit a maintenance manual giving procedure for maintenance, with the periodically of maintenance works including inspections to be used, means of accessibility for all pats of the structure. He shall also include in the manual, the specification, for maintenance works that would be appropriate for his design and technique of construction. This manual shall be submitting within the contract period. Clause 60 58: It is obligatory on the part of agency to procure R.C.C. pipe (ISI marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill xxxx of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with the bill xxxx pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes R.C.C. pipes and also items, in which the use of R.C.C. pipes is contemplated, would be released only after fulfillment fulfilment of the conditions, laid down as above.

Appears in 2 contracts

Samples: Government of Maharashtra, ofbcipher.s3.amazonaws.com

Relations with Public Authorities. The contractor shall make sufficient arrangement for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to Government. (vide Govt Circular No CST -1086 Xxxx Xxxxxxxx Xx XXX -0000 / CR-243 XX-000 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Clause 56: The contractor shall comply with all the provision of the Apprentices Act, 1961 and Rules and Orders issued there under from time to time. If he fails to do so, his failure will be breach of the contract and the Superintending Engineer Chief Executive Officer may in his discretion cancel the contract. The contractor shall also be liable for any pecuniary liability arising on account of any violation by him of the provision of the Act Clause 57: The tender rates are inclusive of all taxes, rates, cesses and are also inclusive of the leviable tax in respect if sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules 58 of Maharashtra Value Added Tax Act-2005. For the purpose of levy of tax. Clause 58 Note: In case provisions of material which become surplus this form B-1 conflicts with the contractor from those issued for the work contracted from the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax in detailed cyclostyled provisions and sale tax will be recovered on such sale. Clause 59(1) : QUALITY ASSURANCE AND MAINTENANCE.(Annexure conditions attached to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th October 1991 regarding incorporation additional condition for quality assurance and Maintaince Manual) To ensure the specific quality of work which will also include necessary surveys, temporary works, etc., the contractor shall prepare a quality assurance plan and get the same approved from the Engineer-in-charge within one month from the date of work order. For this, the contractor shall submit an organisation chart of his technical personnel to be deployed on the work along with their qualification, job description defining the function of reporting, supervising, inspecting and approvingthis tender. The contractor shall also submit a list of tools, equipment detailed cyclostyled provision and the machinery and instrumentation, which he proposes to use for the construction and for testing conditions would prevail over those in the field and/or in the laboratory and monitoring. The contractor shall modify supplement the organisation chart and the list of Machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel and equipment on the field as per the approved chart and the list respectively. The contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-in-charge. The quality of the work shall be property documented through certificates, records, check lists and Log book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently and this will be the responsibility of the contractor. The form should be got approved from the Engineer in charge. Clause 59 (2) :Where the work is to be on xxx-sum basis on contractor’s design the contractor shall also submit a maintenance manual giving procedure for maintenance, with the periodically of maintenance works including inspections to be used, means of accessibility for all pats of the structure. He shall also include in the manual, the specification, for maintenance works that would be appropriate for his design and technique of construction. This manual shall be submitting within the contract period. Clause 60 : It is obligatory on the part of agency to procure R.C.C. pipe (ISI marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with the bill pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes and also items, in which the use of R.C.C. pipes is contemplated, would be released only after fulfillment of the conditions, laid down as above.‘ B-1”

Appears in 1 contract

Samples: Government of Maharashtra

Relations with Public Authorities. The contractor shall make sufficient arrangement arrangements for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation regulations, bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to of Government. (vide Govt Circular No CST -1086 / CR-243 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Vide Xxxx. Xxxxxxxx Xx. XXX-0000/XX-000/Xx-Xxxx-0/Xxxxxxxxxx Xxxxxx 000000 dt. 11.8.87) Clause 56: The 56 :- A contractor shall comply with all the provision provisions of the Apprentices Act, . 1961 and the Rules and Orders issued there under from time to time. If he fails to do so, his failure will be a breach of the contract and the Superintending Engineer may may, in his discretion discretion, cancel the contract. The contractor shall also be liable for any an pecuniary liability arising on account of any violation by him of the provision of the Act (vide Xxxx. Xxxxxxxx Xx. XXX - 0000/XX-000 Xx-Xxxxxxxx- 2/Mantralaya, Bombay-400 032, dated 11 Sept. 1987). Clause 57: 57 :- The tender rates are inclusive of all taxes, rates, and cesses and are also inclusive of the s leviable tax in respect if of sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules Rule 58 of Maharashtra Value Added added Tax Act-2005. For Xxx 0000, for the purpose of levy of tax. Tax" Clause 58 : :- In case of material materials which become surplus with the contractor contractors from those issued for the work contracted from for the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale sales tax will be recovered on such sale. Clause 59(1) 59 :-Quality Assurance end Maintenance Manual:- ANNEXURE “A” : QUALITY ASSURANCE AND MAINTENANCE.(Annexure (Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th PWD, Circular No. CAT-1091/CR-60-Bldg-2 Dt. 14th October 1991 1991, regarding incorporation incorporating additional condition for quality assurance Quality Assurance and Maintaince Maintenance Manual) ). To ensure the specific specified quality of work which will also include necessary surveys, survey temporary works, works etc., . the contractor shall prepare a quality assurance plan and get get, the same approved provided from the Engineer-inIn-charge Charge within one month from the date of work order. For this, the this contractor shall submit an organisation organization chart of his technical personnel to be deployed on the work along with alongwith their qualification, job description descriptions defining the function functions of reporting, supervising, reporting supervising inspecting and approving. The contractor shall also submit a list of tools, tools equipment and the machinery and instrumentation, instrumentation which he proposes to use for the construction and for testing in the field and/or in the laboratory Laboratory and monitoring. The contractor shall modify modify/supplement the organisation organization chart and the list of Machinery/ machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel persons and equipment on the field fields as per the approved chart and the list respectively. The contractor Contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-inIn-chargeCharge. The quality of the work shall be property properly documented through certificatescertificate, records, check lists checks list, and Log book Book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently the supplementary and this will be the responsibility of the contractor. The form forms should be got approved from the Engineer in chargeExecutive Engineer-In-Charge. Clause 59 (2) :Where the work is to be done on xxxlump-sum basis on contractor’s design the contractors designeds. The contractor shall also submit a maintenance manual giving procedure for procedure. For maintenance, with the periodically periodicity of maintenance works including inspections inspection tools of the equipments to be used, used means of accessibility for all pats parts of the structure. He shall also include in the manual, the specification, specification for maintenance works that would be appropriate for his design and designed the technique of construction. This manual shall be submitting submitted within the contract period. Clause 60 60: It is obligatory on the part of agency to procure R.C.C. pipe (ISI ISI) marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill xxxx of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with alongwith the bill xxxx pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes R.C.C. pipes and also items, ,in which the use of R.C.C. pipes is contemplated, contemplated would be released only after fulfillment of the conditions, laid down as above.. Note : In case, provision of this form B-1 conflicts with those in detailed cyclostyled provision and condition attached to this tender, the detailed cyclostyled provision and condition would prevail over those in this form. GENERAL CONDITIONS OF CONTRACT

