Real and Reactive Power Control and Primary Frequency Response Sample Clauses

Real and Reactive Power Control and Primary Frequency Response. 9.5.1 Power Factor Design Criteria.
AutoNDA by SimpleDocs
Real and Reactive Power Control and Primary Frequency Response 

Related to Real and Reactive Power Control and Primary Frequency Response

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Real and Reactive Power Control 36 9.6 Outages and Interruptions. 37 9.7 Switching and Tagging Rules. 41 9.8 Use of Attachment Facilities by Third Parties. 41 9.9 Disturbance Analysis Data Exchange. 42 ARTICLE 10. MAINTENANCE 42 10.1 Connecting Transmission Owner Obligations. 42 10.2 Developer Obligations. 42 10.3 Coordination. 42 10.4 Secondary Systems. 42 10.5 Operating and Maintenance Expenses. 43 ARTICLE 11. PERFORMANCE OBLIGATION 43

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Substance Abuse Treatment Information Substance abuse treatment information shall be maintained in compliance with 42 C.F.R. Part 2 if the Party or subcontractor(s) are Part 2 covered programs, or if substance abuse treatment information is received from a Part 2 covered program by the Party or subcontractor(s).

  • Workplace Violence Prevention and Crisis Response (applicable to any Party and any subcontractors and sub-grantees whose employees or other service providers deliver social or mental health services directly to individual recipients of such services): Party shall establish a written workplace violence prevention and crisis response policy meeting the requirements of Act 109 (2016), 33 VSA §8201(b), for the benefit of employees delivering direct social or mental health services. Party shall, in preparing its policy, consult with the guidelines promulgated by the U.S. Occupational Safety and Health Administration for Preventing Workplace Violence for Healthcare and Social Services Workers, as those guidelines may from time to time be amended. Party, through its violence protection and crisis response committee, shall evaluate the efficacy of its policy, and update the policy as appropriate, at least annually. The policy and any written evaluations thereof shall be provided to employees delivering direct social or mental health services. Party will ensure that any subcontractor and sub-grantee who hires employees (or contracts with service providers) who deliver social or mental health services directly to individual recipients of such services, complies with all requirements of this Section.

  • CLEAN AIR AND WATER POLLUTION CONTROL ACT Customer Purchase Orders using federal funds must contain a provision that requires the Contractor to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251-1387). Violations must be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA). Pursuant to the Federal Rule above, Contractor certifies that it is in compliance with all applicable provisions of the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251-1387) and will remain in compliance during the term of the Contract.

Time is Money Join Law Insider Premium to draft better contracts faster.