Preventive Maintenance Orders (PMOs) Sample Clauses

Preventive Maintenance Orders (PMOs). The Contractor shall respond to and complete scheduled PMO work within one (1) week, IAW the Preventative Maintenance (PM) scheduled work issued by GFEBS, or by the time specified on the GFEBS Preventive Maintenance Plan/Work Order. PM work shall comply with the Picatinny Arsenal Directorate of Public Works (DPW) and IMCOM GFEBS business rules; and the IMCOM Facilities Maintenance Instruction. Please see Facilities Maintenance Instruction (refer to Section J) section 3.1.1
AutoNDA by SimpleDocs

Related to Preventive Maintenance Orders (PMOs)

  • Preventive Maintenance The Contractor shall provide necessary preventive maintenance, required testing and inspection, calibration and/or other work necessary to maintain the equipment in complete operational condition during the warranty period.

  • Preventative Maintenance Standards of applicable Professional Governing Body. Anesthesia and surgical equipment maintenance standards as per manufacturer specifications and guidelines, subject to review and acceptance by AHS.

  • Corrective Maintenance ‌ Corrective Maintenance as referred to herein shall mean Repair and/or Replacement Services. For the purposes of evaluating whether Corrective Maintenance qualifies as either Minor or Major Corrective Maintenance, the Contractor shall calculate the total cost of the Corrective Maintenance in accordance with the following formulas, and the cost shall be calculated per Repair Item which shall be compared to the Major/Minor Corrective Maintenance Threshold listed in Table 2. Total Cost of Repair Item = (Labor Cost) + (Material Cost) Where: Labor Cost = (H) x [(1 + LMR/100) x (PWR + SB)] H = Number of labor hours needed to complete the Corrective Maintenance LMR = Labor Markup Rate (%) PWR = Prevailing Wage Rate SB = Supplemental Benefits Material Cost = (Cost of Materials) x (1 + MMR/100) Where: MMR = Materials Markup Rate (%) The Contractor’s Monthly Maintenance fee shall include, but is not necessarily limited to, all preventative maintenance service and all corrective maintenance service with a total cost (labor and materials) less than or equal to the thresholds listed in the following table, which shall be referred to as ‘Minor Corrective Maintenance: Table 2: Corrective Maintenance Thresholds Lot(s) Type of Equipment Major/Minor Corrective Maintenance Threshold 1 Gearless Traction Elevators $2500 1 Geared Traction Elevators $2500 2 Hydraulic Elevators $1000 3 Escalators $2500 4 Wheelchair Lifts $500 4 Stage Lifts $500 4 Dumbwaiters $500 Corrective maintenance work that has a Total Cost that exceeds these thresholds shall be considered Major Corrective Maintenance. The Contractor shall justify all costs for Major Corrective Maintenance to the Authorized User’s satisfaction, and for Repair Items that qualify as Major Corrective Maintenance the Contractor shall be compensated for the full cost of the work unless the corrective maintenance is determined to be the result of the Contractor’s negligence, in which case the Contract shall not be additionally compensated. Prior to performing any Major Corrective Maintenance, the Contractor shall submit a Cost Proposal to the Authorized User for approval. The Cost Proposal shall be a maximum, not to exceed price; shall include all labor and material costs associated with the Major Corrective Maintenance and shall be calculated on a per item basis (like items shall not be combined in the calculation). Upon approval, a letter authorizing the work will be issued by the Authorized User and a copy of such letter must accompany the invoice for the Major Corrective Maintenance services. Please note that if subcontractors are to be used, the requirements of Section 2.22 ‘Subcontracting of Work’ shall be met.

