Process Water Sample Clauses

Process Water. (a) If the Government has constructed or is operating a drainage control facility or water treatment facility at the Project, the Company may, at its sole option, by Notice to the host Government, acquire any or all of such facilities for a price equal to the actual construction cost of the purchased facilities (including Project management costs).
AutoNDA by SimpleDocs
Process Water. Runoff from the process plant will be contained in a 25-year storage reservoir and returned to the metallurgical process. Cooling water, which is seawater essentially unaltered from its ambient condition except for an increase in temperature, will be pumped into a circulation system from the Sea of Xxxxxx and then discharged back to the sea. Brines from desalination may be discharged as part of cooling water discharge, or otherwise used in the process or on the project site.
Process Water. Section 15.1 - Process Water - During the term of this agreement, BEARD shall furnish process water to Pinnacle Preparation Plant. A xxxxxine with required valves and controls, approved by PMC, shall be installed by BEARD to furnish and maintain the water level in the Pinnacle Prepaxxxxxn Plant head-tank in excess of 75% full. Water furnished to the head tank shall contain no higher than 3.0 mg/l of iron, contain 35 mg/l or less of suspended solids and have Ph between 7.0 and 7.9.
Process Water. Section 15.1 - Process Water - During the term of this agreement, BP shall furnish process water to Pinnacle Preparation Plant. A pipeline with required valves and controls, approved by PMC, shall be installed by BP to furnish and maintain the water level in the Pinnacle Preparation Plant head-tank in excess of 75% full. Water furnished to the head tank shall contain no higher than 3.0 mg/1 of iron, contain 35 mg/1 or less of suspended solids and have Ph between 7.0 and 7.9. Pond Recovery Operations shall not preclude BP’s obligation to furnish PMC sufficient quantity or quality of process water for the successful operation of Pinnacle Preparation Plant. In the event of insufficient quantity or unacceptable quality of process water for Pinnacle Preparation Plant, BP shall suspend Pond Recovery Operations and make necessary process, equipment or any other modifications required.
Process Water. The backup shall be supplied with process water from a 2" hose reel (the hose shall be reinforced so that its sectional area shall not be reduced even if it is rolled up empty). A booster pump with a two-compartment tank (10 and 5 m/3/) fitted with level regulation on the inlet shall ensure the [STAMP] Bouygues TP Sheung Shui to Xxxx Tau Tunnels July 0000 XXXX PLp TECHNICAL SPECIFICATIONS FOR TBM & BACKUP total flowrate (approximately 50 m/3//h) and pressure (1 MPa) of the distribution network. The 5 m/3/ compartment on the upstream side shall serve as a heat exchanger. The 10 m/3/ compartment shall be fed by overflow from the upline compartment. The 10m/3/ compartment (downstream) shall be equipped with level contactors: . a high-level contactor for closing the inlet valve . a low-level contactor for opening the supply valve . an alarm-level contactor for display in the TBM cab . a stop-level contactor for the booster pump. The network shall supply:
Process Water. Seller shall provide up to 150 gallons per minute of process water to Buyer, at no cost to Buyer.
Process Water. Industrial reuse water, projected demands, current allocations, acquisition requirements, pipeline sizes, pipeline alignments, etc.; shall be coordinated and in conformance with the Emerald Coast Utilities Authority. Preliminary Alignment for any systems shall be depicted on the Preliminary Alignment drawings.
AutoNDA by SimpleDocs

Related to Process Water

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Testing-the-Waters Materials If at any time following the distribution of any Written Testing-the-Waters Communication there occurred or occurs an event or development as a result of which such Written Testing-the-Waters Communication included or would include an untrue statement of a material fact or omitted or would omit to state a material fact necessary in order to make the statements therein, in the light of the circumstances existing at that subsequent time, not misleading, the Company will promptly notify the Representatives and will promptly amend or supplement, at its own expense, such Written Testing-the-Waters Communication to eliminate or correct such untrue statement or omission.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

Time is Money Join Law Insider Premium to draft better contracts faster.