GARBAGE DISPOSAL, RECYCLING, AND BIODEGRADABLE MATERIALS A. Concessionaire shall be responsible for maintaining the cleanliness of the Concession Premises. Concessionaire shall ensure placement of all garbage and trash generated by the Concession Operation in designated containers and that said containers are emptied daily, or as more frequently required by Department, at a location within the Area designated by Department. Disposal costs from this latter location shall be borne by Department. Concessionaire shall provide such additional trash containers as may be required to keep the immediate Concession Premises clean at all times. The type of trash containers provided by Concessionaire shall be approved by Department prior to use.
Wastewater i.e. wastewater and storm water collection, treatment and management systems.
Transport 6.1.1 BellSouth shall provide nondiscriminatory access, in accordance with FCC Rules 51.311, 51.319, and Section 251(c)(3) of the Act to interoffice transmission facilities described in this Section 6 on an unbundled basis to EZ Phone for the provision of a qualifying service, as set forth herein.
Chemicals All chemicals are provided by Xxxxxxxx Pools & Spas at additional costs per the agreement. These include, but are not limited to, sanitizer, balancing chemicals, algaecide, & cleaners. 4.
TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.
Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.
DISPOSAL OF WASTE MATERIAL Purchaser may sidecast waste material on side slopes up to 45% if the waste material is compacted and free of organic debris. On side slopes greater than 45%, all waste material must be end hauled or pushed to the designated embankment sites and waste areas identified in Clause 0-00 XXXXX XXXX XXXXXXXX.
Garbage Disposal You are responsible for ensuring Your and Your guests’ rubbish is removed from the Room, Building and Common Property in a timely manner and properly deposited in the communal rubbish areas allocated by Us for collection. You must use all garbage chutes according to pasted instructions near chutes.
Volunteer Firefighting Leave Leave without pay will be granted when an employee who is a volunteer firefighter is called to duty to respond to a fire, natural disaster or medical emergency.
Trash Tenant shall not allow anything to be placed on the outside of the Building, nor shall anything be thrown by Tenant out of the windows or doors, or down the corridors or ventilating ducts or shafts, of the Building. All trash and refuse shall be placed in receptacles provided by Landlord for the Building or by Tenant for the Premises.