Common use of Plattsburgh Substation Clause in Contracts

Plattsburgh Substation. The new communications equipment will be housed in the existing building and the new antenna mounted on the existing tower. The scope of work will include the following: Tower Evaluation: A structural evaluation of the existing tower and foundation for the new equipment has been performed. The tower was confirmed compliant with Transmission Owner’s and ANSI/TIA 222-G-2005 Class III standards. Antennas: A 6 ft diameter antenna pointing to Big Hill will be installed on the existing tower 150 ft above ground in accordance with the design specifications. Radio Equipment: Radio and associated equipment will be provided in accordance with Transmission Owner specifications.

Appears in 16 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs

Plattsburgh Substation. The new communications equipment will be housed in the existing building and the new antenna mounted on the existing tower. The scope of work will include the following: Tower Evaluation: A structural evaluation of the existing tower and foundation for the new equipment has been performed. The tower was confirmed compliant with Connecting Transmission Owner’s and ANSI/TIA 222-G-2005 Class III standards. Antennas: A 6 ft diameter antenna pointing to Big Hill will be installed on the existing tower 150 ft above ground in accordance with the design specifications. Radio Equipment: Radio and associated equipment will be provided in accordance with Connecting Transmission Owner specificationsrequirements.

Appears in 4 contracts

Samples: Generator Interconnection Agreement, Large Generator Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.