Proposed Improved Scheme Sample Clauses

Proposed Improved Scheme. This section will describe our proposed anonymity-preserving AKA scheme in detail. The proposed AKA scheme conceals the user’s real identity in the encryption algorithm along with the hash of random identity and secret key as the symmetric key. The messages, which are transmitted in public channel, are the results of the hash or the encryption, thus avoiding the risk by intercepting the communication channel to acquire the plaintext directly. In order to conquer the known session-specific temporary information attack, each communicate entity only knows the xor results of the others’ generated random numbers in computing the session kex. Xxx xxxxxxxx AKA scheme inherixx Xxxx-Xxxxxx’s scheme aiming at cope with the loopholes of the aforementioned security drawbacks of their scheme. Based on the previous analysis, the functionality of the proposed scheme has been greatly improved with a slight higher computation cost due to the symmetric cryptographic algorithm. Our proposed AKA scheme has five phases: User registration; Sensor node registration; Login; Authentication and key agreement (Figure 3); Password change. We will introduce them as follows.

Related to Proposed Improved Scheme

  • Needs Improvement the Educator’s performance on a standard or overall is below the requirements of a standard or overall, but is not considered to be unsatisfactory at this time. Improvement is necessary and expected.

  • EPP session-­‐command RTT Refers to the RTT of the sequence of packets that includes the sending of a session command plus the reception of the EPP response for only one EPP session command. For the login command it will include packets needed for starting the TCP session. For the logout command it will include packets needed for closing the TCP session. EPP session commands are those described in section 2.9.1 of EPP RFC 5730. If the RTT is 5 times or more the corresponding SLR, the RTT will be considered undefined.

  • Project Specific Milestones In addition to the milestones stated in Section 212.5 of the Tariff, as applicable, during the term of this ISA, Interconnection Customer shall ensure that it meets each of the following development milestones: 6.1 Substantial Site work completed. On or before December 31, 2020 Interconnection Customer must demonstrate completion of at least 20% of project site construction. At this time, Interconnection Customer must submit to Interconnected Transmission Owner and Transmission Provider initial drawings, certified by a professional engineer, of the Customer Interconnection Facilities. 6.2 Delivery of major electrical equipment. On or before December 31, 2021, Interconnection Customer must demonstrate that all generating units have been delivered to Interconnection Customer’s project site.

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • School Improvement The parties do hereby mutually agree that the school improvement process currently in effect will continue. Any plan developed by the committees shall not be in conflict with the master agreement or board policy.