Common use of Project Reports Clause in Contracts

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 6 contracts

Samples: Project Agreement, Project Agreement, Project Agreement

AutoNDA by SimpleDocs

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the AssociationAssociation in the Financing Agreement. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient not later than 30 forty five days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 5 contracts

Samples: Project Agreement, Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with the AssociationBank. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient Borrower not later than 30 days one month after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 4 contracts

Samples: Project Agreement, Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days one month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 4 contracts

Samples: Financing Agreement, Financing Agreement, Financing Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with the AssociationBank. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient Borrower not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 4 contracts

Samples: Project Agreement, Project Agreement, Project Agreement

Project Reports. 1. 1 (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Associationset forth below in subparagraph (b) of this paragraph. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 thirty days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 3 contracts

Samples: Project Agreement, Project Agreement, Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Associationset forth below in sub-paragraph (b) of this paragraph. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient Association not later than 30 days one month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 3 contracts

Samples: Project Agreement, Project Agreement, Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Associationset forth below in subparagraph (b) of this paragraph. Each such Project Report report shall cover the period of one a calendar semesterquarter, and shall be furnished to the Recipient not later than 30 days two (2) weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 3 contracts

Samples: Project Agreement, Project Agreement, Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 4.08(b) of the General Conditions and on the basis of the indicators agreed with the Associationset forth below in subparagraph (b) of this paragraph. Each such Project Report shall cover the period of one calendar semestersix months, commencing from the Effective Date, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 3 contracts

Samples: Project Agreement, Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part Parts of the Project and prepare Project Reports for its Respective Part Parts of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semester(1) Financial Year quarter, and shall be furnished to the Recipient not later than 30 days two (2) weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 3 contracts

Samples: Project Agreement, Project Agreement, Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Associationindicator set forth below in sub-paragraph (b) of this paragraph. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient Association not later than 30 days one month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the AssociationBank. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient Borrower not later than 30 days two (2) weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and Section 2.06 of the Standard Conditions and on the basis of the indicators agreed with set forth in the AssociationAnnex to this Schedule. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient Borrower not later than 30 days after the end February 28 and August 31 of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reporteach year, commencing on August 31, 2007.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with set forth in a supplemental letter dated the Associationdate of this Agreement. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient Bank not later than 30 days one and a half months after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient Association not later than 30 days one month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with set forth in the AssociationAnnex to this Schedule. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished by to the Recipient not later than 30 days after the end of the period covered Bank by such report for incorporation February 15 and forwarding by the Recipient to the Association of the overall Project ReportAugust 15 each year, starting August 15, 2010.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project implementation and prepare Project Reports for its Respective Part Parts of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with acceptable to the Association. Each such Project Report shall cover the a bi-annual period of one calendar semester(six (6) months), and shall be furnished to the Recipient not later than 30 thirty (30) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with the Associationset forth in Annex B to this Schedule. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient Bank not later than 30 days after the end of the period covered by such report for incorporation February 15 and forwarding by the Recipient to the Association of the overall Project ReportAugust 15 each year.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with satisfactory to the AssociationAssociation set forth in the PIM. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part Parts of the Project and prepare Project Reports for its Respective Part Parts of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with set forth in the AssociationOperations Manual. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient and the Association not later than 30 forty five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semesteryear, and shall be furnished to the Recipient not later than 30 days one month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part Parts of the Project and prepare Project Reports for its Respective Part Parts of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project Reports, in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar (1) semester, and shall be furnished to the Recipient Association not later than 30 days one (1) month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 (b) of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient not later than 30 forty five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Tj Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the AssociationBank. Each such Project Report shall cover the period of one calendar semestersix months period, and shall be furnished to the Recipient Borrower not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed set forth in Appendix 2 to the Financing Agreement. The Project Report shall include a review of the extent and quality of compliance with the Associationimplementation procedures, including the Anti-Corruption Plan. Each such Project Report shall cover the period of one calendar semester, quarter and shall be furnished to the Recipient Association not later than 30 forty five days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in subparagraph (b) of this paragraph agreed with the Association. .. Each such Project Report shall cover the period of one calendar semesterthree months, and shall be furnished to the Recipient not later than 30 forty-five days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with set forth in Section II.A.1(b) of Schedule 2 to the AssociationFinancing Agreement. Each such Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Recipient not later than 30 days two week after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project Reports, commencing from December 31, 2006, in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of indicators agreed with the AssociationBank. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient Borrower not later than 30 days one (1) month after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 (b) of the General Conditions and on the basis of the indicators agreed with set forth in Section II.A.1 (b) of Schedule 2 to the AssociationFinancing Agreement. Each such Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Recipient not later than 30 45 days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the AssociationBank. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient Borrower not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the AssociationBank. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient Borrower not later than 30 forty five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 (b) of the General Conditions and on the basis of the indicators agreed with the Associationset forth below in subparagraph (b) of this paragraph. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient not later than 30 45 days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of indicators agreed with the AssociationBank. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient Borrower not later than 30 days two (2) weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Additional Activities under the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient and the Association not later than 30 forty-five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with set forth in the AssociationAnnex to this Schedule. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient Bank not later than 30 forty-five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part Parts of the Project and prepare Project Reports for its Respective Part Parts of the Project in accordance with the provisions of Section 4.08 4.08(b) of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient not later than 30 days one month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of indicators agreed with the AssociationBank. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient Bank not later than 30 forty five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with acceptable to the AssociationBank. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient Borrower not later than 30 days one (1) month after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in subparagraph (b) of this paragraph agreed with the Association. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and the Program as a whole and prepare Project Reports for its Respective Part of the Project and the Program in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Associationset forth in subparagraph (b) of this paragraph. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 thirty days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part A and part of Part E of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 (b) of the General Conditions and on the basis of the indicators agreed with the Associationset forth below in subparagraph (b) of this paragraph. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, The Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in subparagraph (b) of this paragraph agreed with the Association. Each such Project Report shall cover the period of one calendar semesterFiscal Year, and shall be furnished to the Recipient not later than 30 forty-five days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of implementing its Respective Part of the Project and prepare Project Reports for its Respective Part Parts of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in paragraph (b) agreed with the Association. Each such Project Report shall cover the period of one calendar semesterFiscal Year, and shall be furnished to the Recipient not later than 30 days two months after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 2.06(b) of the General Standard Conditions and on the basis of the indicators agreed with the Associationset forth in Annex B to this Schedule. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient not later than Bank by March 31 and September 30 days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reporteach year, starting March 31, 2011.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 4.08(b) of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient not later than 30 days one month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient not later than 30 days three weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Each Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 2.06 of the General Standard Conditions and on the basis of the indicators agreed with the Associationset forth in Annex to this Schedule. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient World Bank not later than 30 forty-five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Associationset forth below in subparagraph (b) of this paragraph. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 thirty (30) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 2 contracts

