Radio Base Station. Radio Base Station as depicted on attached Exhibit F, or as may be relocated from time to time at the discretion and expense of Lessor.
AutoNDA by SimpleDocs

Related to Radio Base Station

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:

  • Off-Site Storage With prior approval by the Owner and in the event Contractor elects to store materials at an off-site location, abide by the following conditions, unless otherwise agreed to in writing by the Owner.

  • ON-SITE STORAGE With the written approval of the Authorized User, materials, equipment or supplies may be stored at the Authorized User’s site at the Contractor’s sole risk.

  • Television Equipment Recycling If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Transmission System Operation The NTO shall be responsible for ensuring that all actions related to the operation, maintenance and modification of its facilities that are designated as NTO Transmission Facilities Under ISO Operational Control and NTO Transmission Facilities Requiring ISO Notification are performed in accordance with the terms of this Agreement, all Reliability Rules and all other applicable reliability rules, standards and criteria, all operating instructions, ISO Tariffs, and ISO Procedures.

  • Handover ‌ Unless otherwise agreed, a handover in order to ensure that the Delivery is in accordance with the Agreement shall be conducted immediately after assembly. Both Parties must be represented when the handover is carried out. Any shortcomings/deficiencies will be registered in the shortage list in a handover form and the shortcomings/deficiencies must be rectified without undue delay by the Supplier. The Supplier is aware that there will be limited time for rectifications, as the place of delivery, cf. clause 5, may have limited space and rehearsals may start immediately after assembly. The Supplier must adjust to the circumstances. The Supplier shall be liable for any deficiencies in accordance with clause 22.3 and 22.4, irrespective of whether or not the deficiencies have been stated in the shortage list.

  • Collocation Interconnection may be accomplished through the Collocation arrangements offered by CenturyLink. The terms and conditions under which Collocation will be available are described in Article IX of this Agreement.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.