Appears in 1 contract

Samples: pwd.maharashtra.etenders.in

Relations with Public Authorities. The contractor shall make sufficient arrangement for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to Government. (vide Govt Circular No CST -1086 Xxxx Xxxxxxxx Xx XXX -0000 / CR-243 XX-000 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Clause 5654: The contractor shall comply with all the provision of the Apprentices Act, 1961 and Rules and Orders issued there under from time to time. If he fails to do so, his failure will be breach of the contract and the Superintending Engineer may in his discretion cancel the contract. The contractor shall also be liable for any pecuniary liability arising on account of any violation by him of the provision of the Act Clause 5755: The tender rates are inclusive of all taxes, rates, cesses and are also inclusive of the leviable tax in respect if sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules 58 of Maharashtra Value Added Tax Act-2005. For the purpose of levy of tax. Clause 58 56: In case of material which become surplus with the contractor from those issued for the work contracted from the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale tax will be recovered on such sale. Clause 59(157(1) : QUALITY ASSURANCE AND MAINTENANCE.(Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th Xx 0000-/XX -00/ Xxxx -0 xx 00 xx October 1991 regarding incorporation additional condition for quality assurance and Maintaince Manual) To ensure the specific quality of work which will also include necessary surveys, temporary works, etc., the contractor shall prepare a quality assurance plan and get the same approved from the Engineer-in-charge within one month from the date of work order. For this, the contractor shall submit an organisation chart of his technical personnel to be deployed on the work along with their qualification, job description defining the function of reporting, supervising, inspecting and approving. The contractor shall also submit a list of tools, equipment and the machinery and instrumentation, which he proposes to use for the construction and for testing in the field and/or in the laboratory and monitoring. The contractor shall modify supplement the organisation chart and the list of Machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel and equipment on the field as per the approved chart and the list respectively. The contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-in-charge. The quality of the work shall be property documented through certificates, records, check lists and Log book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently and this will be the responsibility of the contractor. The form should be got approved from the Engineer in charge. Clause 59 57 (2) :Where the work is to be on xxx-sum basis on contractor’s design the contractor shall also submit a maintenance manual giving procedure for maintenance, with the periodically of maintenance works including inspections to be used, means of accessibility for all pats of the structure. He shall also include in the manual, the specification, for maintenance works that would be appropriate for his design and technique of construction. This manual shall be submitting within the contract period. Clause 60 58: It is obligatory on the part of agency to procure R.C.C. pipe (ISI marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill xxxx of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with the bill xxxx pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes and also items, in which the use of R.C.C. pipes is contemplated, would be released only after fulfillment fulfilment of the conditions, laid down as above. the contract period. Clause 59 : Deleted PRICE VARIATION CLAUSE (STATE FUND) 3 (a) (Accompaniment to the Government Resolution Public Works Department No. CAT/06/04/148, Dated :- 16/05/2005) If during the operative period of the Contract as defined in condition (i) below, there shall be any variation, in the Consumer Price Index (New Series) for Industrial Workers for Centre as per the Labour Gazette published by the Commissioner of Labour, Government of Maharashtra and / or in the wholesale Price Index for all commodities prepared by the Office of Economic Adviser, Ministry of Industry, Government of India, or in the price of petrol / oil and lubricants and major Construction materials like Bitumen, Cement, Steel, various types of metal pipes etc., then subject to the other conditions mentioned below, price adjustment on account of

