RAILWAY CROSSINGS Sample Clauses

RAILWAY CROSSINGS. Where the Work encroaches upon any right-of-way of any railway, the OWNER shall secure the necessary easement for the work. Where railway tracks are to be crossed, the CONTRACTOR shall observe all the regulations and instructions of the railway company as to methods of doing the work or precautions for safety of property and the public. All negotiations with the railway company, except for right-of-way, shall be made by the CONTRACTOR. The railway company shall be notified by the CONTRACTOR not less than five days prior to commencing the work. The CONTRACTOR shall not be paid separate compensation for such railway crossing but shall receive only the compensation as set out in the proposal.
AutoNDA by SimpleDocs
RAILWAY CROSSINGS. Where the water pipeline crosses railway right-of-way the crossing shall be completed by boring or jacking under the grade and installing encasement pipe as detailed on the drawings. The installation procedure shall meet all the requirements of the appropriate railway organization for boring and installation of water lines under railways. The Contractor shall notify the appropriate Railways officials 48 hours in advance of the work taking place and the installation procedure shall meet all the requirements as outlined by the Railways official in charge.
RAILWAY CROSSINGS. The angles for all railway crossing shall be as close to 90 degrees as possible, but in no case lees than 85 degrees to the center-line of the railway.
RAILWAY CROSSINGS. 1. The Concessionaire shall be responsible for the maintenance of all existing rail, road and utility crossings which were the responsibility of «Armenian railway» closed joint-stock company before the Commencement date of the Concession activities.
RAILWAY CROSSINGS. The railway crossing overhead or underground shall be carried out in the manner as approved & prescribed by the railway authorities from time to time. The crossing shall normally be at right angle to the railway track. In case crossing is required to be done through underground cable, cost of the cable including laying and other accessories shall be in the scope of the contractor. During detailed engineering, the contractor shall submit his proposed arrangement for each railway crossing to the owner. The approval for crossing railway track shall be obtained by the owner from the Railway Authority. Power Line Crossings- Where the line is to cross over another line of the same voltage or lower voltage, provisions to prevent the possibility of their coming into contact with each shall be made in accordance with the Indian Electricity Rules.
RAILWAY CROSSINGS. 5.1. Railway Level Crossings The Railway level crossings in the Site are given in Table A-5. Table A-5 List of Railway Level Crossings S. No. Existing Chainage(km) L.C Number, Railway km Width of Railway Land 1 23.160 LC-35B/2E 45m

Related to RAILWAY CROSSINGS

  • Crossing Picket Lines The Company will not expect an employee to cross a picket line, including a picket line at a customer site, if to do so would place the employee's life, limb or personal property in jeopardy.

  • Crossing of Picket Lines 15 Employees in the bargaining unit, while acting in the course of their employment, 16 shall not refuse to cross any picket line established by any labor organization when called 17 upon to cross such picket line in the line of duty. It is understood, however, that no 18 employee shall be disciplined or discharged for refusal to cross a picket line:

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Renewable Energy Credits 5.01. Customer shall offer PMPA and/or Utility a first right of refusal before selling or granting to any third party the right to the Green Attributes associated with its customer-owned renewable generation that is interconnected to Utility’s electric distribution system. The term Green Attributes shall include any and all credits, certificates, benefits, environmental attributes, emissions reductions, offsets, and allowances, however entitled, attributable to the generation of electricity from the customer owned-renewable generation and its displacement of conventional energy generation.

