Project Design, Development, and Construction Goals Sample Clauses

Project Design, Development, and Construction Goals. Developer will use its Best Efforts to meet the following goals based upon the total cost of Construction of, and Professional Services for, the Project and all related facilities undertaken by Developer, but not including Specialized Services. In no event shall Developer be required to incur higher costs as a result of its commitment to attempt to meet such goals. In the event Developer obtains bids for any aspect of the Project for which a bid by a Proposer qualifying as an LBE, MBE, or WBE is not the lowest or best bid, Developer shall not be required to meet the LBE/MBE/WBE participation percentage goals for that aspect of the Project. These goals are based upon a disparity study performed for the Kansas City Metropolitan Area for LBE, MBE, and WBE participation. These goals are not to act as quotas or set asides. Construction Professional Services LBE 18% 18% MBE 15% 13% WBE 7% 8% It is the intent of the UG to give preference to the utilization of LBEs so long as all other factors relating to the award of an individual contract are equal. If the factors relating to an award of an individual contract are equal, Developer shall give preference to the utilization of LBEs over the utilization of MBEs and WBEs. Developer shall strive to meet each individual goal listed.
AutoNDA by SimpleDocs
Project Design, Development, and Construction Goals. Developer will use its best efforts, as defined in Section III.C.3.b, to meet the following goals based upon the total cost of the Improvements and all related facilities for the Project. In no event shall Developer be required to incur higher costs as a result of its commitment to attempt to meet such goals. These goals are based upon a disparity study performed for the Kansas City Metropolitan Area for LBE, MBE and WBE participation. These goals are not to act as quotas or set asides. Construction Professional LBE 18% 18% MBE 15% 13% WBE 7% 8% It is the intent of the UG to give preference to the utilization of LBEs so long as all other factors relating to the award of an individual contract are equal. If the factors relating to an award of an individual contract are equal, Developer shall give preference to the utilization of LBEs over the utilization of MBEs and WBEs. Developer shall strive to meet each individual goal listed.

Related to Project Design, Development, and Construction Goals

  • Construction Development of the Project The Allottee has seen the proposed layout plan/demarcation-cum-zoning/sanctioned plans, / site plan / building plan, specifications, amenities and facilities, etc. depicted in the advertisement / brochure / agreement / website (as the case may be) regarding the Project where the Said Independent Floor for residential usage along with parking is located and has accepted the floor / site plan, Payment Plan and the specifications, amenities, facilities, etc. [annexed along with this Agreement] which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the bye-laws such as Haryana Building Code, 2017, FAR, density norms, provisions prescribed, approved plans, terms and condition of the license/ allotment as well as registration of RERA, etc. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the provisions and norms prescribed by the relevant State laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act and Rules made thereunder or as per approvals/instructions/ guidelines of the competent authorities, and any breach of this term by the Promoter shall constitute a material breach of the Agreement.

  • Project Construction Budget The project construction cost allowance specifically stated in writing as the ‘revised’ or ‘current’ ‘Project Construction Budget’ by the Trustees at each applicable phase of plan development.

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • General Project Description 2. Substation location.

  • Project Development a. Collaborate with COUNTY and project clients to identify requirements and develop a project Scope Statement.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK Firms and/or individuals that assisted in the development or drafting of the specifications, requirements, statements of work, or solicitation documents contained herein are excluded from competing for this solicitation. This shall not be applicable to firms and/or individuals providing responses to a publicly posted Request for Information (RFI) associated with a solicitation.

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

Time is Money Join Law Insider Premium to draft better contracts faster.