Processing Plant Sample Clauses

Processing Plant. Any Gas processing facility downstream of any portion of the Gathering System to which Shipper has dedicated Gas for processing or at which Shipper has arranged for Gas to be processed prior to delivery to a Downstream Pipeline.
AutoNDA by SimpleDocs
Processing Plant. The Gas processing facilities to be installed and constructed by Processor at the Plant Site, including, to the extent installed, cryogenic, refrigeration and chilling equipment, absorption vessels, product separation and fractionation vessels, product storage vessels, associated condensing, heating, compressing, pumping, conveying, dehydration and other equipment, instrumentation, and recompression and refrigeration compression facilities, and all related structures; the Residue Gas pipelines to the Plant Delivery Points and the associated interconnections; and all easements, rights-of-way, and other property rights on which any of the foregoing facilities are located; in each case wherever located.
Processing Plant. Processor hereby agrees as follows with respect to the Processing Plant.
Processing Plant. The term “Processing Plant” means the Chipeta Plant as well as any other plant or third party arrangement that Processor enters into to process all of Processing Customer’s Gas committed for processing pursuant to this Agreement. Such term includes the Natural Buttes Plant.
Processing Plant. In the aggregate, the Existing Plants, any expansions, extensions, improvements or additions thereto, the Bluestone 3 Plant, the Bluestone 4 Plant and any other Gas processing facility installed and constructed by MarkWest or its Affiliates where Producer’s Gas is delivered for processing, including in each case, to the extent installed: cryogenic, refrigeration and chilling equipment, absorption vessels, and product separation vessels, product storage vessels, associated condensing, heating, compressing, pumping, conveying, dehydration and other equipment and instrumentation; any inlet compression required to boost Gas to processing pressure; any recompression required by Processing Plant operations; any refrigeration compression required by Processing Plant operations; all structures associated with those facilities; and including all easements, rights-of-way, and other property rights pertaining to the construction and operation of those facilities, wherever those facilities, structures, easements, rights-of-way, and other property rights are located.
Processing Plant. MHR’s detailed processing model as well as the data assumptions used to create it.
Processing Plant. In the aggregate, those skid-mounted cryogenic gas processing plants commonly referred to as the “Sarsen Plant” and the “Bluestone Plant”, any expansions, extensions, improvements or additions thereto, including the Expansion Plant (if applicable) and any other Gas processing facility installed and constructed by Keystone or its Affiliates where Producer’s Gas is delivered for processing, including in each case, to the extent installed: cryogenic, refrigeration and chilling equipment, absorption vessels, product separation and fractionation vessels, product storage vessels, associated condensing, heating, compressing, pumping, conveying, dehydration and other equipment and instrumentation; any inlet compression required to boost Gas to processing pressure; any recompression required by Processing Plant operations; any refrigeration compression required by Processing Plant operations; all structures associated with those facilities; and including all easements, rights-of-way, and other property rights pertaining to the construction and operation of those facilities, wherever those facilities, structures, easements, rights-of-way, and other property rights are located. Producer’s Gas. All Gas that is attributable to Interests now owned or hereafter acquired by Producer or any of its Affiliates within any portion of the Dedication Area, or is attributable to third parties that is produced from a well that is operated by Producer or any of its Affiliates within the Dedication Area and from which well Producer or any of its Affiliates has the right to control, market or deliver the Gas for processing.
AutoNDA by SimpleDocs
Processing Plant. ANG’s planned processing plant structure is nearly complete and machinery is on-site, though not in place. The facility could be physically complete and certified to operate by early 2013. Unfortunately, ANG currently lacks financial resources needed to operate the plant without sacrifice of vital functions elsewhere. Even more unfortunately, prospects for profitable plant operations in the near future appear dim. (Annex 3.2.2)
Processing Plant. 4.6.1 In order to maximize long-term benefits for the Province and the people of the Province, the Proponent shall use its best efforts through the R & D Program to develop a technically and economically feasible hydrometallurgical process technology for processing the Nickel Concentrate in the Province. If such technology is successfully developed, the Proponent shall cause the design, engineering and construction of and operate and maintain a hydrometallurgical processing plant with a design capacity to produce annually approximately 50,000 tonnes of Finished Nickel Product, together with associated cobalt and copper products (the “Hydromet Plant”). The Proponent estimates that the Hydromet Plant will have a capital cost of approximately $800 million and during the three-year construction period will generate approximately 3,000 person-years of employment. The Proponent estimates that the Hydromet Plant will employ approximately 400 people during operations.

Related to Processing Plant

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Remittance Processing Services In order to provide a means of collection of the Receivables which will allow the Trustee to receive the proceeds of the Receivables and related security without AmeriCredit or its Affiliates having access to the funds, the parties hereto agree for the benefit of the Trustee that the processing services (the “Service(s)”) of Processor will be used for the collection and the deposit of remittances related to the Receivables and related security.

  • Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Data Processing In this clause:

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

Time is Money Join Law Insider Premium to draft better contracts faster.