Reference Manual Sample Clauses

Reference Manual. 10The exception to this statement is the website of the HTE edition incorporated into the OED, which coins web addresses that identify lexical senses as well as categories. 11McCracken, ‘The Exploitation of Dictionary Data and Metadata’, p. 512. 12Ibid. 13Ibid., p. 511. projects have already successfully adopted it or are in the process of adopting it – merits its recommendation as digital form in which to share lexicographical resources.14 But what exactly is RDF/OWL and what are the characteristics attributed to this “standard formalism for information graphs”? RDF and OWL are fundamental standards within the Semantic Web.15 This Web is, in essence, one of linked data, built on top of a set of data standards and technologies that aim to add “well-defined meaning” to information.16 These standards and technologies provide an “infrastructure for publishing, storing, retrieving, reusing, integrating, and analyzing data”.17 Its data form, open for anyone to use, is comprised of statements (or triples) that together form a network of information, one in which concepts are identified by IRIs (often in the form of web addresses or URLs).18 The use of IRIs allows for capturing and identifying data, reusing terminology defined elsewhere, and connecting information found in different digital resources. In effect, this identification mechanism enables thesaurus content to be reused, extended with custom labels and with links to other digital resources. These characteristics of the data form offer intrinsic support for many of the DWBP best practices and facilitate achieving the remaining ones. The underlying data format for Semantic Web information, RDF, is therefore mentioned explicitly in the DWBP documentation as highly suitable for publications on the Web. OWL provides an additional layer of expression that can be used on top of RDF for situations in which highly formal definitions and inferencing mechanisms are required.19 For more informal levels of expression, other Semantic Web standards, such as SKOS, are an alternative to OWL.20 Together, Semantic Web standards offer a well-defined formalism for information graphs. Moreover, they are said to support the functionality desired of historical language thesauri as identified in Chapter 2, since the infrastructure of the Semantic Web allows data to be “retrieved, accessed, reused, and integrated in a meaningful way”.21 Perceived benefits in using this data form are mentioned by Xxxxxxxxx Xxxxxxxx et al.22 One o...
AutoNDA by SimpleDocs
Reference Manual. For its facility, HBMS agrees to document in detail (e.g. in a reference manual), the methodologies used to determine the PM emission intensity as required by Section 9.1.
Reference Manual. For each of its facilities, Vale agrees to document in detail (e.g. in a reference manual), the methodologies used to determine the PM emission intensity and sulphur capture rate or sulphur dioxide mass emission limit as required by Section 9.1.
Reference Manual. For its facility, CEZinc agrees to document in detail (e.g. in a reference manual), the methodologies used to determine the PM emission intensity and sulphur capture rate as required by Section 9.1.
Reference Manual. For its facility, Teck agrees to document in detail (e.g. in a reference manual), the methodologies used to determine the PM emission intensity and sulphur capture rate as required by Section 9.1.
Reference Manual. For each of its facilities, Glencore agrees to document in detail (e.g. in a reference manual), the methodologies used to determine the PM emission intensity and sulphur capture rate as required by Section 9.1.

Related to Reference Manual

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Reference Materials The Board agrees to continue to make available to employees the reference materials maintained by the district. Principals are encouraged to provide additional reference materials of high use in schools where feasible.

  • Reference Description Dates E/CAM/0305 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0306 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0307 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0308 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0309 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0310 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0311 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 Reference Description Dates E/CAM/0312 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0313 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0314 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0315 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0316 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0317 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0318 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0319 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0320 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0321 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0322 Deeds Grounds in Xxxxxxxx Xxxxxx xxx Xxxxxxx Xxxxxx; 1-21 (incl) St Paul's Terace, King's Road; six messuages in Canal Terrace, fronting Regent's Canal 1824-1832

  • REFERENCE STANDARDS A. Standards, Specifications, Codes, Laws, and Regulations

  • Contractor Personnel – Reference Checks The Contractor warrants that all persons employed to provide service under this Contract have satisfactory past work records indicating their ability to adequately perform the work under this Contract. Contractor’s employees assigned to this project must meet character standards as demonstrated by background investigation and reference checks, coordinated by the agency/department issuing this Contract.

  • Offense Level Calculations i. The base offense level is 7, pursuant to Guideline § 2B1.1(a)(1).

  • Technical Requirements for SCPs/Databases 10.5.3.1 BellSouth shall provide physical access to SCPs through the SS7 network and protocols with TCAP as the application layer protocol.

  • Submission of Grievance Information a) Upon appointment of the arbitrator, the appealing party shall within five days after notice of appointment forward to the arbitrator, with a copy to the School Board, the submission of the grievance which shall include the following:

  • Operational Manual (a) The Multiplex Licensee agrees to develop an operational manual in consultation with all Access Seekers to deal with technical and operational matters that arise under or in connection with this Agreement, or the supply of the Multiplex Transmission Service (Operational Manual).

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

Time is Money Join Law Insider Premium to draft better contracts faster.