Reinforcing Bars Sample Clauses

Reinforcing Bars. Deformed reinforcing steel conforming to Specifications for Deformed and Plain Billet- Steel Bars for Concrete Reinforcement (ASTM A-615), for concrete reinforcement. All bars shall be lapped and placed in accordance with ACI requirements and specifications.
AutoNDA by SimpleDocs
Reinforcing Bars. All reinforcing bars shall be high yield deform bars conforming to the American Society for Testing and Materials (“ASTM”) A615M /AASHTO M3 with the following properties: Type fy (psi) E (N/mm2) Grade 60 60,000 197,000

Related to Reinforcing Bars

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Pruning Nondestructive thinning of lateral branches to enhance views or trimming, shaping, thinning or pruning of a tree necessary to its health and growth is allowed, consistent with the following standards:

  • Cement Cement to be used for the work shall comply the following and shall be used with the prior approval of Engineer -in -charge

  • FINISHES Buyer(s) understands that the location of telephone, electric, cable TV and other utility outlets, doors, windows, air conditioning components, lighting fixtures, equipment and fixtures are subject to change and Buyer(s) understands that materials such as brick, wood, wood grain, carpeting, paint, cabinets, cultured marble, tile, Formica, granite and the like are subject to shading and gradation and may vary from samples, models or color charts, and from piece to piece, and Contractor shall not be liable for such variations.

  • Prosthetics Crowns and Bridges (Plan B) paying for 60% of the approved Schedule of Fees.

  • FABRICATION Making up data or results and recording or reporting them.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Overbuilds Sprint will not provide non-discriminatory access to FTTH Loop or FTTC Loop on an unbundled basis when Sprint has deployed a FTTH Loop or FTTC Loop parallel to, or in replacement of, an existing loop facility, except that:

  • Caching The Participating Institutions and the Authorized Users are authorized in the course of an automatic process of an internet browser or any other software to make temporary local digital copies of the Licensed Materials in order to ensure proper operation and use of such internet browser or for proper functioning of such software. For the avoidance of doubt, the cached copy is not a derivative work.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

Time is Money Join Law Insider Premium to draft better contracts faster.