Refusal To Work Following Investigation Sample Clauses

Refusal To Work Following Investigation. Where, following the investigation or any steps taken to deal with the circumstances that caused the worker to refuse to work or do particular work, the worker has reasonable grounds to believe that.
AutoNDA by SimpleDocs

Related to Refusal To Work Following Investigation

  • Incident Notice and Remediation If Contractor becomes aware of any Incident, it shall notify the State immediately and cooperate with the State regarding recovery, remediation, and the necessity to involve law enforcement, as determined by the State. Unless Contractor can establish that none of Contractor or any of its agents, employees, assigns or Subcontractors are the cause or source of the Incident, Contractor shall be responsible for the cost of notifying each person who may have been impacted by the Incident. After an Incident, Contractor shall take steps to reduce the risk of incurring a similar type of Incident in the future as directed by the State, which may include, but is not limited to, developing and implementing a remediation plan that is approved by the State at no additional cost to the State.

  • Search, Enquiry, Investigation, Examination And Verification a. The Property is sold on an “as is where is basis” subject to all the necessary inspection, search (including but not limited to the status of title), enquiry (including but not limited to the terms of consent to transfer and/or assignment and outstanding charges), investigation, examination and verification of which the Purchaser is already advised to conduct prior to the auction and which the Purchaser warrants to the Assignee has been conducted by the Purchaser’s independent legal advisors at the time of execution of the Memorandum.

  • Exclusive Negotiations The State will not bargain collectively or meet with any employee organization other than MSEA-SEIU with reference to terms and conditions of employment of employees covered by this Agreement. If any such organizations request meetings they will be advised by the State to transmit their requests concerning terms and conditions of employment to MSEA-SEIU.

  • Obligation to Defend; Notice; Cooperation Whenever a claim arises for indemnification under this Section (the “Claim”), the relevant Indemnitee, as appropriate, will promptly notify the Indemnifying party and request the Indemnifying Party to defend the same. Failure to so notify the Indemnifying Party will not relieve the Indemnifying Party of any liability that the Indemnifying Party might have, except to the extent that such failure prejudices the Indemnifying Party's rights or ability to defend such Claim. The Indemnifying Party will have the right to defend against such Claim in which event the Indemnifying Party will give written notice to the Indemnitee of acceptance of the defense of such Claim and the identity of counsel selected by the Indemnifying Party. Except as set forth below, such notice to the relevant Indemnitee will give the Indemnifying Party full authority to defend, adjust, compromise, or settle such Claim with respect to which such notice has been given, except to the extent that any compromise or settlement might prejudice the Intellectual Property Rights or other rights of the relevant Indemnities. The Indemnifying Party will consult with the relevant Indemnitee prior to any compromise or settlement that would affect the Intellectual Property Rights or other rights of any Indemnitee, and the relevant Indemnitee will have the right to refuse such compromise or settlement and, at such Indemnitee’s sole cost, to take over defense of such Claim. Provided, however, that in such event the Indemnifying Party will not be responsible for, nor will it be obligated to indemnify the relevant Indemnitee against any damages, costs, expenses, or liabilities, including without limitation, attorneys’ fees, in excess of such refused compromise or settlement. With respect to any defense accepted by the Indemnifying Party, the relevant Indemnitee will be entitled to participate with the Indemnifying Party in such defense if the Claim requests equitable relief or other relief (other than monetary damages) that could affect the rights of the Indemnitee and also will be entitled to employ separate counsel for such defense at such Indemnitee's expense. In the event the Indemnifying Party does not accept the defense of any indemnified Claim as provided above, the relevant Indemnitee will have the right to employ counsel for such defense at the expense of the Indemnifying Party, and the Indemnifying Party shall be liable for all costs associated with Indemnitee’s defense of such Claim including court costs, and any settlement or damages awarded a third party. Each Party agrees to cooperate and to cause its employees and agents to cooperate with the other Party in the defense of any such Claim.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Environmental Inspection at End of Agreement Term A. At Authority’s discretion, at least one hundred and twenty (120) days before the expiration or early termination of the Term as provided herein, Company will conduct an environmental inspection and examination of the Company Premises. At its discretion, Authority may complete environmental reviews to determine if recognized environmental conditions exist that could warrant soil and groundwater sampling. If warranted by the findings of Company or Authority’s inspection or if requested by Authority, a compliance audit or site assessment will be performed within the aforementioned time period by a qualified professional acceptable to Authority who will report the findings to Authority. The cost for professional consulting or engineering services required for such audit will be at the expense of Company. If a site assessment is conducted, Company agrees to pay all associated laboratory and testing fees incurred to test and analyze samples collected during the site assessment process. The Authority may also choose to conduct the compliance audit or site assessment. If the results of the assessment indicate that the Company Premises have been impacted by the release of Hazardous Substances, Company will immediately take such action as is necessary and will provide a substantial guaranty in a form and content acceptable to Authority that Company will clean up the contamination at its own expense, at no expense to Authority, and in accordance with Applicable Laws to the extent that it is obligated to do so by virtue of the foregoing provisions of this Article.

