Reading of Meters. (a) The Metering System shall continuously read the Net Energy Output of the Plant. Measurements of the Net Energy Output (active & reactive), MW, frequency, voltage etc. shall be electronically recorded on half hourly basis and shall be used for preparing monthly invoice (unless otherwise mutually agreed upon) . In the event the Metering System is not in service due to repair, testing or maintenance by Company, then the electronic record of the Net Energy Output from the Back-Up Metering System shall be used and the Company shall deliver a copy of the Back-Up Metering System record to BPDB with the relevant Monthly invoice(s).
AutoNDA by SimpleDocs
Reading of Meters. (a) As per the CEA (Installation and Operation of Meters) Amendment Regulations 2010, reading of all meters interfacing with the State or Central transmission system, shall be the responsibility of the appropriate State or Central Transmission Utility, which shall also record the metered data, maintain database of all the information associated with the interface meters and verify the correctness of metered data and furnish the same to various agencies as per the procedure laid down by the Appropriate Commission in India. .
Reading of Meters. The meters and metering equipment and instruments owned by the Utility shall be read monthly by a representative of the Utility and a representative of the Authority. The Utility and the Authority shall agree upon a date or dates upon which the meters shall be read for billing purposes, and this date shall normally be the regular meter reading date of the Utility for the area in which said project is located.
Reading of Meters. 2.1 Procedures for billing purposes
Reading of Meters. The Contractor will read the meters using the existing systems as detailed on the following grid:- Development System Type Connected Dwellings No of Meters Read Sycamores Heat 74 1 Larches Heat 74 1 Hawthorns Heat 74 1 Cruddas Park House Heat 159 1 Total 381 4 Readings will be taken remotely for all installations by Radio. Meter readings will be imported into the Contractor’s billing system where they will be stored and archived for issue to the Authority on request.
Reading of Meters 

Related to Reading of Meters

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • Metering Requirements Seller shall comply with all applicable rules in installing a meter appropriate for deliveries pursuant to the Full Buy/Sell or Excess Sale arrangement selected in paragraph 2.2, above, which can be electronically read daily by:

  • Trunk Forecasting Requirements 14.2.1 Initial trunk forecast requirements. At least ninety (90) days before initiating interconnection in a LATA, Alltel shall provide Verizon a two (2)-year traffic forecast that complies with the Verizon Interconnection Trunking Forecast Guide, as revised from time to time. This initial traffic forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Interconnection Trunk groups in the LATA over the next eight (8) quarters.

  • RECORDING OF AGREEMENT Tenant shall not record this Agreement on the Public Records of any public office. In the event that Tenant shall record this Agreement, this Agreement shall, at Landlord's option, terminate immediately and Landlord shall be entitled to all rights and remedies that it has at law or in equity.

  • Notice and warning of disconnection Before disconnecting your premises, we must comply with relevant warning notice requirements and other provisions in the Rules. However, we are not required to provide a warning notice prior to disconnection in certain circumstances (for example, where there has been illegal or fraudulent use of energy at your premises or where there is an emergency or health and safety issue).

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Meters 7.1.1 For installation of Meters, Meter testing, Meter calibration and Meter reading and all matters incidental thereto, the SPD and SECI shall follow and be bound by the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, the Grid Code, as amended and revised from time to time.

  • Recording of Overtime Employees shall record starting and finishing times for overtime worked in a form determined by the Employer.

  • PRICING OF Regular Hours Coefficient What is your regular hours coefficient for the RS Means Price Book? Remember that this is a ceiling price proposed. You can discount lower than your proposed contract coefficient, but not higher. This is one of three pricing questions that are required for consideration for award on this solicitation. Please consider your answer carefully. An explanation of the TIPS scoring of pricing is included in the attachments for your information. The below is an Example of how pricing model works (not intended to influence your proposed coefficient, you should propose a coefficient that you determine is right for your business): To propose the exact pricing as the RS Means Unit Price Book, you would insert a 1.0 and to propose a 5% discount for the RS Means Price Book would be a .95 regular hours coefficient and so on.

Time is Money Join Law Insider Premium to draft better contracts faster.