Reactive Power Requirements. Generation resources must be capable of producing a defined quantity of reactive power to maintain a Voltage Profile established by ERCOT Nodal Protocol 3.15. The generator voltage-var schedule, voltage regulator, and transformer ratio settings will be jointly determined by TSP and Generator to ensure proper coordination of voltages and regulator action. The Plant must generate reactive requirements for the Plant and GIF. TSP may, in order to maintain security of the ERCOT power system, request Generator to adjust voltage schedule to accept or supply reactive power.
AutoNDA by SimpleDocs
Reactive Power Requirements. Attachment 6 C ompany’s Description of Special Facilities and Upgrades Required to Integrate the Generation Facility and Best Estimate of Costs As provided in Schedule 72 this Attachment describes Upgrades, Special Facilities, including Network Upgrades, and provides an itemized best estimate of the cost of the required facilities. Upgrades
Reactive Power Requirements. Public Utility will determine the reactive power required to be supplied by the Public Utility to the Interconnection Customer, based upon information provided by the Interconnection Customer. The Public Utility will specify the equipment required on the Public Utility’s system to meet the Facility’s reactive power requirements. These specifications will include but not be limited to equipment specifications, equipment location, Public Utility-provided equipment, Interconnection Customer provided equipment, and all costs associated with the equipment, design and installation of the Public Utility-provided equipment. The equipment specifications and requirements will become an integral part of this Agreement. The Public Utility-owned equipment will be maintained by the Public Utility, with total cost of purchase, installation, operation, and maintenance, including administrative cost to be reimbursed to the Public Utility by the Interconnection Customer. Payment of these costs will be in accordance with Schedule 72 and the total reactive power cost will be included in the calculation of the Monthly Operation and Maintenance Charges specified in Schedule 72. Interconnection Requirements for a Wind Generating Plant A. Technical Standards Applicable to a Wind Generating Plant
Reactive Power Requirements. Idaho Power will determine the reactive power required to be supplied by the Company to the Customer Generator, based upon information provided by the Customer Generator. The Company will specify the equipment required on the Company’s system to meet the Facility’s reactive power requirements. These specifications will include but not be limited to equipment specifications, equipment location, Company-provided equipment, Customer Generator provided equipment, and all costs associated with the equipment, design and installation of the Company-provided equipment. The equipment specifications and requirements will become an integral part of this Agreement. The Company-owned equipment will be maintained by the Company, with total cost of purchase, installation, operation, and maintenance, including administrative cost to be reimbursed to the Company by the Customer Generator. Payment of these costs will be in accordance with Schedule 68 and the total reactive power cost will be included in the calculation of the monthly facilities charge. Attachment 6 Company’s Description of Upgrades Required to Integrate the Generation Facility and Best Estimate of Upgrade Costs

Related to Reactive Power Requirements

  • TX RF Power Required 6.4.8.1.4 TX Hum and Noise Required

  • Customer Requirements ▪ Seller shall comply with the applicable terms and conditions of any agreements between Buyer and Xxxxx’s Customer (the “Customer Purchase Orders”) pursuant to which Buyer agreed to sell to Buyer’s Customer products or assemblies which incorporate the goods provided by Seller hereunder. This provision specifically includes costs and obligations imposed by warranty programs instituted by the original equipment manufacturer that ultimately purchases Buyer’s products that incorporate the goods sold by Seller if applicable to Buyer under the terms of the Customer Purchase Order. ▪ If Buyer is not acting as a Tier One supplier, the defined term “Customer Purchase Order” shall also include the terms and conditions of the original equipment manufacturer that ultimately purchases Buyer’s product that incorporates the goods or services sold by Seller. ▪ Seller will be responsible to ascertain how the disclosed terms affect Seller’s performance under the Purchase Order. ▪ By written notice to Seller, Buyer may elect to disclose and have the provisions of the Customer’s Purchase Orders prevail over any term of the Purchase Order at any time.

