Preliminary Plans, Cost Review and Approval Sample Clauses

Preliminary Plans, Cost Review and Approval. The CITY will review the preliminary plans submittal and provide comments and conditional approval. I&L will incorporate the review comments into the final design plan. WILDWOOD ‐ XXXXX ROAD FLOOD CONTROL DESIGN Personnel Type/Title Principal Project Manager H&H Engineer CAD / GISDesigner Environmental Scientist Structural Engineer Subtotal Hours Subtotal Personnel Cost Direct Expenses Sub Consultant Expenses Subtotal Personnel Billing Rate 225.00 135.00 105.00 95.00 75.00 150.00 1.0 Surveying 0 $ ‐ $ ‐ Coordination 4 4 $ 540.00 $ 540.00 1 $ 30,000 Meridian 0 $ ‐ $ 30,000.00 $ 30,000.00 1 $ 9,500 0 $ ‐ $ 9,500.00 $ 9,500.00 0 $ ‐ $ ‐ Subtotal = 0 4 0 0 0 0 4 $ 540.00 $ ‐ $ 39,500.00 $ 40,040.00 2.0 Hydraulic Analysis 0 $ ‐ $ ‐ HEC RAS Modeling 0 $ ‐ $ ‐ Developed Existing Conditions RAS 8 32 40 $ 4,440.00 $ 4,440.00 0 $ ‐ $ ‐ Final Hydraulic Design 0 $ ‐ $ ‐ Develop 2015 Analysis Configurations 4 20 24 $ 2,640.00 $ 2,640.00 Evaluate modifications to configuration 4 12 16 $ 1,800.00 $ 1,800.00 Evaluate 100 year design solutions 4 4 $ 540.00 $ 540.00 0 $ ‐ $ ‐ Design Meeting 0 $ ‐ $ ‐ Prepare for meeting 1 2 3 $ 345.00 $ 345.00 meet with City 4 4 8 $ 960.00 $ 960.00 0 $ ‐ $ ‐ 0 $ ‐ $ ‐ Subtotal = 0 25 70 0 0 0 95 $ 10,725.00 $ ‐ $ ‐ $ 10,725.00 3.0 Open House 0 $ ‐ $ ‐ Open House Coordination 1 1 2 $ 240.00 $ 240.00 0 $ ‐ $ ‐ Open House Presentation 2 8 10 $ 1,110.00 $ 1,110.00 0 $ ‐ $ ‐ Open House Exhibits and Forms 2 8 10 $ 1,110.00 $ 1,110.00 Attend Open House 4 4 4 12 $ 1,860.00 $ 1,860.00 Open House Summary 1 2 3 $ 345.00 $ 345.00 0 $ ‐ $ ‐ Follow Up Resident Coordination 16 16 $ 2,160.00 $ 2,160.00 0 $ ‐ $ ‐ Subtotal = 4 26 23 0 0 0 53 $ 6,825.00 $ ‐ $ ‐ $ 6,825.00 4.0 Preliminary Plans 0 $ ‐ $ ‐ Preliminary Design 8 16 24 $ 2,760.00 $ 2,760.00 Utility Coordination 0 $ ‐ $ ‐ Utility Submittal 1 2 3 $ 345.00 $ 345.00 Utility Coordination 1 4 5 $ 555.00 $ 555.00 Utility Documentation 2 2 $ 210.00 $ 210.00 Preliminary Plans 0 $ ‐ $ ‐ 1 Cover 1 2 3 $ 325.00 $ 325.00
AutoNDA by SimpleDocs
Preliminary Plans, Cost Review and Approval. The County will review the preliminary plans submittal and provide comments and conditional approval. I&L will incorporate the review comments into the final design plan.

Related to Preliminary Plans, Cost Review and Approval

  • Review and Approval Documents specified above must be submitted for review and approval by CITY Purchasing and Contracts prior to the commencement of work by CONTRACTOR. Neither approval by CITY nor failure to disapprove the insurance furnished by CONTRACTOR shall relieve CONTRACTOR of CONTRACTOR’S full responsibility to provide the insurance required by this Contract. Compliance with the insurance requirements of this Contract shall not limit the liability of CONTRACTOR or its sub-contractors, employees or agents to CITY or others, and shall be in addition to and not in lieu of any other remedy available to CITY under this Contract or otherwise. CITY reserves the right to request and review a copy of any required insurance policy or endorsement to assure compliance with these requirements.

  • Ongoing Review and Revisions As set forth in Section 35.7, the Parties have agreed to the coordination and exchange of data and information under this Agreement to enhance system reliability and efficient market operations as systems exist and are contemplated as of the Effective Date. The Parties expect that these systems and the technology applicable to these systems and to the collection and exchange of data will change from time to time throughout the term of this Agreement. The Parties agree that the objectives of this Agreement can be fulfilled efficiently and economically only if the Parties, from time to time, review and, as appropriate, revise the requirements stated herein in response to such changes, including deleting, adding, or revising requirements and protocols. Each Party will negotiate in good faith in response to such revisions the other Party may propose from time to time. Nothing in this Agreement, however, shall require any Party to reach agreement with respect to any such changes, or to purchase, install, or otherwise implement new equipment, software, or devices, or functions, except as required to perform this Agreement.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Training Plan Within 90 days after the Effective Date, Good Shepherd shall develop a written plan (Training Plan) that outlines the steps Good Shepherd will take to ensure that: (a) all Covered Persons receive adequate training regarding Good Shepherd’s CIA requirements and Compliance Program, including the Code of Conduct and (b) all Relevant Covered Persons receive adequate training regarding: (i) the Federal health care program requirements regarding eligibility for hospice services upon initial admission, recertification for continued stay, and for Continuous Care, Respite Care, and General Inpatient Care; (ii) the role of physicians in making eligibility determinations; (iii) the accurate coding and submission of claims; (iv) policies, procedures, and other requirements applicable to the documentation of medical records; (v) the personal obligation of each individual involved in the claims submission process to ensure that such claims are accurate; (vi) applicable reimbursement statutes, regulations, and program requirements and directives; (vii) the legal sanctions for violations of the Federal health care program requirements; and (viii) examples of proper and improper eligibility determinations, documentation, and claims submission practices. The Training Plan shall include information regarding the training topics, the categories of Covered Persons and Relevant Covered Persons required to attend each training session, the length of the training, the schedule for training, and the format of the training. Within 30 days of the OIG’s receipt of Good Shepherd’s Training Plan, OIG will notify Good Shepherd of any comments or objections to the Training Plan. Absent notification by the OIG that the Training Plan is unacceptable, Good Shepherd may implement its Training Plan. Good Shepherd shall furnish training to its Covered Persons and Relevant Covered Persons pursuant to the Training Plan during each Reporting Period.

  • County Review and Approval of Insurance Requirements The County reserves the right to review and adjust the Required Insurance provisions, conditioned upon County’s determination of changes in risk exposures.

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Project Reports; Completion Report 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report.

  • Project Review A. Programmatic Allowances

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.