Preliminary Survey Sample Clauses

Preliminary Survey. Prior to purchasing any Structure, the Client Agency shall conduct a preliminary survey to establish the exact limits of construction, identify the type of Structure to be ordered and determine if any site preparation is required prior to installation. Any Structure ordered must be the type designated by the Client Agency. The Contractor shall submit P.E. stamped layout or drawing for Client Agency approval. The Contractor provided drawings must include a layout sketch, material list, material designations and a contact person and telephone number for questions regarding the drawings.
AutoNDA by SimpleDocs
Preliminary Survey. Upon receipt of a complete Permit Application, the District shall conduct a Preliminary Survey of the Pole or Poles in question. The District shall use commercially reasonable efforts to complete the Preliminary Survey with thirty (30) calendar days of receipt of a complete Permit Application. Upon request, the District will conduct such Preliminary Survey together with representatives of the Licensee. In either case, the Costs incurred by the District to complete the Preliminary Survey shall be paid the by the Licensee. The Preliminary Survey shall determine:
Preliminary Survey. Consultant shall:
Preliminary Survey. Upon receipt of a written or electronic NJUNS application, the Inspection and Engineering Information Data Sheet, application fee and location map (if District pole site location numbers were not available), the District shall conduct a preliminary survey of the pole(s) in question and, if the Licensee requests, with representatives of the Licensee. The preliminary survey shall determine:
Preliminary Survey. 1. Provide topographic survey as needed for proposed improvements including location and elevation of existing surface features and locate, where possible, underground utilities from existing records.
Preliminary Survey. The ENGINEER shall perform the preliminary survey services for thirty-eight sites as determined by the County Engineer.
Preliminary Survey. Apex will obtain the required survey needed to complete project design with the project corridor. This includes topographic field survey (including above and below ground features and utilities), boundary survey and additional survey needed to verify right of way boundaries. CADD editing of the ground survey will be completed to use for the contract plan documents. The limits of this survey will encompass Xxxx St to 4th Ave W within the right of way. Side streets and alley ways will be surveyed 50 feet back from the right of way line. Building corners, door thresholds and parking lots will be surveyed if deemed necessary for the design of the project. Apex will survey trunk storm sewer structures (sizes and inverts) along the project corridor and to the Heart River outfall near Broadway. Apex will verify and document pipe sizes and inverts, emphasizing the pipe size reduction and configuration from Villard Street to the outfall.
AutoNDA by SimpleDocs
Preliminary Survey 

Related to Preliminary Survey

  • EU SURVEY 5.1. The participant shall complete and submit the online EU Survey after the mobility abroad within 30 calendar days upon receipt of the invitation to complete it.

  • Preliminary Matters The Chair of the Hearing Panel will ask each party if it has any objections to the constitution of the Hearing Panel. Responses will be noted and recorded. If an objection is raised, the party raising the objection will be asked to immediately outline the objection. The Hearing Panel will then determine the merits of the objection.

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • Preliminary 4. The business of the Company may be commenced at any time after incorporation.

  • Title Report If no Additional Mortgage Policy is required with respect to such Additional Mortgaged Property, a title report issued by the Title Company with respect thereto, dated not more than 30 days prior to the date such Additional Mortgage is to be recorded and satisfactory in form and substance to Administrative Agent;

  • Preliminary Approval Within a reasonable time after execution of this Settlement Agreement by the Parties, Plaintiff shall apply to the Court for the entry of an Order:

  • Survey Buyer may obtain a survey of the Property before the Closing to assure that there are no defects, encroachments, overlaps, boundary line or acreage disputes, or other such matters, that would be disclosed by a survey ("Survey Problems"). The cost of the survey shall be paid by the Buyer. Not later than business days prior to the Closing, Buyer shall notify Seller of any Survey Problems which shall be deemed to be a defect in the title to the Property. Seller shall be required to remedy such defects within business days and prior to the Closing. If Seller does not or cannot remedy any such defect(s), Buyer shall have the option of canceling this Agreement, in which case the Xxxxxxx Money shall be returned to Buyer.

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Preliminary Examination 2.22.1 The Procuring entity will examine the tenders to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed, and whether the tenders are generally in order.

Time is Money Join Law Insider Premium to draft better contracts faster.