  • Technology Requirements The Customer is required to obtain and maintain, at the Customer’s own expense, compatible Electronic Channels, hardware, operating systems, and software approved for such use by Royal Bank, and which are up-to-date and unaltered from manufacturer specifications. Royal Bank is not responsible for, and makes no representations or warranties of any nature, with respect to any such Electronic Channels, hardware, operating systems, and software provided by any other Person. Royal Bank has the right, in its sole discretion, without notice, to make changes to this Service from time to time which may result in the Customer’s Electronic Channels, hardware, operating systems, and software no longer being compatible with this Service, and in such event, Royal Bank will have no responsibility or liability to the Customer or any other Person.

  • Computer Requirements You are responsible for obtaining, installing, maintaining and operating all software, hardware, or other equipment necessary (collectively, “Access Device Systems”) necessary for you to access and use the Service. This responsibility includes, without limitation, your utilizing up to date web-browsers and Access Devices and the best commercially available encryption, antivirus, anti-spyware, and Internet security software. You are additionally responsible for obtaining Internet service via an Internet service provider of your choice, for any and all fees imposed by such Internet service provider, and any associated communications service provider charges. You acknowledge that there are certain security, corruption, transmission error and access availability risks associated with using open networks such as the Internet and you hereby expressly assume such risk, including, but not limited to those we may disclose in our educational materials. You acknowledge that you are responsible for data security of the Systems used to access the Service, and for the transmission and receipt of information using such System. You acknowledge that you have requested the Service for your convenience, have made your own independent assessment of the adequacy of the Internet and Systems and that you are satisfied with that assessment. The Bank shall have no responsibility for failures, interruption or other defects in the Services, which arise from the malfunction or failure of the Internet or your Systems nor are we responsible for notifying you of any upgrades, fixes, or enhancements to, or for providing technical or other support for your Systems. The Bank may add to, modify, or replace software programs used in conjunction with providing the Services under this Agreement at its sole discretion and without notice, provided Services rendered to you are not substantially negatively affected or obligations altered.

  • Match Requirements There is no match required on the part of the Grantee under this Agreement.

  • Power Factor Requirement Consistent with Section 4.7 of Appendix 2 to this ISA, the power factor requirement is as follows: The Generation Interconnection Customer shall design its non-synchronous Customer Facility with the ability to maintain a power factor of at least 0.95 leading to 0.95 lagging measured at the high-side of the facility substation transformers.

  • PJM Requirements The DS Supplier acknowledges and agrees that, as a member of PJM, the Company is bound by all PJM operating instructions, policies and procedures as are currently set forth in the PJM Operating Manual, which are available through the Internet on the PJM Home Page (xxxx://xxx.xxx.xxx), as may be revised from time to time, which are needed to maintain the integrity of the PJM system. The DS Supplier acknowledges and agrees that it will cooperate with the Company so that the Company will be in compliance with all PJM Emergency Operations Procedures, which include, but are not limited to, those procedures pertaining to minimum and maximum generation Emergencies, and measures requiring involuntary Customer participation, such as supply voltage reduction or full interruption of Customer load by either manual or automatic means.

  • Limits and Requirements A. Workers’ Compensation/Employer’s Liability Insurance The minimum limits of insurance are: Part One: Statutory Part Two: Each Accident $1,000,000 Disease – Policy Limit $1,000,000 Disease – Each Employee $1,000,000

  • Network Requirements (A) The Contractor shall maintain and monitor a network of appropriate Network Providers that is supported by written agreements and is sufficient to provide adequate access to all Covered Services for all Enrollees, including those with limited English proficiency or physical or mental disabilities. In establishing and maintaining the network of Network Providers the Contractor shall consider:

  • Specific Order Processes and Requirements 1. Distributor will order Software from SAP using and filling out completely such forms and minimum order requirements as SAP may prescribe from time to time and must comply with any then-current order process for the specific Software product. Where applicable, Distributor agrees to use the electronic means provided by SAP for placing orders.

Time is Money Join Law Insider Premium to draft better contracts faster.