Appears in 1 contract

Samples: ofbcipher.s3.amazonaws.com

Relations with Public Authorities. The contractor shall make sufficient arrangement for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to Government. (vide Govt Circular No CST -1086 Xxxx Xxxxxxxx Xx XXX -0000 / CR-243 XX-000 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Clause 5654: The contractor shall comply with all the provision of the Apprentices Act, 1961 and Rules and Orders issued there under from time to time. If he fails to do so, his failure will be breach of the contract and the Superintending Engineer may in his discretion cancel the contract. The contractor shall also be liable for any pecuniary liability arising on account of any violation by him of the provision of the Act Clause 5755: The tender rates are inclusive of all taxes, rates, cesses and are also inclusive of the leviable tax in respect if sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules 58 of Maharashtra Value Added Tax Act-2005Act- 2005. For the purpose of levy of tax. Clause 58 56: In case of material which become surplus with the contractor from those issued for the work contracted from the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale tax will be recovered on such sale. Clause 59(157(1) : QUALITY ASSURANCE AND MAINTENANCE.(Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th Xx 0000-/XX -00/ Xxxx -0 xx 00 xx October 1991 regarding incorporation additional condition for quality assurance and Maintaince Maintenance Manual) To ensure the specific quality of work which will also include necessary surveys, temporary works, etc., the contractor shall prepare a quality assurance plan and get the same approved from the Engineer-in-charge within one month from the date of work order. For this, the contractor shall submit an organisation chart of his technical personnel to be deployed on the work along with their qualification, job description defining the function of reporting, supervising, inspecting and approving. The contractor shall also submit a list of tools, equipment and the machinery and instrumentation, which he proposes to use for the construction and for testing in the field and/or in the laboratory and monitoring. The contractor shall modify supplement the organisation chart and the list of Machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel and equipment on the field as per the approved chart and the list respectively. The contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-in-charge. The quality of the work shall be property documented through certificates, records, check lists and Log book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently and this will be the responsibility of the contractor. The form should be got approved from the Engineer in charge. Clause 59 57 (2) :Where the work is to be on xxxlump-sum basis on contractor’s design the contractor shall also submit a maintenance manual giving procedure for maintenance, with the periodically of maintenance works including inspections to be used, means of accessibility for all pats of the structure. He shall also include in the manual, the specification, for maintenance works that would be appropriate for his design and technique of construction. This manual shall be submitting within the contract period. Clause 60 58: It is obligatory on the part of agency to procure R.C.C. pipe (ISI marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill xxxx of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with the bill xxxx pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes R.C.C. pipes and also items, in which the use of R.C.C. pipes is contemplated, would be released only after fulfillment fulfilment of the conditions, laid down as above.

Appears in 1 contract

Samples: Government of Maharashtra

Relations with Public Authorities. The contractor shall make sufficient arrangement for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to Government. (vide Govt Circular No CST -1086 Xxxx Xxxxxxxx Xx XXX -0000 / CR-243 XX-000 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Clause 56: The contractor shall comply with all the provision of the Apprentices Act, 1961 and Rules and Orders issued there under from time to time. If he fails to do so, his failure will be breach of the contract and the Superintending Engineer may in his discretion cancel the contract. The contractor shall also be liable for any pecuniary liability arising on account of any violation by him of the provision of the Act Clause 57: The tender rates are inclusive of all taxes, rates, cesses and are also inclusive of the leviable tax in respect if sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules 58 of Maharashtra Value Added Tax Act-2005. For the purpose of levy of tax. Clause 58 : In case of material which become surplus with the contractor from those issued for the work contracted from the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale tax will be recovered on such sale. Clause 59(1) : QUALITY ASSURANCE AND MAINTENANCE.(Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th Xx 0000-/XX -00/ Xxxx -0 xx 00 xx October 1991 regarding incorporation additional condition for quality assurance and Maintaince Manual) To ensure the specific quality of work which will also include necessary surveys, temporary works, etc., the contractor shall prepare a quality assurance plan and get the same approved from the Engineer-in-charge within one month from the date of work order. For this, the contractor shall submit an organisation chart of his technical personnel to be deployed on the work along with their qualification, job description defining the function of reporting, supervising, inspecting and approving. The contractor shall also submit a list of tools, equipment and the machinery and instrumentation, which he proposes to use for the construction and for testing in the field and/or in the laboratory and monitoring. The contractor shall modify supplement the organisation chart and the list of Machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel and equipment on the field as per the approved chart and the list respectively. The contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-in-charge. The quality of the work shall be property documented doone cubic metreented through certificates, records, check lists and Log book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently and this will be the responsibility of the contractor. The form should be got approved from the Engineer in charge. Clause 59 (2) :Where the work is to be on xxx-sum basis on contractor’s design the contractor shall also submit a maintenance manual giving procedure for maintenance, with the periodically of maintenance works including inspections to be used, means of accessibility for all pats of the structure. He shall also include in the manual, the specification, for maintenance works that would be appropriate for his design and technique of construction. This manual shall be submitting within the contract period. Clause 60 : It is obligatory on the part of agency to procure R.C.C. pipe (ISI marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill xxxx of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with the bill xxxx pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes and also items, in which the use of R.C.C. pipes is contemplated, would be released only after fulfillment of the conditions, laid down as above.