  • Inspection Period Buyer shall be under no obligation to purchase the Property or otherwise perform under this Agreement unless Buyer determines the Property to be, in all respects, suitable for its intended purposes. The decision as to whether the Property is suitable for its intended purposes shall be the sole decision of Buyer, determined in the absolute discretion of Buyer, with Buyer’s decision being final and binding upon both Parties. Buyer shall have until , 20 , at : ☐ AM ☐ PM to notify Seller of its termination of this Agreement due to Buyer's determination that the Property is unsuitable for its intended purpose ("Inspection Period"). In the event Buyer elects to terminate this Agreement, Buyer shall provide written notice of termination to Seller prior to the expiration of the Inspection Period. In the event Buyer provides said notice of termination, Seller and any Escrow Agent shall be obligated to return the Escrow Money to the Buyer as provided in Section V hereof, and neither party shall have any further rights or obligations under this Agreement. In the event Buyer does not submit written notice of termination prior to the expiration of the Inspection Period, the Buyer shall be deemed to be satisfied with its inspections of the Property and this contingency shall be deemed to be fulfilled. The Seller, at no expense, shall fully cooperate with Buyer in obtaining any and all approvals required from any Federal, State, or Local Government ("Governmental Approvals") necessary for Buyer to satisfy their needs during the Inspection Period for the suitability of the Property. Said Governmental Approvals shall be obtained during the Inspection Period unless the Parties agree otherwise. Any additional agreements related to this Section must be done in writing and attached to this Agreement.

  • Response/Compliance with Audit or Inspection Findings A. Grantee must act to ensure its and its Subcontractors’ compliance with all corrections necessary to address any finding of noncompliance with any law, regulation, audit requirement, or generally accepted accounting principle, or any other deficiency identified in any audit, review, or inspection of the Contract and the services and Deliverables provided. Any such correction will be at Grantee’s or its Subcontractor's sole expense. Whether Xxxxxxx's action corrects the noncompliance shall be solely the decision of the System Agency.

  • Obligation to Notify Owner of Existing Hazardous Materials The Contractor shall immediately notify the Owner and the Design Professional, both orally and in writing, of the presence and location of any physical evidence of, or information regarding the presence of Hazardous Materials at the Site of which it becomes aware. If the Contractor encounters Hazardous Materials on the Site the Contractor shall (i) immediately stop performance of Work or that portion of the Work affected by or affecting such Hazardous Materials; (ii) secure the contaminated area against intrusion; (iii) not disturb or remove the Hazardous Materials; (iv) not proceed, or allow any subcontractor or supplier to proceed, with any Work or other activities in the area affected by such Hazardous Materials until such materials have been properly remediated and until directed in writing to do so by the Owner; and, (v) take any other steps necessary to protect life and health and the surrounding environment. The Contractor shall be entitled to adjustment of the Contract Time and the Contract Sum pursuant to Section 5, Part 2 of these General Conditions in order to compensate for the impact of any required demolition, re-work, shutdown, delay, protection of work, disruption, and start-up resulting from the encountering of such Hazardous Materials on the Site for which the Contractor is not responsible.