Project Submittals Sample Clauses

Project Submittals. QUANTITY ESTIMATES, SPECS & MEETINGS GCE will attend two (2) meetings with the Client/County. GCE will also coordinate TCP, SPM & SWPP design work with the roadway design throughout the project. GCE shall prepare and submit construction plans as indicated in the above tasks for 30%, 70%, 95% and 100% design phases. GCE shall provide sheet-by-sheet Quantity take-off and Engineer’s Construction Cost Estimate for the above tasks in spreadsheet and pdf format for each submittal. GCE shall prepare Construction Plans in 11”x17” size. The anticipated number of Construction plan sheets for Tasks 1, 2 & 3 are as follows: TCP Overall Phasing Layout (2 Phases) (1”=300’) 1 Traffic Control Construction Notes 1 Traffic Control Plans (1”=100’) (Two bays per sheet) 8 Traffic Control Details 5 SPM & SWPP General Notes 1 SPM Layouts (1”=100’) (Two bays per sheet) 4 SPM Standard Details 5 SWPP Plans (1”=100’) (Two bays per sheet) 4 SWPP Standard Details 1 Total 30 Sheets GCE shall submit plans in pdf format for all submittals. GCE shall address comments and provide responses to the County comments for all submittals. PROJECT SCHEDULE A project schedule including the milestones will be determined based on the discussions with the Client. GCE shall submit 30% construction plans within eight (8) weeks after the receipt of Notice to Proceed, Topographic Survey and proposed roadway plans from the Client. GCE shall submit plans for 70%, 95% and 100% levels within three (3) weeks from the receipt of comments at each stage.
AutoNDA by SimpleDocs
Project Submittals a. The Contractor shall submit the following to the Engineer for before the use of shotcrete:
Project Submittals. X. Xxxxxxxxx submittals to the City will be at Conceptual Design (30%), Preliminary Design (60%), and Final Design (90% and 100%) stages of completion and will include submittal of an opinion of probable construction cost. Draft copy of SECTION NO. 6, Proposal document will accompany the 90% and 100% submittals.
Project Submittals. The Architect shall assemble all materials required for each submittal and present in the form of drawings, reports and exhibit boards as appropriate and as specified in the List of Design Requirements & Deliverables for the Assigned Project. A binder of narrative responses shall accompany each submittal. The narrative response shall address each required on the List. Project submittals are required at the following design milestone points: • Schematic presentation to CMPCT (at building floor plan & elevation layout) • 100% Schematic Design (update of initial submittal) • 50% Design Development (progress submittal) • 100% Design Development • 50% Construction Documents (progress set) • 90% Construction Documents (plan check) • 100% Final Construction Documents (reflective of bid set)
Project Submittals. GHA will provide PDF files of Pre-Final and Final Plans, Specifications and Estimate documents to Client for printing and transmittal to IDOT.
Project Submittals. Key project deliverables and submittals outlined here are described in further detail throughout this RFP.
Project Submittals. The following submittals are required for project completion:
AutoNDA by SimpleDocs

Related to Project Submittals

  • Contractor’s Submittals The Contract shall submit with reasonable promptness consistent with the Work Project Schedule and in orderly sequence all Shop Drawings, Samples, or other information required by the Contract Documents, or subsequently required by Change Order. Prior to submitting, the Contractor shall review each submittal for compliance with the Contract Documents and certify its approval by an approval stamp affixed to each copy. Submittal data presented without the Contractor’s certification will be returned without review or comment, and any delay resulting from such certification is the Contractor's responsibility.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate Gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • Review of Submittals A/E and ODR review is only for conformance with the design concept and the information provided in the Contract Documents. Responses to submittals will be in writing. The approval of a separate item does not indicate approval of an assembly in which the item functions. The approval of a submittal does not relieve the Contractor of responsibility for any deviation from the requirements of the Contract unless the Contractor informs the A/E and ODR of such deviation in a clear, conspicuous, and written manner on the submittal transmittal and at the time of submission, and obtains the A/E’s and Owner’s written specific approval of the particular deviation.

  • Submittals Submittals required by the Contract Documents shall be prepared specifically for the Work by the Contractor to illustrate some portion of the Work. Submittals are not Contract Documents.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Project Timeline The Project Timeline establishes a start and end date for each Phase of the Project. Developed during the Initiate & Plan Stage and revised as mutually agreed to, if needed, the timeline accounts for resource availability, business goals, size and complexity of the Project, and task duration requirements.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.