Appears in 1 contract

Samples: Government of Maharashtra

Relations with Public Authorities. The contractor shall make sufficient arrangement arrangements for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation regulations, bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to of Government. (vide Govt Circular No CST -1086 / CR-243 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Vide Xxxx. Xxxxxxxx Xx. XXX-0000/XX-000/Xx-Xxxx-0/Xxxxxxxxxx Xxxxxx 000000 dt. 11.8.87) Clause 56: The 56 :- A contractor shall comply with all the provision provisions of the Apprentices Act, . 1961 and the Rules and Orders issued there under from time to time. If he fails to do so, his failure will be a breach of the contract and the Superintending Engineer may may, in his discretion discretion, cancel the contract. The contractor shall also be liable for any an pecuniary liability arising on account of any violation by him of the provision of the Act (vide Xxxx. Xxxxxxxx Xx. XXX - 0000/XX-000 Xx-Xxxxxxxx- 2/Mantralaya, Bombay-400 032, dated 11 Sept. 1987). Clause 57: 57 :- The tender rates are inclusive of all taxes, rates, and cesses and are also inclusive of the s leviable tax in respect if of sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules Rule 58 of Maharashtra Value Added added Tax Act-2005. For Xxx 0000, for the purpose of levy of tax. Tax" Clause 58 : :- In case of material materials which become surplus with the contractor contractors from those issued for the work contracted from for the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale sales tax will be recovered on such sale. Clause 59(1) 59 :-Quality Assurance end Maintenance Manual:- ANNEXURE “A” : QUALITY ASSURANCE AND MAINTENANCE.(Annexure (Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th PWD, Circular No. CAT-1091/CR-60-Bldg-2 Dt. 14th October 1991 1991, regarding incorporation incorporating additional condition for quality assurance Quality Assurance and Maintaince Maintenance Manual) ). To ensure the specific specified quality of work which will also include necessary surveys, survey temporary works, works etc., . the contractor shall prepare a quality assurance plan and get get, the same approved provided from the Engineer-inIn-charge Charge within one month from the date of work order. For this, the this contractor shall submit an organisation organization chart of his technical personnel to be deployed on the work along with alongwith their qualification, job description descriptions defining the function functions of reporting, supervising, reporting supervising inspecting and approving. The contractor shall also submit a list of tools, tools equipment and the machinery and instrumentation, instrumentation which he proposes to use for the construction and for testing in the field and/or in the laboratory Laboratory and monitoring. The contractor shall modify modify/supplement the organisation organization chart and the list of Machinery/ machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel persons and equipment on the field fields as per the approved chart and the list respectively. The contractor Contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-inIn-chargeCharge. The quality of the work shall be property properly documented through certificatescertificate, records, check lists checks list, and Log book Book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently the supplementary and this will be the responsibility of the contractor. The form forms should be got approved from the Engineer in chargeExecutive Engineer-In-Charge. Clause 59 (2) :Where the work is to be done on xxxlump-sum basis on contractor’s design the contractors designs. The contractor shall also submit a maintenance manual giving procedure for procedure. For maintenance, with the periodically periodicity of maintenance works including inspections inspection tools of the equipments to be used, used means of accessibility for all pats parts of the structure. He shall also include in the manual, the specification, specification for maintenance works that would be appropriate for his design and the technique of construction. This manual shall be submitting submitted within the contract period. Clause 60 60: It is obligatory on the part of agency to procure R.C.C. pipe (ISI ISI) marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill xxxx of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with alongwith the bill xxxx pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes R.C.C. pipes and also items, ,in which the use of R.C.C. pipes is contemplated, contemplated would be released only after fulfillment of the conditions, laid down as above.. Note : In case, provision of this form B-1 conflicts with those in detailed cyclostyled provision and condition attached to this tender, the detailed cyclostyled provision and condition would prevail over those in this form. GENERAL CONDITIONS OF CONTRACT

