Process Piping. Piping systems for purposes other than comfort heating, comfort cooling, and comfort refrigeration systems:
AutoNDA by SimpleDocs
Process Piping. B46.1 Surface Texture, Surface Roughness, Waviness and Lay ASME PTC 19 Series Performance Test Codes American Society for Testing and Materials (ASTM) G93-88 Standard Practice for Cleaning Methods for Material and Equipment Used in Oxygen Enriched Environments Deutsches Institut Fur Normung e.V. (DIN) DIN 43760 Standard for Resistance Temperature Detectors (RTD’s) Fluid Control Institute (FCI) FCI 70-2 Control Valve Seat Leakage Energy Institute (EI) EI Model Code P15 Model code of safe practice in the petroleum industry Part 15: Area Classification code for installations handling flammable fluids. International Electrotechnical Commission (IEC) IEC 60079-1 Construction and Verification Test of Flameproof Enclosure of Electric Apparatus IEC 60079-0 Electrical Apparatus for Explosive Gas Atmosphere - General Requirements IEC 60079-11 Construction and Test Intrinsically-Safe and Associated Apparatus IEC 60079-14 Electrical Installation in Explosive Gas Atmosphere IEC 60189-1 to 7 Low Frequency Cables and Wires with Insulation and PVC Sheath IEC 60227-1 to 5 Polyvinyl Chloride Insulated Cables, Rated Voltage Up to and Including 450/750 V IEC 60245-1 to 4 Rubber Insulated Cables of Rated Voltage Up to and Including 450/750 V IEC 60331 Fire Resisting Characteristics of Electric Cables IEC 60332 Test on Electric Cables Under Fire Conditions IEC 60529 Degrees for Protection Provided by Enclosures (IP Code) IEC 60584-1 Reference Tables - Thermocouples IEC 60584-2 Thermocouple - Tolerance IEC 60751 Industrial Platinum Resistance Thermometer Sensors IEC 00000-0-0 Electromagnetic Compatibility (EMC) Part 4-3. Testing And Measurement Technique – Radiated, Radio-Frequency, Electromagnetic Field Immunity IEC 61131-3 Programmable Controllers Part 3 Programming Languages – Second Edition International Organization for Standardization (ISO) ISO No. 5167-1 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 1: General principles and requirements ISO No. 5167-2 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 2: Orifice plates ISO No. 5167-3 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 3: Nozzles and Venturi nozzles ISO No. 5167-4 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-secti...
Process Piping. There is no process piping in this area. Utility piping will be provided for unit heaters, air conditioning equipment and shop requirements. The piping will be supported by individual hangers in this area. Piping insulation for steam and condensate piping is included in the piping scope of supply. An allowance has been included in the cost estimate for valve and piping specialty spare parts. Fire protection systems are described in Section 10.3 Architectural.

Related to Process Piping

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Compatibility 1. Any unresolved issue arising from a mutual agreement procedure case otherwise within the scope of the arbitration process provided for in this Article and Articles 25A to 25G shall not be submitted to arbitration if the issue falls within the scope of a case with respect to which an arbitration panel or similar body has previously been set up in accordance with a bilateral or multilateral convention that provides for mandatory binding arbitration of unresolved issues arising from a mutual agreement procedure case.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Tooling Unless otherwise specified in this Agreement, all tooling and/or all other articles required for the performance hereof shall be furnished by Seller, maintained in good condition and replaced when necessary at Seller's expense. If NETAPP agrees to pay Seller for special tooling or other items either separately or as a stated part of the unit price of Goods purchased herein, title to same shall be and remain in NETAPP upon payment therefore.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.