Power washing Sample Clauses

Power washing. 7.2.1. When subjected to a continuous spraying action for 60 seconds on the test component in its normal mounting conditions, a test sample shall show no damage to the retro-reflective surface or delamination from the substrate or separation from the sample mounting surface under the following set-up parameters:
AutoNDA by SimpleDocs
Power washing. 4.16.5.1. Pressure steam clean median coping, planter walls, median nosing, and miscellaneous median hardscape features as directed by NYCDOT
Power washing. All power washing conducted shall be in compliance with local, State, and Federal regulations. Power washing shall not contain any soap or chemicals and only potable water shall be utilized. All power washing discharge shall be contained and cannot enter the street or storm drain system. Discharge shall be directed onto pervious surfaces or vegetated areas where the water can infiltrate into the ground. Power washing shall be done in a manner that does not impact endangered species, cause damage to existing vegetation, or cause soil disturbance.
Power washing. A. Power wash entire garage including stairways at least twice per year. Depending on traffic, this service can be increased for the high-traffic or high-visibility areas of the parking garage.
Power washing. 19.1 The Contractor shall recycle and filter all water that is used in the cleaning process in accordance to the City of Houston Ordinances and the E.P.A.
Power washing i. Power washing will be used to remove graffiti and hard-to clean substances from sidewalks and/or block walls or as determined by the City.
Power washing. Producer will be responsible for Power Washing any areas that Producer leaves stained.
AutoNDA by SimpleDocs

Related to Power washing

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • Contractor’s Power and Authority The Contractor warrants that it has the full power and authority to grant the rights herein granted and will hold the County hereunder harmless from and against any loss, cost, liability and expense, including reasonable attorney fees, arising out of any breach of this warranty. Further, the Contractor avers that it will not enter into any arrangement with any third party which might abridge any rights of the County under this Contract.

  • Corporate Power The Company has all requisite corporate power to execute and deliver this Agreement and to carry out and perform its obligations under the terms of this Agreement.

  • Electric If Customer has selected an Electricity Fixed Rate on the Application, Customer’s Price will be based on the Fixed Rate(s) which includes Local and State taxes, Gross Receipts Tax (GRT), PJM Adjustment (defined below) charges and adjustments and Utility applied charges and/or fees related to generation, plus the Administration Charge, which includes, Electricity Balancing Amount and third party utility and billing charges. Customer understands and agrees that included in the Administration Charge is the cost of the Energy Balancing Amount (defined below). Customer understands that in order for RITERATE ENERGY to be able to supply Energy to its existing and prospective customers, RITERATE ENERGY enters into supply arrangements to meet the forecasted consumption of its various groups of customers. These forecasts are based on historical data, load shapes and/or estimates. To the extent that actual pooled consumption of RITERATE ENERGY’s Energy customers varies from supply arrangements and/or Customer’s Utility delivery requirements, RITERATE ENERGY incurs a cost in balancing and settling its supply arrangements with such pooled consumption. To ensure a fixed all-inclusive Rate, RITERATE ENERGY has included in the Administration charge, the Energy Balancing Amount, to balance and settle the variance between pooled consumption and supply arrangements (the “Energy Balancing Amount”). In respect of Electricity, Customer understands that there are certain estimated pass through costs, made up of charges to RITERATE ENERGY by the PJM Interconnection (“PJM”) and/or Customer’s Utility, including but not limited to ancillary service charges, the cost of unaccounted for electricity, capacity charges and any replacement or recharacterization of these charges. In this regard, the “PJM Adjustment”, is included in the Fixed Price Rate. Customer acknowledges and agrees that by entering into this Agreement, Customer will not be eligible to receive any net metering credits and other incentives to which Customer would otherwise be entitled. Further, included in the Rate are the amounts charged or billed to RITERATE ENERGY or Customer by Customer’s Utility, the PUC or any other regulatory or government entity, including any taxes, delivery, regulated transmission, regulated distribution, pipeline, compressor fuel, uplift, congestion, locational marginal pricing, invoice market participant, service, billing, or similar or related changes and any, deposits, interest or late payment fees or other amounts in connection with the supply and delivery of Energy to the Premises (collectively, “Regulatory Charges”). Customer agrees to pay the monthly Administration charge for Energy supply (the “Administration” charge).

  • Trash Tenant shall not allow anything to be placed on the outside of the Building, nor shall anything be thrown by Tenant out of the windows or doors, or down the corridors or ventilating ducts or shafts, of the Building. All trash and refuse shall be placed in receptacles provided by Landlord for the Building or by Tenant for the Premises.

  • Other Necessary Acts Each party shall execute and deliver to the other all such further instruments and documents as may be reasonably necessary to carry out this Agreement in order to provide and secure to the other parties the full and complete enjoyment of rights and privileges hereunder.

  • Wyoming CANCELLATION section is amended as follows: A ten percent (10%) penalty per month shall be applied to refunds not paid or credited within forty-five (45) days of receipt of returned Service Agreement. ARBITRATION section of this Agreement is removed.

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

Time is Money Join Law Insider Premium to draft better contracts faster.