Process Equipment Sample Clauses

Process Equipment. The Xxx Xxxxxxx Company, Cimbria Sket and Westfalia will provide the process equipment. The Xxx Xxxxxxx Company will erect all equipment in the process structure. Piping of the process equipment and utilities, instrumentation mounting and wiring will be the responsibility of the Xxxxx Group of Des Moines, IA, a strategic partner of The Xxx Xxxxxxx Company. Tanks located in the tank farms will be provided and installed by The Xxx Xxxxxxx Company. These tanks will include appropriate foundations, piping, pipe insulation, tank insulation and painting as required. Tanks will be constructed of stainless steel and carbon steel to meet API 650 Code. Non-insulated stainless steel tanks will not be painted. Tanks that are heated will also be insulated. Pipe racks will be furnished as required from the rail loading and un-loading to the tank farm and from the tank farm into the process building. Pipe racks will also service the truck loading and unloading area as required and pipe racks will be sized for future four (4) 6” lines. The Xxx Xxxxxxx Company will construct the tank farm containment for the tanks. Containment will include the earthen berms, the containment walls, stabilized containment floors, finished surface gravel inside the containment dikes and final grading after erection of the field built tanks. One end of the containment dike will be left open to grade for access to construct the field build tanks. Tank foundations (by The Xxx Xxxxxxx Company) will be constructed after the tank farm containment is completed. All pressure vessels will be constructed to meet ASME as a minimum. Some vessels will be constructed in Germany per comparable German code and the ASME code. Soy Energy, LLC 06/19/2007 Page 6 of 10 Revision #01 As many of the pumps, valves, fittings, and instruments as possible will be purchased in the U.S. of performance quality equal to, or better than, comparable products available in Germany. All equipment and construction will have a minimum of a one-year mechanical warranty in force. Process piping will be specified, procured, installed and tested per ANSI B31-1 or ANSI B31-3 codes.
AutoNDA by SimpleDocs
Process Equipment. There is no process equipment in this area.
Process Equipment. There is no process equipment in this area. In-floor pulper loading conveyors start in this area but are included in the recycled fiber plant area.
Process Equipment. Detailed descriptions of the equipment are given in the vendor proposals.
Process Equipment. EXHIBIT 1 - SCOPE OF WORK -------------------------------------------------------------------------------- There is no process equipment in this area. Shop equipment is included in Section 10.3 Architectural.
Process Equipment. All process equipment installed on board the FPSO to separate, treat and process the fluid stream (Crude Oil and other liquids) received by the FPSO into Processed Oil and liquid waste and gases and the compression of natural gas, as needed, the design and specification of which is described in the Specifications.
Process Equipment. Tenant elected to have Landlord install the ----------------- Process Equipment pursuant to Section 2(d)(iv) of the Original Lease. Landlord confirms that it has received full payment in respect of the Process Equipment, and no Rent or other payments are due from Tenant in respect thereof. The Process Equipment shall be the property of Tenant and subject to the provisions of Section 7(c) of the Original Lease.
AutoNDA by SimpleDocs
Process Equipment. (i) Landlord and Tenant acknowledge that the machinery and equipment described on Exhibit "D" attached hereto and by this reference made a part hereof (the "Process Equipment") has been designed and manufactured at Tenant's request and is essential to the conduct and performance of Tenant's business to be conducted on the Premises. Landlord and Tenant understand and agree that, subject to the provisions of subparagraph 2(d)(iv) hereof, Tenant shall be solely responsible for installing the Process Equipment in the Building pursuant to the working drawings and blueprints listed on Exhibit "E" attached hereto and by this reference made a part hereof (the "Process Equipment Plans").
Process Equipment 

Related to Process Equipment

  • Equipment, Etc Each Grantor shall, (i) within ten (10) days after a written request by the Administrative Agent, in the case of Equipment now owned, and (ii) following a request by the Administrative Agent pursuant to subclause (i) above, within ten (10) days after acquiring any other Equipment, deliver to the Administrative Agent, any and all certificates of title, and applications therefor, if any, of such Equipment and shall cause the Administrative Agent to be named as lienholder on any such certificate of title and applications. No Grantor shall permit any such items to become a fixture to real estate or an accession to other personal property unless such real estate or personal property is the subject of a fixture filing (as defined in the UCC) creating a first priority perfected Lien in favor of the Administrative Agent.

