Project Screening Sample Clauses

Project Screening. After the project short-list, has been developed, the TEs and Program Specialists will perform a risk-based assessment of all projects using 10 risk areas of Complexity, Cost, Schedule, Urgency, Environmental & Stakeholders, Funding, Project Administration, Regional Significance, Corporate Actions, and Local Considerations and may be scored in the Missouri Screening Tool (MST). The TEs and Program Specialists will evaluate all 10 risk areas as Low, Medium, or Elevated, based upon the resulting analysis of each specific risk area. Given both the rural and highly urbanized makeup of Missouri’s program, some project risk criteria may be dependent upon the specific district being reviewed. The risk tool will guide the evaluation process: Urbanized Areas: Project criteria to be considered as part of the evaluation process in urbanized areas may include items such as project complexity and cost, new or modified access to interstates or major NHS routes, political interest, environmental/NEPA impacts, State/regional significance, and safety and maintenance of traffic considerations. Rural Areas: Project criteria in rural areas may include items such as complexity and cost in relation to other projects within the respective district, new or significant modification to interstate access, environmental/NEPA impacts, regional significance in relation to other district projects, complex maintenance of traffic, and the need to maintain FHWA presence in a geographic area. Projects identified in the STIP as Design-Build are not required to be PoDIs; but, the TE may want to review certain risk aspects of the Design-Build Process project. Projects funded under the BUILD or INFRA programs are automatically designated as PoDIs, as are any designated Major Projects.
AutoNDA by SimpleDocs
Project Screening. After the project short-list has been developed, the TEs and Program Specialists will perform a risk-based assessment of all projects using 10 risk areas of Complexity, Cost, Schedule, Urgency, Environmental & Stakeholders, Funding, Project Administration, Regional Significance, Corporate Actions, and Local Considerations and may be scored in the Missouri Screening Tool (MST). The TEs and Program Specialists will evaluate all 10 risk areas as Low, Medium, or Elevated, based upon the resulting analysis of each specific risk area.
Project Screening. Each project on the PoDI short-list will be evaluated using the FHWA developed Missouri Resource Deployment Tool (MRDT). The MRDT contains 10 required risk areas that will be assessed for each project on the PoDI short-list. Based upon the results of the MRDT risk assessment, each project on the short-list will be scored and be identified as a PoDI, potential PODI or not as PoDI project.
Project Screening. The Participant is responsible for selecting which projects will move forward to implementation; however, only projects that pass cost-effectiveness screening will be eligible for reimbursement under the ESA Pilot. Each project identified in the EMP will be screened by Efficiency Vermont and Vermont Gas Systems (for Vermont Gas Systems customers only) to determine societal cost-effectiveness, energy savings, and non-energy benefits such as economic development. Some aspects of screening methodology are currently under development by the Department and are subject to approval by the PUC.

Related to Project Screening

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • Screening 3.13.1 Refuse containers located outside the building shall be fully screened from adjacent properties and from streets by means of opaque fencing or masonry walls with suitable landscaping.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Curriculum Work Service on a District curriculum committee shall be required for grade level or department chairpersons. All other teachers working on such committee(s) shall be designated (in writing) by the Curriculum Director and shall be paid, at the hourly rate contained in Schedule B, for all documented hours of committee service (up to such limits as may be imposed by the District) occurring when school is not in session (e.g. during the summer), during duty-free lunch periods or preparation periods, and before/after the teacher’s regularly scheduled work day. Curriculum committee work shall occur at such times as are determined or approved by the Curriculum Director.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Background Screening VENDOR shall comply with all requirements of Sections 1012.32 and 1012.465, Florida Statutes, and all of its personnel who (1) are to be permitted access to school grounds when students are present, (2) will have direct contact with students, or (3) have access or control of school funds, will successfully complete the background screening required by the referenced statutes and meet the standards established by the statutes. This background screening will be conducted by SBBC in advance of VENDOR or its personnel providing any services under the conditions described in the previous sentence. VENDOR shall bear the cost of acquiring the background screening required by Section 1012.32, Florida Statutes, and any fee imposed by the Florida Department of Law Enforcement to maintain the fingerprints provided with respect to VENDOR and its personnel. The parties agree that the failure of VENDOR to perform any of the duties described in this section shall constitute a material breach of this Agreement entitling SBBC to terminate immediately with no further responsibilities or duties to perform under this Agreement. VENDOR agrees to indemnify and hold harmless SBBC, its officers and employees from any liability in the form of physical or mental injury, death or property damage resulting from VENDOR’s failure to comply with the requirements of this section or with Sections 1012.32 and 1012.465, Florida Statutes.

  • Project Plan Development of Project Plan Upon the Authorized User’s request, the Contractor must develop a Project Plan. This Project Plan may include Implementation personnel, installation timeframes, escalation procedures and an acceptance plan as appropriate for the Services requested. Specific requirements of the plan will be defined in the RFQ. In response to the RFQ, the Contractor must agree to furnish all labor and supervision necessary to successfully perform Services procured from this Lot. Project Plan Document The Contractor will provide to the Authorized User, a Project Plan that may contain the following items: • Name of the Project Manager, Contact Phone Numbers and E-Mail Address; • Names of the Project Team Members, Contact Phone Numbers and E-Mail Address; • A list of Implementation milestones based on the Authorized User’s desired installation date; • A list of responsibilities of the Authorized User during system Implementation; • A list of designated Contractor Authorized Personnel; • Escalation procedures including management personnel contact numbers; • Full and complete documentation of all Implementation work; • Samples of knowledge transfer documentation; and • When applicable, a list of all materials and supplies required to complete the Implementation described in the RFQ. Materials and Supplies Required to Complete Implementation In the event that there are items required to complete an Implementation, the Contractor may request the items be added to its Contract if the items meet the scope of the Contract. Negotiation of Final Project Plan If the Authorized User chooses to require a full Project Plan, the State further reserves the right for Authorized Users to negotiate the final Project Plan with the apparent RFQ awardee. Such negotiation must not substantively change the scope of the RFQ plan, but can alter timeframes or other incidental factors of the final Project Plan. The Authorized User will provide the Contractor a minimum of five (5) business days’ notice of the final negotiation date. The Authorized User reserves the right to move to the next responsible and responsive bidder if Contractor negotiations are unsuccessful.

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection xxxxx; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

  • Development Area 10.4. The Development Area shall encompass all Deposits to be produced.

Time is Money Join Law Insider Premium to draft better contracts faster.