Project Design and Performance Verification Studies Sample Clauses

Project Design and Performance Verification Studies. In accordance with Article 24.4, Developer shall perform project design and performance verification studies and shall provide design and performance verification study reports to the Connecting Transmission Owner and to the NYISO. Connecting Transmission Owner shall be free to witness any simulator demonstrations that are relevant to system performance. The minimum design and performance verification studies are summarized as follows:
AutoNDA by SimpleDocs
Project Design and Performance Verification Studies. In accordance with Article 24.4, Developer shall perform project design and performance verification studies and shall provide design and performance verification study reports to the Connecting Transmission Owner and to the NYISO. Connecting Transmission Owner shall be free to witness any simulator demonstrations that are relevant to system performance. The minimum design and performance verification studies are summarized as follows: Project main circuit design study; Dynamic performance study including AC system tolerance and disturbance recovery performance verification, as further detailed in Appendix G, section 5.6.8; Steady-state reactive power flow exchange verification; AC system harmonic performance verification study; Power line carrier (“PLC”) performance verification study; Temporary overvoltage and insulation coordination studies; 345kV circuit breaker coordination study; AC and DC protection system study; Sub-synchronous torsional interaction screening and control; Implementation studies; Additional electromagnetic transients program studies, as necessary to validate system performance based on final design. APPENDIX D SECURITY ARRANGEMENTS Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. APPENDIX E COMMERCIAL OPERATION DATE [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx Xxx Xxxx, XX 00000 Attn: Senior Vice President, System and Transmission Operations Phone: (000) 000-0000 Fax: (000) 000-0000 Re: Xxxxxx Transmission Partners, LLC Merchant Transmission Facility Dear __________________: On [Date] [Developer] has completed Trial Operation. This letter confirms that [Developer] commenced Commercial Operation of the Merchant...

Related to Project Design and Performance Verification Studies

  • COMPLIANCE AND PERFORMANCE EVALUATION Two (2) Mandatory Compliance and Performance Evaluation Meetings shall be conducted during each Term of this Agreement. Additional meetings may be scheduled at the discretion of Department to ensure Concessionaire’s effectiveness and compliance. The meetings shall review all aspects of the Concession Operation, ensuring that quality public services are being provided on a continuing basis in accordance with the Bid Specifications and this Agreement, that operational problems/concerns are addressed on a timely basis, and that all terms and conditions are clearly understood. The meetings shall be held on site with Department-designated State Park Service staff representative(s), the on-site concession manager, and a management/supervisory representative of Concessionaire’s firm. A report form shall be utilized to document the meeting, and to identify any deficiencies and the corrective action required. A copy of the completed report form shall be provided to the on- site concession manager or the management/supervisory representative of Concessionaire’s firm and shall be attached to and made a part of this Agreement. The Mandatory Compliance and Performance Evaluation Meetings shall be held as follows: • Meeting #1 - Prior to commencement of the Period of Operation or Memorial Day, whichever comes first. • Meeting #2 - Within ten (10) calendar days after the last approved day of the Period of Operation.

  • OUTCOME IF GRANTEE CANNOT COMPLETE REQUIRED PERFORMANCE Unless otherwise specified in this Statement of Work, if Grantee cannot complete or otherwise comply with a requirement included in this Statement of Work, HHSC, at its sole discretion, may impose remedies or sanctions outlined under Contract Attachment C, Local Mental Health Authority Special Conditions, Section 7.09 (Remedies and Sanctions).

  • CONTRACTOR PERFORMANCE Agencies shall report any vendor failure to perform according to the requirements of this contract on Complaint to Vendor, form PUR 7017. Should the vendor fail to correct the problem within a prescribed period of time, then form PUR 7029, Request for Assistance, is to be filed with this office.

  • Registry Performance Specifications Registry Performance Specifications for operation of the TLD will be as set forth in Specification 10 attached hereto (“Specification 10”). Registry Operator shall comply with such Performance Specifications and, for a period of at least one (1) year, shall keep technical and operational records sufficient to evidence compliance with such specifications for each calendar year during the Term.

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • CONTRACTOR PERFORMANCE AUDIT The Contractor shall allow the Authorized User to assess Contractor’s performance by providing any materials requested in the Authorized User Agreement (e.g., page load times, response times, uptime, and fail over time). The Authorized User may perform this Contractor performance audit with a third party at its discretion, at the Authorized User’s expense. The Contractor shall perform an independent audit of its Data Centers, at least annually, at Contractor expense. The Contractor will provide a data owner facing audit report upon request by the Authorized User. The Contractor shall identify any confidential, trade secret, or proprietary information in accordance with Appendix B, Section 9(a), Confidential/Trade Secret Materials.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Acceptance/Performance Test 4.7.1 Prior to synchronization of the Power Project, the SPD shall be required to get the Project certified for the requisite acceptance/performance test as may be laid down by Central Electricity Authority or an agency identified by the central government to carry out testing and certification for the solar power projects.

  • Equipment and Software Requirements In order to view and retain electronic communications that we make available to you, you must have: • A PC or other device with an Internet browser that has “cookies” enabled and supports 128 bit encryption • An Internet connection • An email address • A PDF viewer (such as Adobe Reader) • A printer or computer with sufficient electronic storage space All communications shall be delivered to the last address we have on file for you. These notices will be sent through electronic delivery (email) and will be considered delivered the same day as sent. If you have opted out of electronic delivery, communications sent to you through the United States Postal Service are considered delivered 5 business days after the postmark date. It is your responsibility to notify the Custodian of any email address change or residential address change. We will not be held liable for any losses or damages if you have not provided Custodian with the most current address information. The electronically signed copy of this document should be considered equivalent to a printed hard copy form. It is considered a true and complete record of the document, admissible in arbitration and/or administrative hearings or proceedings. Your electronic signature on the Application and other electronic forms such as the Investment Direction are considered valid and the same as if the paper form or Application were signed.