PROJECT CO RESPONSIBILITIES AND CONSTRUCTION OBLIGATIONS Sample Clauses

PROJECT CO RESPONSIBILITIES AND CONSTRUCTION OBLIGATIONS. 11.1 General Responsibilities, Standards and Contract Time‌
AutoNDA by SimpleDocs
PROJECT CO RESPONSIBILITIES AND CONSTRUCTION OBLIGATIONS. 36 11.1 General Responsibilities, Standards and Contract Time 36 11.2 General Construction Obligations 37 11.3 Liability Unaffected 39 11.4 Project Co Delay 40 11.5 Permits, Licences and Approvals 40 11.6 Safety 40 11.7 Minimize Disturbance and Work in Existing Facility 42 11.8 Subcontractors and Suppliers 43 11.9 Labour and Products 45 11.10 Documents at the Site 47 11.11 Shop Drawings 47 11.12 Use of the Work 49 11.13 Cutting and Remedial Work 49 11.14 Cleanup 50 11.15 Project Co Attending Meetings 50 11.16 Defective Work 51 11.17 Project Co Design Contingency 51 11.18 Procedure for Addressing Design Issues 53 11.19 Construction by CMH or Other Contractors 56 11.20 Temporary Supports, Structures and Facilities 58 11.21 Protection of Work and Property 59
PROJECT CO RESPONSIBILITIES AND CONSTRUCTION OBLIGATIONS 

Related to PROJECT CO RESPONSIBILITIES AND CONSTRUCTION OBLIGATIONS

  • General Construction Obligations (a) Without limiting Section 10.3:

  • BUILDER’S RISK FOR NEW CONSTRUCTION PROJECTS If the project is NEW CONSTRUCTION, then the following provisions apply:

  • Responsibilities of Contractor A. The Contractor shall perform all work on the described project as required by the Contract documents. The work to be performed includes the labor and services necessary to produce such replacement, and all materials, supplies, tools, transportation, equipment, and machinery required for replacement.

  • RESPONSIBILITY FOR CONSTRUCTION COST 5.2.1 Evaluations of the Owner's Project budget, preliminary estimates of Construction Cost and detailed estimates of Construction Cost prepared by the Design Professional represent the Design Professional's best judgment as a design professional familiar with the construction industry. It is recognized, however, that neither the Design Professional nor the Owner has control over the cost of labor, materials or equipment, over the Contractor's methods of determining bid prices, or over competitive bidding or market conditions. Accordingly, the Design Professional cannot and does not warrant or represent that bids or cost proposals will not vary from the Owner's Project budget or from any estimate of Construction Cost or evaluation prepared or agreed to by the Design Professional.

  • ADDITIONAL CONTRACTOR RESPONSIBILITIES 13 In addition to providing the services described in Paragraph 5 of this 14 Exhibit A, CONTRACTOR agrees to:

  • OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS § 7.4.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project.

  • Cooperation obligations The Parties undertake to cooperate to allow the timely submission, examination, publication and defence of any dissertation or thesis for a degree which includes their Results or Background subject to the confidentiality and publication provisions agreed in this Consortium Agreement.

  • Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians.

  • Application of General Conditions These General Conditions set forth the terms and conditions generally applicable to the Development Grant Agreement to the extent and subject to any modifications set forth in such agreement.”

  • Definitions and Construction 1 1.1 Definitions.....................................................................................1 1.2