Positive Test results for Antibiotics AFTER Milk is collected and has caused the TANKER TO RETURN A POSITIVE RESULT . UPON CUSTOMER RISK ASSESSMENT , MILK IS ACCEPTED. Supplier will not be paid for this Milk as it has tested positive for antibiotics and is deemed to be in breach of ACM Food Safety Program (see part 6.1 for details) and Milk Quality Standards (see Table 3.1). For all positive samples (vat or Tanker) Milk collection will be suspended until a negative sample is achieved. Any subsequent positive vat samples taken during this process will not be paid for. Only after a negative sample is achieved, will ACM schedule Milk for collection. Supplier will be required to complete a CAR (Corrective Action Report) which is a requirement of ACM’s Food Safety Program. Refer to section 4.3 Management of Non‐Conformance ‐ Incident Report in the ACM Food Safety Program manual.
Positive Test Result Where there has been a positive test result in a confirmatory test and in any confirmatory retest (if the employee requested one), the Employer will do the following unless the employee has furnished a legitimate medical reason for the positive test result:
Positive Test Results In the event an employee tests positive for drug use, the employee will be provided, in writing, notice of their right to explain the test results. The employee may indicate any relevant circumstance, including over the counter or prescription medication taken within the last thirty (30) days, or any other information relevant to the reliability of, or explanation for, a positive test result.
CONSEQUENCES OF POSITIVE TEST RESULTS For post-Accident or reasonable suspicion, a Covered Employee shall be immediately removed from performing his or her job or, in the alternative, may be temporarily reassigned to work that is not safety-sensitive if such work is available. The Covered Employee shall be subject to disciplinary action, and shall meet with the SAPC, as set forth in Exhibit A, and section 10 below, if the Covered Employee:
STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is an NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram with the exception of the English Language Proficiency Assessments for California (“ELPAC”) to be completed by the LEA, and as appropriate to the student, and mandated by XXX xxxxxxxx to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. XXX shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by XXX.
Reasonable Cause Testing Reasonable cause for testing is a belief that an employee is under the influence of a drug and/or alcohol based on specific facts and/or reasonable inferences derived from those facts. An observing supervisor shall describe and document the following: -Specific observations concerning the appearance, behavior, speech or performance of the employee; and/or -Violation of safety rule or other unsafe work incident which, after investigation, leads the supervisor(s) to believe that drug and/or alcohol use may be a contributing factor; and/or -Other physical, circumstantial or immediate indicators of drug and/or alcohol use.
Development Milestones In addition to its obligations under Paragraph 7.1, LICENSEE specifically commits to achieving the following development milestones in its diligence activities under this AGREEMENT: (a) (b).
Direct Trunked Transport 7.3.2.1 Either Party may elect to purchase direct trunked transport from the other Party.
Positive Time Reporting Employees will accurately report time worked in accordance with a positive time reporting process as determined by each agency.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.