Appears in 1 contract

Samples: maharashtra.etenders.in

Relations with Public Authorities. The contractor shall make sufficient arrangement arrangements for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation regulations, bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to of Government. (vide Govt Circular No CST -1086 / CR-243 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Vide Xxxx. Xxxxxxxx Xx. XXX-0000/XX-000/Xx-Xxxx-0/Xxxxxxxxxx Xxxxxx 000000 dt. 11.8.87) Clause 56: The 56 :- A contractor shall comply with all the provision provisions of the Apprentices Act, . 1961 and the Rules and Orders issued there under from time to time. If he fails to do so, his failure will be a breach of the contract and the Superintending Engineer may C E O may, in his discretion discretion, cancel the contract. The contractor shall also be liable for any an pecuniary liability arising on account of any violation by him of the provision of the Act (vide Xxxx. Xxxxxxxx Xx. XXX - 0000/XX-000 Xx-Xxxxxxxx-0/Xxxxxxxxxx, Bombay-410 032, dated 11 Sept. 1987). Clause 57: 57 :- The tender rates are inclusive of all taxes, rates, and cesses and are also inclusive of the s leviable tax in respect if of sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules Rule 58 of Maharashtra Value Added added Tax Act-2005. For Xxx 0000, for the purpose of levy of tax. Tax" Clause 58 : :- In case of material materials which become surplus with the contractor contractors from those issued for the work contracted from for the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale sales tax will be recovered on such sale. Clause 59(1) 59 :- Quality Assurance and Maintenance Manual:- ANNEXURE “A” : QUALITY ASSURANCE AND MAINTENANCE.(Annexure (Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th PWD, Circular No. CAT-1091/CR-60-Bldg-2 Dt. 14th October 1991 1991, regarding incorporation incorporating additional condition for quality assurance Quality Assurance and Maintaince Maintenance Manual) ). To ensure the specific specified quality of work which will also include necessary surveys, survey temporary works, works etc., . the contractor shall prepare a quality assurance plan and get get, the same approved provided from the Engineer-inIn-charge Charge within one month from the date of work order. For this, the this contractor shall submit an organisation chart of his technical personnel to be deployed on the work along with alongwith their qualification, job description descriptions defining the function functions of reporting, supervising, reporting supervising inspecting and approving. The contractor shall also submit a list of tools, tools equipment and the machinery and instrumentation, instrumentation which he proposes to use for the construction and for testing in the field and/or in the laboratory Laboratory and monitoring. The contractor shall modify modify/supplement the organisation chart and the list of Machinery/ machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel persons and equipment on the field fields as per the approved chart and the list respectively. The contractor Contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-inIn-chargeCharge. The quality of the work shall be property properly documented through certificatescertificate, records, check lists checks list, and Log book Book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently the supplementary and this will be the responsibility of the contractor. The form forms should be got approved from the Engineer in charge. Clause 59 (2) :Where the work is to be on xxxExecutive Engineer-sum basis on contractor’s design the contractor shall also submit a maintenance manual giving procedure for maintenance, with the periodically of maintenance works including inspections to be used, means of accessibility for all pats of the structure. He shall also include in the manual, the specification, for maintenance works that would be appropriate for his design and technique of construction. This manual shall be submitting within the contract period. Clause 60 : It is obligatory on the part of agency to procure R.C.C. pipe (ISI marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with the bill pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes and also items, in which the use of R.C.C. pipes is contemplated, would be released only after fulfillment of the conditions, laid down as aboveIn-Charge.

Appears in 1 contract

Samples: dmer.maharashtra.etenders.in

AutoNDA by SimpleDocs

Relations with Public Authorities. The contractor shall make sufficient arrangement for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to Government. (vide Govt Circular No CST -1086 / CR-243 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Clause 56: The contractor shall comply with all the provision of the Apprentices Act, 1961 and Rules and Orders issued there under from time to time. If he fails to do so, his failure will be breach of the contract and the Superintending Engineer may in his discretion cancel the contract. The contractor shall also be liable for any pecuniary liability arising on account of any violation by him of the provision of the Act Clause 57: The tender rates are inclusive of all taxes, rates, cesses and are also inclusive of the leviable tax in respect if sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules 58 of Maharashtra Value Added Tax Act-2005. For the purpose of levy of tax. Clause 58 : In case of material which become surplus with the contractor from those issued for the work contracted from the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale tax will be recovered on such sale. Clause 59(1) : QUALITY ASSURANCE AND MAINTENANCE.(Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th October 1991 regarding incorporation additional condition for quality assurance and Maintaince Manual) To ensure the specific quality of work which will also include necessary surveys, temporary works, etc., the contractor shall prepare a quality assurance plan and get the same approved from the Engineer-in-charge within one month from the date of work order. For this, the contractor shall submit an organisation chart of his technical personnel to be deployed on the work along with their qualification, job description defining the function of reporting, supervising, inspecting and approving. The contractor shall also submit a list of tools, equipment and the machinery and instrumentation, which he proposes to use for the construction and for testing in the field and/or in the laboratory and monitoring. The contractor shall modify supplement the organisation chart and the list of Machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel and equipment on the field as per the approved chart and the list respectively. The contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-in-charge. The quality of the work shall be property documented through certificates, records, check lists and Log book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently and this will be the responsibility of the contractor. The form should be got approved from the Engineer in charge. Clause 59 (2) :Where the work is to be on xxx-sum basis on contractor’s design the contractor shall also submit a maintenance manual giving procedure for maintenance, with the periodically of maintenance works including inspections to be used, means of accessibility for all pats of the structure. He shall also include in the manual, the specification, for maintenance works that would be appropriate for his design and technique of construction. This manual shall be submitting within the contract period. Clause 60 : It is obligatory on the part of agency to procure R.C.C. pipe (ISI marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with the bill pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes and also items, in which the use of R.C.C. pipes is contemplated, would be released only after fulfillment of the conditions, laid down as above.. GENERAL CONDITIONS OF CONTRACT