Samples: Project Agreement, Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 (b) of the Association’s General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semestersemester (six month period), and shall be furnished to the Recipient not later than 30 days eight weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association through the Project Implementing Entity of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days one month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days one (1) month after the end of the period covered by such report for incorporation and forwarding by the Recipient or RISA to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part Parts of the Project and prepare Project Reports for its Respective Part Parts of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient Association not later than 30 forty-five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the AssociationMonitoring and Evaluation Indicators. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient Association not later than 30 forty-five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with the Associationset forth in Annex B to this Schedule. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient not later than 30 days after the end of the period covered Bank by such report for incorporation February 28 and forwarding by the Recipient to the Association of the overall Project ReportAugust 31 each year, starting February 28, 2008.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days two (2) weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

AutoNDA by SimpleDocs

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators the indicator agreed with the Associationset forth below in subparagraph (b) of this paragraph. Each such Project Report shall cover the period of one calendar semesteryear, and shall be furnished to the Recipient not later than 30 days four months after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the Association, as set forth in the Implementation Manual. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient not later than 30 days two (2) weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with the Associationset forth in Annex B to this Schedule. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient not later than 30 days after the end of the period covered Bank by such report for incorporation February 28 and forwarding by the Recipient to the Association of the overall Project ReportAugust 31 each year, starting August 31, 2008.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part Parts D and E of the Project and prepare Project Reports for its Respective Part Parts D and E of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Standard Conditions and on the basis of indicators agreed with Monitoring and Evaluation Indicators for Parts D and E of the AssociationProject. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient not later than 30 days two (2) weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association World Bank of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of indicators agreed with acceptable to the AssociationWorld Bank. Each such Project Report shall cover the period of one calendar semesteryear, and shall be furnished to the Recipient World Bank not later than 30 days two (2) months after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with set forth below in Section II.A.1(b) of the AssociationFinancing Agreement. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient not later than 30 forty five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of indicators agreed with the AssociationBank. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient Bank not later than 30 days two (2) weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of indicators agreed with the AssociationBank and set forth in the Project Operational Manual. Each such Project Report shall cover the period of one calendar semesterFY Semester, and shall be furnished to the Recipient Borrower not later than 30 thirty days after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part A of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one three calendar semestermonths, and shall be furnished to the Recipient not later than 30 days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.forty five

Appears in 1 contract

Samples: Project Agreement

Project Reports. (1. ) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part Parts 1 and 3(a) of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 (b) of the General Conditions and on the basis of the indicators agreed with the Associationset forth below in subparagraph (2) of this paragraph. Each such Project Report shall cover the period of one calendar semestersix months, and shall be furnished to the Recipient not later than 30 days one month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project ReportAssociation.