  • Maintenance Scheduling The NTO shall schedule maintenance of its facilities designated as NTO Transmission Facilities Under ISO Operational Control and schedule any outages (other than forced transmission outages) of said transmission system facilities in accordance with outage schedules approved by the ISO. The NTO shall comply with maintenance schedules coordinated by the ISO, pursuant to this Agreement, for NTO Transmission Facilities Under ISO Operational Control. The NTO shall be responsible for providing notification of maintenance schedules to the ISO for NTO Transmission Facilities Requiring ISO Notification. The NTO shall provide notification of maintenance schedules to affected Transmission Owners for NTO Transmission Facilities Requiring ISO Notification and Local Area Transmission Facilities pursuant to Section 3.5.3 of the ISO Services Tariff.

  • Equipment Maintenance If this Contract involves computer or telecommunications hardware or other mechanical or electrical Equipment (use of the word "Equipment" means all the foregoing) as a Deliverable, then, during the warranty period and during any period covered by annual maintenance, the Contractor will provide Equipment maintenance to keep the Equipment in or restore the Equipment to good working order. This maintenance will include preventative and remedial maintenance, installation of safety changes, and installation of engineering changes based upon the specific needs of the individual item of Equipment. This maintenance will also include the repair, replacement, or exchange deemed necessary to keep the Equipment in good working order. For purposes of this Contract, Equipment restored to good working condition means Equipment that performs in accordance with the manufacturer's published specifications. The Contractor will exert its best efforts to perform all fault isolation and problem determination attributed to the Equipment covered under this Contract. The following services are outside the scope of this Contract:

  • Maintenance Outages If Seller reasonably determines that it is necessary to schedule a Maintenance Outage, Seller shall notify Buyer of the proposed Maintenance Outage at least five (5) days before the outage begins (or such shorter period to which Buyer may reasonably consent in light of then existing conditions). Upon such notice, the Parties shall plan the Maintenance Outage to mutually accommodate the reasonable requirements of Seller and the service obligations of Buyer; provided, however, that, unless Buyer otherwise consents, such consent not to be unreasonably withheld, no Maintenance Outage may be scheduled between the hour ending 0700 through the hour ending 2200, Monday through Saturday, during the time period commencing on May 15 and concluding on September 15. Notice of a proposed Maintenance Outage shall include the expected start date and time of the outage, the amount of Capacity of the Facility that will not be available, and the expected completion date and time of the outage. Seller shall give Buyer notice of the Maintenance Outage as soon as Seller determines that the Maintenance Outage is necessary. Buyer shall promptly respond to such notice and may request reasonable modifications in the schedule for the outage. Seller shall use all reasonable efforts to comply with any request to modify the schedule for a Maintenance Outage. Seller shall notify Buyer of any subsequent changes in Capacity available to Buyer or any changes in the Maintenance Outage completion date and time. As soon as practicable, any notifications given orally shall be confirmed in writing. Seller shall take all reasonable measures and exercise its best efforts in accordance with Prudent Electrical Practices to minimize the frequency and duration of Maintenance Outages.

  • Routine Maintenance (i) CRC shall be responsible for Routine Maintenance when necessary or desirable to maintain the Shared Assets in a safe operating condition, and to permit and facilitate (A) the performance by CRC of its obligations pursuant to this Agreement, and (B) the use of Shared Assets by the Operators in accordance with this Agreement.

  • Site Maintenance The authorized area shall be maintained in a neat, clean, and safe condition, free of any solid waste, debris, or litter, except as specifically authorized herein.

  • Project Maintenance The Local Government shall be responsible for maintenance of locally owned roads and locally owned facilities after completion of the work. The State shall be responsible for maintenance of the state highway system after completion of the work if the work was on the state highway system, unless otherwise provided for in existing maintenance agreements with the Local Government.

  • Planned Maintenance (a) Sellers may designate up to twenty (20) Days of Planned Maintenance on Sellers’ Facilities during each Contract Year. Sellers shall be entitled to reduce (including down to zero (0)) its Gas scheduling under Clause 8 and Exhibit 3 for each Day of Planned Maintenance.

Time is Money Join Law Insider Premium to draft better contracts faster.