Appears in 1 contract

Samples: pwd.maharashtra.etenders.in

Relations with Public Authorities. The contractor shall make sufficient arrangement arrangements for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation regulations, bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to of Government. (vide Govt Circular No CST -1086 / CR-243 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Vide Xxxx. Xxxxxxxx Xx. XXX-0000/XX-000/Xx-Xxxx- 0/Xxxxxxxxxx Xxxxxx 000000 dt. 11.8.87) Clause 56: The 56 :- A contractor shall comply with all the provision provisions of the Apprentices Act, . 1961 and the Rules and Orders issued there under from time to time. If he fails to do so, his failure will be a breach of the contract and the Superintending Engineer may may, in his discretion discretion, cancel the contract. The contractor shall also be liable for any an pecuniary liability arising on account of any violation by him of the provision of the Act (vide Xxxx. Xxxxxxxx Xx. XXX - 0000/XX-000 Xx-Xxxxxxxx- 2/Mantralaya, Bombay-400 032, dated 11 Sept. 1987). Clause 57: 57 :- The tender rates are inclusive of all taxes, rates, and cesses and are also inclusive of the s leviable tax in respect if of sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules Rule 58 of Maharashtra Value Added added Tax Act-2005. For Xxx 0000, for the purpose of levy of tax. Tax" Clause 58 : :- In case of material materials which become surplus with the contractor contractors from those issued for the work contracted from for the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale sales tax will be recovered on such sale. Clause 59(1) 59 :-Quality Assurance end Maintenance Manual:- ANNEXURE “A” : QUALITY ASSURANCE AND MAINTENANCE.(Annexure (Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th PWD, Circular No. CAT-1091/CR-60-Bldg-2 Dt. 14th October 1991 1991, regarding incorporation incorporating additional condition for quality assurance Quality Assurance and Maintaince Maintenance Manual) ). To ensure the specific specified quality of work which will also include necessary surveys, survey temporary works, works etc., . the contractor shall prepare a quality assurance plan and get get, the same approved provided from the Engineer-inIn-charge Charge within one month from the date of work order. For this, the this contractor shall submit an organisation organization chart of his technical personnel to be deployed on the work along with alongwith their qualification, job description descriptions defining the function functions of reporting, supervising, reporting supervising inspecting and approving. The contractor shall also submit a list of tools, tools equipment and the machinery and instrumentation, instrumentation which he proposes to use for the construction and for testing in the field and/or in the laboratory Laboratory and monitoring. The contractor shall modify modify/supplement the organisation organization chart and the list of Machinery/ machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel persons and equipment on the field fields as per the approved chart and the list respectively. The contractor Contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-inIn-chargeCharge. The quality of the work shall be property properly documented through certificatescertificate, records, check lists checks list, and Log book Book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently the supplementary and this will be the responsibility of the contractor. The form forms should be got approved from the Engineer in chargeExecutive Engineer-In-Charge. Clause 59 (2) :Where the work is to be done on xxxlump-sum basis on contractor’s design the contractors designs. The contractor shall also submit a maintenance manual giving procedure for procedure. For maintenance, with the periodically periodicity of maintenance works including inspections inspection tools of the equipments to be used, used means of accessibility for all pats parts of the structure. He shall also include in the manual, the specification, specification for maintenance works that would be appropriate for his design and the technique of construction. This manual shall be submitting submitted within the contract period. Clause 60 60: It is obligatory on the part of agency to procure R.C.C. pipe (ISI ISI) marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill xxxx of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with the bill xxxx pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes R.C.C. pipes and also items, in which the use of R.C.C. pipes is contemplated, contemplated would be released only after fulfillment of the conditions, laid down as above.. Note : In case, provision of this form B-1 conflicts with those in detailed cyclostyled provision and condition attached to this tender, the detailed cyclostyled provision and condition would prevail over those in this form. GENERAL CONDITIONS OF CONTRACT

Appears in 1 contract

Samples: maharashtra.etenders.in

Relations with Public Authorities. The contractor shall make sufficient arrangement arrangements for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation regulations, bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to of Government. (vide Govt Circular No CST -1086 / CR-243 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Vide Xxxx. Xxxxxxxx Xx. XXX-0000/XX-000/Xx-Xxxx- 0/Xxxxxxxxxx Xxxxxx 000000 dt. 11.8.87) Clause 56: The 56 :- A contractor shall comply with all the provision provisions of the Apprentices Act, . 1961 and the Rules and Orders issued there under from time to time. If he fails to do so, his failure will be a breach of the contract and the Superintending Engineer may may, in his discretion discretion, cancel the contract. The contractor shall also be liable for any an pecuniary liability arising on account of any violation by him of the provision of the Act (vide Xxxx. Xxxxxxxx Xx. XXX - 0000/XX-000 Xx-Xxxxxxxx-0/Xxxxxxxxxx, Bombay-400 032, dated 11 Sept. 1987). Clause 57: 57 :- The tender rates are inclusive inclusIV Ae of all taxes, rates, and cesses and are also inclusive inclusIV Ae of the s leviable tax in respect if of sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules Rule 58 of Maharashtra Value Added added Tax Act-2005. For Xxx 0000, for the purpose of levy of tax. Tax" Clause 58 : :- In case of material materials which become surplus with the contractor contractors from those issued for the work contracted from for the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale sales tax will be recovered on such sale. Clause 59(1) 59 :-Quality Assurance end Maintenance Manual:- ANNEXURE “A” : QUALITY ASSURANCE AND MAINTENANCE.(Annexure (Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th PWD, Circular No. CAT- 1091/CR-60-Bldg-2 Dt. 14th October 1991 1991, regarding incorporation incorporating additional condition for quality assurance Quality Assurance and Maintaince Maintenance Manual) ). To ensure the specific specified quality of work which will also include necessary surveys, survey temporary works, works etc., . the contractor shall prepare a quality assurance plan and get get, the same approved provided from the Engineer-inIn-charge Charge within one month from the date of work order. For this, the this contractor shall submit an organisation organization chart of his technical personnel to be deployed on the work along with alongwith their qualification, job description descriptions defining the function functions of reporting, supervising, reporting supervising inspecting and approving. The contractor shall also submit a list of tools, tools equipment and the machinery and instrumentation, instrumentation which he proposes to use for the construction and for testing in the field and/or in the laboratory Laboratory and monitoring. The contractor shall modify modify/supplement the organisation organization chart and the list of Machinery/ machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel persons and equipment on the field fields as per the approved chart and the list respectively. The contractor Contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-inIn-chargeCharge. The quality of the work shall be property properly documented through certificatescertificate, records, check lists checks list, and Log book Book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently the supplementary and this will be the responsibility of the contractor. The form forms should be got approved from the Engineer in chargeExecutive Engineer-In-Charge. Clause 59 (2) :Where the work is to be done on xxxlump-sum basis on contractor’s design the contractors designs. The contractor shall also submit a maintenance manual giving procedure for gIV Aing procedure. For maintenance, with the periodically periodicity of maintenance works including inspections inspection tools of the equipments to be used, used means of accessibility for all pats parts of the structure. He shall also include in the manual, the specification, specification for maintenance works that would be appropriate for his design and the technique of construction. This manual shall be submitting submitted within the contract period. Clause 60 60: It is obligatory on the part of agency to procure R.C.C. pipe (ISI ISI) marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill xxxx of M.S.S.I.D.C. certification of the Divisional DIV Aisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with alongwith the bill xxxx pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes R.C.C. pipes and also items, ,in which the use of R.C.C. pipes is contemplated, contemplated would be released only after fulfillment of the conditions, laid down as above.. Note : In case, provision of this form B-1 conflicts with those in detailed cyclostyled provision and condition attached to this tender, the detailed cyclostyled provision and condition would prevail over those in this form. GENERAL CONDITIONS OF CONTRACT