Appears in 1 contract

Samples: Eepco Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in subparagraph (b) of this paragraph agreed with the Association. Each such Project Report shall cover the period of one calendar semesterthree months, and shall be furnished to the Recipient not later than 30 forty-five days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with the AssociationBank. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient Borrower not later than 30 days one month after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semester, semester and shall be furnished to the Recipient not later than 30 forty-five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of indicators agreed with the AssociationBank. Each such Project Report shall cover the period of one calendar semestereach Fiscal Year quarter, and shall be furnished to the Recipient Borrower not later than 30 forty-five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with set forth below in Section II.A.1 (b) of the AssociationFinancing Agreement. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient not later than 30 forty five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days after one (1) month the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with mentioned in Section II.A.1.(b) of Schedule 2 to the AssociationFinancing Agreement. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient and the Association not later than 30 days two (2) months after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of indicators agreed with the AssociationBank. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient Borrower not later than 30 forty five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower to the Association Bank of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 forty-five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days one month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in subparagraph (b) of this paragraph agreed with the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports [for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semester, semester and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Associationset forth below in subparagraph (b) of this paragraph. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not no later than 30 45 days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 2.06 of the General Standard Conditions and on the basis of indicators agreed with set forth in Section II.A.1(b) of Schedule 2 to the AssociationGrant Agreement. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient not later than 30 thirty (30) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association World Bank of the overall Project Report.

Appears in 1 contract

Samples: Gef Tf Grant Number Tf094484 Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators Project Performance Indicators agreed with the Association. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient Recipient, or as agreed with the Recipient, to the Association on behalf of the Recipient, not later than 30 sixty (60) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days one (1) month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with set forth in the AssociationAnnex to this Schedule. Each such Project Report shall cover the period of one (1) calendar semesterquarter, and shall be furnished to the Recipient not later than 30 forty-five (45) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Associationset forth below in subparagraph (b) of this paragraph. Each such Project Report shall cover the period of one calendar semesterFiscal Year, and shall be furnished to the Recipient Association not later than 30 days three months after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Reportreport.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with the Associationset forth in Annex B to this Schedule. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient not later than 30 days after the end of the period covered Bank by such report for incorporation February 28 and forwarding by the Recipient to the Association of the overall Project ReportAugust 31 each year, starting February 28, 2009.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in subparagraph (b) of this paragraph agreed with the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient Recipients to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar semester, and shall to be furnished submitted to the Recipient not later than 30 days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association twice a year, on or about April 15 and October 15 of each year, covering the overall Project Reportimmediately preceding semester of activities (i.e. October through March, and April through September, respectively).

Appears in 1 contract

Samples: Financing Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 4.08(b) of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Recipient not later than 30 days two (2) weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08(b) of the General Conditions and on the basis of the indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semester, semester and shall be furnished to the Recipient not later than 30 forty (40) days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. (a) The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 (b) of the General Conditions and on the basis of the indicators agreed with the Associationset forth below in subparagraph (b) of this paragraph. Each such Project Report shall cover the period of one calendar semesterquarter, and shall be furnished to the Recipient not later than 30 45 days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 4.08(b) of the Association’s General Conditions and Section 5.08(b) of the Bank’s General Conditions, and on the basis of indicators agreed with the AssociationAssociation and the Bank. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.six

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of indicators agreed with acceptable to the AssociationBank. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient Borrower not later than 30 days two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient Borrower through the Project Implementing Entity to the Association Bank of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Project Reports. 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Part of the Project and prepare Project Reports for its Respective Part of the Project in accordance with the provisions of Section 4.08 5.08 (b) of the General Conditions and on the basis of the indicators agreed with acceptable to the Association. Each such Project Report shall cover the period of one calendar semester, and shall be furnished to the Recipient not later than 30 days one (1) month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report.

Appears in 1 contract

Samples: Project Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.