  • Tenant’s Equipment Tenant shall provide notice to Landlord prior to moving any heavy machinery, heavy equipment, freight, bulky matter or fixtures (collectively, “Equipment”) into or out of the Building and shall pay to Landlord any costs actually incurred by Landlord in connection therewith. If such Equipment requires special handling, Tenant agrees (a) to employ only persons holding all necessary licenses to perform such work, (b) all work performed in connection therewith shall comply with all applicable Requirements and (c) such work shall be done only during hours designated by Landlord.

  • Tooling Unless otherwise specified in this Agreement, all tooling and/or all other articles required for the performance hereof shall be furnished by Seller, maintained in good condition and replaced when necessary at Seller's expense. If NETAPP agrees to pay Seller for special tooling or other items either separately or as a stated part of the unit price of Goods purchased herein, title to same shall be and remain in NETAPP upon payment therefore.

  • Rooftop Equipment Provided that Tenant complies with the terms of ----------------- this Section, Tenant may, at its risk and expense, install a satellite dish and related communications equipment and wiring (collectively, the "Rooftop ------- Equipment") on the roof of the Building at a location approved by Landlord, --------- which equipment may be used solely by Tenant and its Permitted Transferees or Permitted Sublessees. Before installing the Rooftop Equipment, Tenant shall submit to Landlord for its approval (which approval shall be in Landlord's sole discretion) plans and specifications which (a) specify in detail the design, location, size, and, in the case of a satellite dish, frequency of the Rooftop Equipment and (b) are sufficiently detailed to allow for the installation of the Rooftop Equipment in a good and workmanlike manner and in accordance with all Laws (the "Legal Requirements"). If Landlord approves of such plans, Tenant ------------------ shall install (in a good and workmanlike manner), maintain and use the Rooftop Equipment in accordance with all Legal Requirements and shall obtain all consents and permits required for the installation and operation thereof; copies of all such permits and evidence of such consents must be submitted to Landlord before Tenant begins to install the Rooftop Equipment. Tenant shall thereafter maintain all permits necessary for the maintenance and operation of the Rooftop Equipment while it is on the Building and operate and maintain the Rooftop Equipment in such a manner so as not to unreasonably interfere with any other satellite, antennae, or other transmission facility on the Building's roof or in the Building. Landlord may require that Tenant screen the Rooftop Equipment with a parapet or other screening device acceptable to Landlord. Tenant shall maintain the Rooftop Equipment and screening device in good repair and condition. Tenant shall, at its risk and expense, remove the Rooftop Equipment (including all wiring related thereto), within five days after the occurrence of any of the following events: (1) the termination of Tenant's right to possess the Premises; (2) the termination of the Lease; (3) the expiration of the Term; or (4)

  • Leased Equipment The risk of loss or damage to leased equipment, goods or property shall not transfer to the University except as provided in §680.219, Florida Statutes. Any security interest in the leased equipment, goods or property granted to the Contractor contrary to AGO 79-72 and AGO 80-9 is null and void. Limitations of remedies provisions, which are unconscionable under applicable Florida law, are void. MATERIAL SAFETY DATA SHEET (MSDS). In compliance with Florida Statutes, Ch. 442, a Material Safety Data Sheet (MSDS) must accompany any applicable item delivered under this Agreement.

  • Capital Equipment Collaborator’s commitment, if any, to provide ICD with capital equipment to enable the research and development activities under the Research Plan appears in Appendix B. If Collaborator transfers to ICD the capital equipment or provides funds for ICD to purchase it, then ICD will own the equipment. If Collaborator loans capital equipment to ICD for use during the CRADA, Collaborator will be responsible for paying all costs and fees associated with the transport, installation, maintenance, repair, removal, or disposal of the equipment, and ICD will not be liable for any damage to the equipment.

  • Additional Equipment Additional Equipment may from time to time be added as the subject matter of this Agreement as agreed on by the parties. Any additional property will be added in an amendment describing the property, the monthly rental, security deposit, and stipulated loss value of the additional Equipment. All amendments must be in writing and signed by both parties. Other than by this amendment procedure, this Agreement may not be amended, modified, or altered in any manner except in writing signed by both parties.

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the product in the required locations at no additional charge, unless otherwise designated on the Contract or purchase order. Contractor’s authorized product and price list shall clearly and separately identify any additional installation charges. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the product or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the product in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Spares Boeing will revise, as applicable, the customized Recommended Spares Parts List (RSPL) and Illustrated Parts Catalog (IPC).