Appears in 1 contract

Samples: maharashtra.etenders.in

Relations with Public Authorities. The contractor shall make sufficient arrangement arrangements for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation regulations, bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to of Government. (vide Govt Circular No CST -1086 / CR-243 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Vide Xxxx. Xxxxxxxx Xx. XXX-0000/XX-000/Xx-Xxxx- 0/Xxxxxxxxxx Xxxxxx 000000 dt. 11.8.87) Clause 56: The 56 :- A contractor shall comply with all the provision provisions of the Apprentices Act, . 1961 and the Rules and Orders issued there under from time to time. If he fails to do so, his failure will be a breach of the contract and the Superintending Engineer may may, in his discretion discretion, cancel the contract. The contractor shall also be liable for any an pecuniary liability arising on account of any violation by him of the provision of the Act (vide Xxxx. Xxxxxxxx Xx. XXX - 0000/XX-000 Xx-Xxxxxxxx-0/Xxxxxxxxxx, Bombay-400 032, dated 11 Sept. 1987). Clause 57: 57 :- The tender rates are inclusive of all taxes, rates, and cesses and are also inclusive of the s leviable tax in respect if of sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules Rule 58 of Maharashtra Value Added added Tax Act-2005. For Xxx 0000, for the purpose of levy of tax. Tax" Clause 58 : :- In case of material materials which become surplus with the contractor contractors from those issued for the work contracted from for the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale sales tax will be recovered on such sale. Clause 59(1) 59 :-Quality Assurance end Maintenance Manual:- ANNEXURE “A” : QUALITY ASSURANCE AND MAINTENANCE.(Annexure (Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th PWD, Circular No. CAT- 1091/CR-60-Bldg-2 Dt. 14th October 1991 1991, regarding incorporation incorporating additional condition for quality assurance Quality Assurance and Maintaince Maintenance Manual) ). To ensure the specific specified quality of work which will also include necessary surveys, survey temporary works, works etc., . the contractor shall prepare a quality assurance plan and get get, the same approved provided from the Engineer-inIn-charge Charge within one month from the date of work order. For this, the this contractor shall submit an organisation organization chart of his technical personnel to be deployed on the work along with alongwith their qualification, job description descriptions defining the function functions of reporting, supervising, reporting supervising inspecting and approving. The contractor shall also submit a list of tools, tools equipment and the machinery and instrumentation, instrumentation which he proposes to use for the construction and for testing in the field and/or in the laboratory Laboratory and monitoring. The contractor shall modify modify/supplement the organisation organization chart and the list of Machinery/ machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel persons and equipment on the field fields as per the approved chart and the list respectively. The contractor Contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-inIn-chargeCharge. The quality of the work shall be property properly documented through certificatescertificate, records, check lists checks list, and Log book Book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently the supplementary and this will be the responsibility of the contractor. The form forms should be got approved from the Engineer in chargeExecutive Engineer-In-Charge. Clause 59 (2) :Where the work is to be done on xxxlump-sum basis on contractor’s design the contractors designs. The contractor shall also submit a maintenance manual giving procedure for procedure. For maintenance, with the periodically periodicity of maintenance works including inspections inspection tools of the equipments to be used, used means of accessibility for all pats parts of the structure. He shall also include in the manual, the specification, specification for maintenance works that would be appropriate for his design and the technique of construction. This manual shall be submitting submitted within the contract period. Clause 60 60: It is obligatory on the part of agency to procure R.C.C. pipe (ISI ISI) marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill xxxx of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with alongwith the bill xxxx pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes R.C.C. pipes and also items, ,in which the use of R.C.C. pipes is contemplated, contemplated would be released only after fulfillment of the conditions, laid down as above.. Note : In case, provision of this form B-1 conflicts with those in detailed cyclostyled provision and condition attached to this tender, the detailed cyclostyled provision and condition would prevail over those in this form. GENERAL CONDITIONS OF CONTRACT

