Common use of Project Limits Clause in Contracts

Project Limits. ‌ This project is divided into three main sections. The Kentucky Approach (Section 4) extends along KY 841 from Sta. 0+99.72 to Sta. 187+51.86 (back). Section 5 is the Ohio River Bridge Main Spans, which begins at KY 841 Sta. 187+40.00 (ahead) and ends at Sta. 212+74.51 (“Kentucky Approach”). The Indiana Approach (Section 6) extends along SR 265 from Sta. 212+74.51 to Sta. 428+63.00 (“Indiana Approach”). These limits and stationing are general in nature and are only intended to provide the design intent as indicated in the Reference Information Documents (RID). See Section 9 for more detailed limits of the work. References within the Technical Provisions to Sections 4, 5, and 6 that are not underlined refer to the East End Crossing Sections (“Section”) described above and are not to be construed as PPA Document cross-references. Developer scope of work for the East End Crossing does not include the proposed Salem Road design and construction; including the proposed bridge over SR 265 depicted in the RID RD- 6.11 through RD-6.24 (see INDOT Construction Contract IR-34937). Section 1.2.2 describes coordination requirements related to this work.

Appears in 2 contracts

Samples: www.in.gov, www.state.in.us

AutoNDA by SimpleDocs

Project Limits. ‌ This project is divided into three main sections. The Kentucky Approach (Section 4) extends along KY 841 from Sta. 0+99.72 to Sta. 187+51.86 (back). Section 5 is the Ohio River Bridge Main Spans, which begins at KY 841 Sta. 187+40.00 (ahead) and ends at Sta. 212+74.51 (“Kentucky Approach”―Kentucky Approach‖). The Indiana Approach (Section 6) extends along SR 265 from Sta. 212+74.51 to Sta. 428+63.00 (“Indiana Approach”―Indiana Approach‖). These limits and stationing are general in nature and are only intended to provide the design intent as indicated in the Reference Information Documents (RID). See Section 9 for more detailed limits of the work. References within the Technical Provisions to Sections 4, 5, and 6 that are not underlined refer to the East End Crossing Sections (“Section”―Section‖) described above and are not to be construed as PPA Document cross-references. Developer scope of work for the East End Crossing does not include the proposed Salem Road design and construction; including the proposed bridge over SR 265 depicted in the RID RD- 6.11 through RD-6.24 (see INDOT Construction Contract IR-34937). Section 1.2.2 describes coordination requirements related to this work.

Appears in 1 contract

Samples: secure.in.gov

AutoNDA by SimpleDocs

Project Limits. ‌ This project is divided into three main sections. The Kentucky Approach (Section 4) extends along KY 841 from Sta. 0+99.72 to Sta. 187+51.86 (back). Section 5 is the Ohio River Bridge Main Spans, which begins at KY 841 Sta. 187+40.00 (ahead) and ends at Sta. 212+74.51 (“Kentucky Approach”). The Indiana Approach (Section 6) extends along SR 265 from Sta. 212+74.51 to Sta. 428+63.00 (“Indiana Approach”). These limits and stationing are general in nature and are only intended to provide the design intent as indicated in the Reference Information Documents (RID). See Section 9 for more detailed limits of the work. References within the Technical Provisions to Sections 4, 5, and 6 that are not underlined refer to the East End Crossing Sections (“Section”) described above and are not to be construed as PPA Document cross-references. Developer scope of work for the East End Crossing does not include the proposed Salem Road design and construction; including the proposed bridge over SR 265 depicted in the RID RD- 6.11 through RD-6.24 (see INDOT Construction Contract IR-34937). Section 1.2.2 describes coordination requirements related to this work.

Appears in 1 contract

Samples: www.in.gov

Time is Money Join Law Insider Premium to draft better contracts faster.