PROJECT CONDITIONS Sample Clauses

PROJECT CONDITIONS. A. The Grantee agrees to the following Project Conditions:
AutoNDA by SimpleDocs
PROJECT CONDITIONS a. The Design-Builder must obtain easements where required.
PROJECT CONDITIONS. Section 1. Workers shall be at their place of work at the designated starting time and shall remain during working hours until their designated quitting time. As practicable given City contract requirements for the project, parking will be available to workers within a three (3) block radius of the project, at a location designated by the Prime Contractor. If the City determines dedicated parking is not possible, then the Prime Contractor will provide transportation to and from a designated parking location that the Prime Contractor provides, and the project worksite; in such situations, workers shall leave their place of work 15 minutes before end of shift for travel. Transportation to such a designated parking location shall be available to the workers throughout each scheduled work day. In lieu of compensated time for travel to designated parking, the Prime Contractor may elect to pay each worker for their parking costs, at an amount negotiated between the Seattle Building and Construction Trades Council and the Prime Contractor.
PROJECT CONDITIONS. 3.01 The SPONSOR Agrees to:
PROJECT CONDITIONS. A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.
PROJECT CONDITIONS. A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.
AutoNDA by SimpleDocs
PROJECT CONDITIONS. PRE-JOB, CONDITIONS, SAFETY, HEALTH & SANITATION
PROJECT CONDITIONS. A. Lines and grades shall be as indicated. Design-Builder will furnish benchmarks, base lines, and reference points as necessary to permit Design-Builder to lay out and construct the Work properly.
PROJECT CONDITIONS. A. The Lessor shall provide a clean, level, dry subfloor, temperature controlled, and protected from the weather.
Time is Money Join Law Insider Premium to draft better contracts faster.