Appears in 1 contract

Samples: maharashtra.etenders.in

Relations with Public Authorities. The contractor shall make sufficient arrangement arrangements for draining away the sludge water as well as water coming from the bathing and washing places and shall dispose off this water in such a way so as not to cause any substance. He shall also keep the premise clean by employing sufficient number of sweepers. The contractor shall comply with all rules, regulation regulations, bylaws and directions given from time to time by any local or public authority in connection with this work and shall pay fees or charges which are leviable on him without any extra cost to of Government. (vide Govt Circular No CST -1086 / CR-243 /Ka Building 2 /Mantralaya Bombay dt 11 September 1987 Vide Xxxx. Xxxxxxxx Xx. XXX- 0000/XX-000/Xx-Xxxx-0/Xxxxxxxxxx Xxxxxx 000000 dt. 11.8.87) Clause 56: The 56 :- A contractor shall comply with all the provision provisions of the Apprentices Act, . 1961 and the Rules and Orders issued there under from time to time. If he fails to do so, his failure will be a breach of the contract and the Superintending Engineer may C E O may, in his discretion discretion, cancel the contract. The contractor shall also be liable for any an pecuniary liability arising on account of any violation by him of the provision of the Act (vide Xxxx. Xxxxxxxx Xx. XXX - 0000/XX-000 Xx- Xxxxxxxx-0/Xxxxxxxxxx, Bombay-410 032, dated 11 Sept. 1987). Clause 57: 57 :- The tender rates are inclusive of all taxes, rates, and cesses and are also inclusive of the s leviable tax in respect if of sale by transfer of property in goods involved in the execution of a work contract under the provision of Rules Rule 58 of Maharashtra Value Added added Tax Act-2005. For Xxx 0000, for the purpose of levy of tax. Tax" Clause 58 : :- In case of material materials which become surplus with the contractor contractors from those issued for the work contracted from for the date of ascertainment of the materials as being surplus will be taken as the date of sale for the purpose of sales tax and sale sales tax will be recovered on such sale. Clause 59(1) 59 :- Quality Assurance and Maintenance Manual:- ANNEXURE “A” : QUALITY ASSURANCE AND MAINTENANCE.(Annexure (Annexure to the P.W.D circular No 1091-/CR -60/ Bldg -2 dt 14 th PWD, Circular No. CAT- 1091/CR-60-Bldg-2 Dt. 14th October 1991 1991, regarding incorporation incorporating additional condition for quality assurance Quality Assurance and Maintaince Maintenance Manual) ). To ensure the specific specified quality of work which will also include necessary surveys, survey temporary works, works etc., . the contractor shall prepare a quality assurance plan and get get, the same approved provided from the Engineer-inIn-charge Charge within one month from the date of work order. For this, the this contractor shall submit an organisation chart of his technical personnel to be deployed on the work along with alongwith their qualification, job description descriptions defining the function functions of reporting, supervising, reporting supervising inspecting and approving. The contractor shall also submit a list of tools, tools equipment and the machinery and instrumentation, instrumentation which he proposes to use for the construction and for testing in the field and/or in the laboratory Laboratory and monitoring. The contractor shall modify modify/supplement the organisation chart and the list of Machinery/ machinery/ equipment etc. as per the direction of the Superintending Engineer and shall deploy the personnel persons and equipment on the field fields as per the approved chart and the list respectively. The contractor Contractor shall submit written method statements dealing his exact proposal of execution of the work in accordance with the specification. He will have to get these approved from the Engineer-in-chargeIn- Charge. The quality of the work shall be property properly documented through certificatescertificate, records, check lists checks list, and Log book Book of results etc. such records shall be complied from the beginning of the work and be continuously updated subsequently the supplementary and this will be the responsibility of the contractor. The form forms should be got approved from the Engineer in charge. Clause 59 (2) :Where the work is to be on xxxExecutive Engineer-sum basis on contractor’s design the contractor shall also submit a maintenance manual giving procedure for maintenance, with the periodically of maintenance works including inspections to be used, means of accessibility for all pats of the structure. He shall also include in the manual, the specification, for maintenance works that would be appropriate for his design and technique of construction. This manual shall be submitting within the contract period. Clause 60 : It is obligatory on the part of agency to procure R.C.C. pipe (ISI marked) required for the work from the M.S.S.I.D.C. only. The proof of such procurement like bill of M.S.S.I.D.C. certification of the Divisional Manager M.S.S.I.D.C. to that effect will have to be enclosed along with the bill pertaining to the work concerned. The payment towards the procurement of R.C.C.pipes and also items, in which the use of R.C.C. pipes is contemplated, would be released only after fulfillment of the conditions, laid down as aboveIn-Charge.

Appears in 1 contract

Samples: dmer.maharashtra.etenders.in

Time is Money Join Law Insider Premium to draft better contracts faster.