  • Community Mental Health Center Services Assertive Community Treatment Staffing Full Time Equivalents Community Mental Health Center March 2021 December 2020 Nurse Masters Level Clinician/or Functional Support Worker Peer Specialist Total (Excluding Psychiatry) Psychiatrist/Nurse Practitioner Total (Excluding Psychiatry) Psychiatrist/Nurse Practitioner 01 Northern Human Services - Wolfeboro 1.00 0.00 0.00 0.57 6.81 0.27 8.27 0.25 01 Northern Human Services - Berlin 0.34 0.31 0.00 0.00 3.94 0.14 4.17 0.14 01 Northern Human Services - Littleton 0.00 0.14 0.00 0.00 3.28 0.29 3.31 0.29 02 West Central Behavioral Health 0.60 1.00 0.00 0.00 5.40 0.30 5.90 0.30 03 Lakes Region Mental Health Center 1.00 1.00 0.00 1.00 5.00 0.40 7.00 0.38 04 Riverbend Community Mental Health Center 0.50 1.00 6.90 1.00 10.40 0.50 10.50 0.50 05 Monadnock Family Services 1.91 2.53 0.00 1.12 11.17 0.66 10.32 0.62 06 Greater Nashua Mental Health 1 1.00 1.00 3.00 1.00 7.65 0.15 8.50 0.15 06 Greater Nashua Mental Health 2 1.00 1.00 4.00 1.00 8.65 0.15 8.50 0.15 07 Mental Health Center of Greater Manchester-CTT 1.33 10.64 2.00 0.00 19.95 1.17 21.61 1.21 07 Mental Health Center of Greater Manchester-MCST 1.33 9.31 3.33 1.33 19.95 1.17 25.27 1.21 08 Seacoast Mental Health Center 1.00 1.10 5.00 1.00 10.10 0.60 10.10 0.60 09 Community Partners 0.50 0.00 3.40 0.88 7.28 0.70 7.41 0.70 10 Center for Life Management 1.00 0.00 2.28 1.00 6.71 0.46 6.57 0.46 Total 12.51 29.03 29.91 9.33 126.29 6.96 137.43 6.96 2b. Community Mental Health Center Services: Assertive Community Treatment Staffing Competencies Community Mental Health Center Substance Use Disorder Treatment Housing Assistance Supported Employment March 2021 December 2020 March 2021 December 2020 March 2021 December 2020 01 Northern Human Services - Wolfeboro 1.27 1.27 5.81 6.30 0.00 0.40 01 Northern Human Services - Berlin 0.74 0.74 3.29 3.29 0.00 0.23 01 Northern Human Services - Littleton 1.43 1.29 2.14 2.14 1.00 1.00 02 West Central Behavioral Health 0.20 0.20 4.00 0.40 0.60 0.60 03 Lakes Region Mental Health Center 1.00 3.00 5.00 7.00 2.00 2.00 04 Riverbend Community Mental Health Center 0.50 0.50 9.40 9.50 0.50 0.50 05 Monadnock Family Services 1.69 1.62 4.56 4.48 0.95 1.18 06 Greater Nashua Mental Health 1 6.15 7.15 5.50 6.50 1.50 1.50 06 Greater Nashua Mental Health 2 5.15 5.15 6.50 6.50 0.50 0.50 07 Mental Health Center of Greater Manchester-CCT 14.47 15.84 13.96 15.62 2.66 2.66 07 Mental Health Center of Greater Manchester-MCST 6.49 7.86 15.29 19.28 1.33 2.66 08 Seacoast Mental Health Center 2.00 2.00 5.00 5.00 1.00 1.00 09 Community Partners 1.20 1.20 4.50 4.50 1.00 1.00 10 Center for Life Management 2.14 2.14 5.42 5.28 0.29 0.29 Total 44.43 49.96 90.37 99.39 13.33 15.52 Revisions to Prior Period: None. Data Source: Bureau of Mental Health CMHC ACT Staffing Census Based on CMHC self-report. Notes: Data compiled 04/26/2021. For 2b: the Staff Competency values reflect the sum of FTEs trained to provide each service type. These numbers are not a reflection of the services delivered, but rather the quantity of staff available to provide each service. If staff are trained to provide multiple service types, their entire FTE value is credited to each service type.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes.

  • BELLSOUTH OUTAGE Because BellSouth's equipment has varying degrees of impact on the service provided to the CLECs, restoring service from damaged BellSouth equipment is different. The outage will probably impact a number of Carriers simultaneously. However, the ECC will be able to initiate immediate actions to correct the problem. A disaster involving any of BellSouth's equipment locations could impact the CLECs, some more than others. A disaster at a Central Office (CO) would only impact the delivery of traffic to and from that one location, but the incident could affect many Carriers. If the Central Office is a Serving Wire Center (SWC), then traffic from the entire area to those Carriers served from that switch would also be impacted. If the switch functions as an Access Tandem, or there is a tandem in the building, traffic from every CO to every CLEC could be interrupted. A disaster that destroys a facility hub could disrupt various traffic flows, even though the switching equipment may be unaffected. The NMC would be the first group to observe a problem involving BellSouth's equipment. Shortly after a disaster, the NMC will begin applying controls and finding re-routes for the completion of as much traffic as possible. These reroutes may involve delivering traffic to alternate Carriers upon receiving approval from the CLECs involved. In some cases, changes in translations will be required. If the outage is caused by the destruction of equipment, then the ECC will assume control of the restoration.

Time is Money Join Law Insider Premium to draft better contracts faster.