Refractory Work Sample Clauses

Refractory Work. The following additional terms and conditions shall only apply with respect to work performed by Employees engaged in Refractory Work.
AutoNDA by SimpleDocs
Refractory Work. Refractory laborers shall receive the same travel time allowances and subsis- tence received by any other trade on refractory work provided, however, that it is not a lesser amount than in this Agreement.
Refractory Work. Refer to Article XXV for provisions relating to Refractory Work.
Refractory Work 

Related to Refractory Work

  • Dirty Work Where an employee and their supervisor agree that work (other than ship repair work) is of an unusually dirty or offensive nature, the employee shall be entitled to 43 cents per hour extra. Where an employee and their supervisor agree that certain ship repair work is of an unusually dirty or offensive nature, the employee shall be entitled to 58 cents per hour extra.

  • Project Work PURCHASER shall complete the following projects in accordance with the specifications provided in Exhibits B, C, D, E, and F and written instructions from STATE. Project locations are shown on Exhibit A unless otherwise described. PURCHASER shall furnish all material unless otherwise specified.

  • Extra Work At any time during the Term of this Agreement, City may request that Consultant perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • Site Work An expansion of the Connecting Transmission Owner’s Boonville Station is required to accommodate the CTOIFs. The southern corner of the fence line will be expanded out by approximately 3,200 square feet. The Connecting Transmission Owner already owns the property required for the expansion. Approximately 120 feet of the existing fencing will need to be removed and approximately 150 feet of new fencing added.

  • Shift Work Shift work is work not in excess of ordinary hours (ie 38 hours per week), but carried out wholly or partly between the hours of 7.00pm and 7.00am, Monday to Friday. Shift work is work scheduled at least 24 hours prior to the commencement of the shift. Employees required to work shift work will be paid at time and one quarter of the ordinary rate per hour for ordinary hours worked.

  • Outside Work All work necessary to the assembling, installation, erection, operation, maintenance, repair, control, in- spection and supervision of all electrical apparatus, devices, wires, cables, supports, insulators, conduc- tors, ducts and raceways when part of distributing systems outside of buildings, railroads and outside the directly related railroad property and yards. In- stalling and maintaining the catenary and trolley work on railroad property, and bonding of rails. All underground ducts and cables when they are in- stalled by and are part of the system of a distrib- uting company, except in power stations during new construction, including ducts and cables to adjacent switch racks or substations. All outdoor substations and electrical connections up to and including the setting of transformers and the connecting of the secondary buses thereto. Outside work to include renewable electrical energy sources such as solar photovoltaic, geothermal, wind, biomass, wave, etc., and other distributed en- ergy installations such as fuel cells, microturbines, etc.

  • STOP WORK (a) SELLER shall stop Work for up to ninety (90) days in accordance with any written notice received from LOCKHEED XXXXXX, or for such longer period of time as the parties may agree and shall take all reasonable steps to minimize the incurrence of costs allocable to the Work during the period of Work stoppage.

  • Curriculum Work Service on a District curriculum committee shall be required for grade level or department chairpersons. All other teachers working on such committee(s) shall be designated (in writing) by the Curriculum Director and shall be paid, at the hourly rate contained in Schedule B, for all documented hours of committee service (up to such limits as may be imposed by the District) occurring when school is not in session (e.g. during the summer), during duty-free lunch periods or preparation periods, and before/after the teacher’s regularly scheduled work day. Curriculum committee work shall occur at such times as are determined or approved by the Curriculum Director.

  • School Improvement Plans The School shall develop and implement a School Improvement Plan as required by section 1002.33(9)(n), Florida Statutes and applicable State Board of Education Rules or applicable federal law.

  • Contractor’s Equipment Payment for required equipment owned by the Construction Manager or an affiliate of the Construction Manager will be based solely on an hourly rate derived by dividing the current appropriate monthly rate by 176 hours. No payment will be made under any circumstances for repair costs, freight and transportation charges, fuel, lubricants, insurance, any other costs and expenses, or overhead and profit. Payment for such equipment made idle by delays attributable to the Government will be based on one-half the derived hourly rate under this subsection.

Time is Money Join Law Insider Premium to draft better contracts faster.