Physical Parameters Sample Clauses

Physical Parameters. The project will be constructed on public property of the State of Georgia administered by the State Agency identified in the Contract as the Owner. If appropriate, a plat of boundary line survey of the property shall be furnished to the Design Professional by the Owner, and the Design Professional is entitled to rely on such information. The project will be occupied and is for the benefit of the Using Agency identified in the Contract. The construction of the Project shall be procured by using the Design-Bid-Build delivery method with a single bid package.
AutoNDA by SimpleDocs
Physical Parameters. The Project will be constructed on public property of the Board of Public Education for the City of Savannah and the County of Chatham. A plat of boundary line survey of the property involved was furnished to the Design Professional under cover of a letter from the Owner, identified in the Contract, and the Design Professional is entitled to rely on such information.
Physical Parameters. “Example: Western Michigan University has defined the partial renovation of Xxxxxxx Xxxx and the adjacent site next to Xxxxxx Center as the new location for the School of Art.”
Physical Parameters. Size (Cross Sectional Area) Minimum No. of Strand in Conductor Nominal Insulation Thickness Minimum Inner Sheath Thickness Nominal Outer Sheath Thickness Approx. Overall Dia of Cable Approx. Weight of Cable With Al'm Cond. With Cu Cond. Sqmm No's No's mm mm mm mm Kg/Km Kg/Km 3X 25+16 6/6 6/6 1.20/1.00 0.30 2.00 23 700 1250 3X35+16 6/6 6/6 1.20/1.00 0.30 2.00 25 800 1550 3X 50+25 6/6 6/6 1.40/1.20 0.30 2.20 28 1050 2050 3X70+35 12/6 12/6 1.40/1.20 0.40 2.20 32 1400 2800 3X95 +50 15/6 15/6 1.60/1.40 0.40 2.20 36 1800 3700 3X120+70 15/12 18/12 1.60/1.40 0.50 2.40 39 2200 4700 3X150+70 15/12 18/12 1.80/1.40 0.50 2.40 43 2550 5550 3X 185+95 30/15 30/15 2.00/1.60 0.50 2.40 47 3150 6900 3X240+120 30/15 34/18 2.20/1.60 0.60 3.00 53 4050 8950 3X300+150 30/15 34/18 2.40/1.80 0.60 3.20 58 4900 11100 3X400+185 53/30 53/30 2.60/2.00 0.70 3.40 64 6150 14000 3X500+240 53/30 53/34 3.00/2.20 0.70 3.80 76 7900 18050 3X630+300 53/30 53/34 3.40/2.40 0.70 4.00 84 9900 22950 Property of TPSODL – Not to be reproduced without permission of TPSODL TATA POWER SOUTHERN ODISHA DISTRIBUTION LIMITED, BERHAMPUR TECHNICAL SPECIFICATION Document Title Specification For 1.1kv Unarmoured Control Cable 3 & ½ Core X (4 TO 630 xx.xx) Document No. ENG-LV-07 Issue Date: 17.04.2024 Revision No. 00 Page No:4 Prepared by: Xxxxxxxxx Xxxxx Reviewed By: Xxxxxxxxxx Xxxxx Xxxxxxx Approved & Issued By: Xxxxxxx Xxxxxx Xxxxx
Physical Parameters. The Project will be constructed on public property of the Unified Government of Athens- Xxxxxx County.

Related to Physical Parameters

  • Physical Plant The Board of Supervisors agrees to provide, subject to the budgetary and fiscal provisions of the Charter, the following physical equipment and work environment for users of video display equipment:

  • Physical Exams The Employer agrees to provide without cost to employees, physical examinations and/or other appropriate tests when such tests are deemed necessary by management to determine whether the health of employees is being or has been adversely affected by exposure to potentially harmful physical agents, toxic materials, or infectious agents, or by attacks and assaults. The Employer agrees to provide to each affected employee who requests it a complete and accurate written report of any such medical examination or other appropriate tests related to occupational exposure. Additionally, written results of an industrial hygiene measurements or investigations related to an employee's occupational exposure will also be provided, upon request, to the employee or the employee's authorized representative. The Union and/or members of the applicable Health and Safety Committee will be provided copies of summary reports, but such reports will not contain personally identifying information.

  • ODUF Physical File Characteristics 6.2.1 ODUF will be distributed to Image Access via Secure File Transfer Protocol (FTP). The ODUF feed will be a variable block format. The data on the ODUF feed will be in a non-compacted EMI format (one hundred seventy-five (175) byte format plus modules). It will be created on a daily basis Monday through Friday except holidays. Details such as dataset name and delivery schedule will be addressed during negotiations of the distribution medium. There will be a maximum of one (1) dataset per workday per OCN. If BellSouth determines the Secure FTP Mailbox is nearing capacity levels, BellSouth may move the customer to CONNECT:Direct file delivery.

  • Project Parameters As used herein, “Project Parameters” shall mean: (a) the Product Design Requirements (“PDR”); (b) the PSD which includes the Instrument Specifications; (c) the Reliability Program Plan; (d) the Project Planning Documents, including the Project Schedule, containing a list of Milestones and the dates of completion for those Milestones; (e) the Project Proposal; (f) Acceptance Criteria; and (g)

  • Physical Architecture 59.2.1 CenturyLink's network architecture in any given local exchange area and/or LATA can vary markedly from another local exchange area/LATA. Using one or more of the NIMs herein, the Parties will agree to a physical architecture plan for a specific LATA, or if appropriate based on other requirements in Section 59, Local Calling Area. The physical architecture plan, as described in the Local Interconnection POI Profile, will be discussed during joint implementation planning. CLEC and CenturyLink agree to Interconnect their networks through existing and/or new Interconnection Facilities between CLEC switch(es) and CenturyLink's End Office Switch(es) and/or Tandem Switch(es). The physical architecture plan will be in accordance with Forecasting and Planning requirements in Article IV.

  • Physical File Characteristics 6.2.1 The Optional Daily Usage File will be distributed to <<customer_name>> via an agreed medium with CONNECT:Direct being the preferred transport method. The Daily Usage Feed will be a variable block format (2476) with an LRECL of 2472. The data on the Daily Usage Feed will be in a non-compacted EMI format (175 byte format plus modules). It will be created on a daily basis (Monday through Friday except holidays). Details such as dataset name and delivery schedule will be addressed during negotiations of the distribution medium. There will be a maximum of one dataset per workday per OCN.

  • Physical Examinations Where the Employer requires an employee to take a physical examination, doctor's fees for such examination shall be paid by the Employer. Except prior to commencement of employment and the first four (4) weeks of employment, such examinations shall be taken during the employee's working hours without loss of pay to the employee.

  • Physical Distancing 1. The District shall limit occupancy of bathrooms, elevators, locker rooms, staff rooms, offices, warehouses, and conference rooms, and any other shared work or school spaces to provide no less than six (6) feet of distancing. Adjacent bathroom stalls may be used. The District shall post signs with occupancy limits conspicuously at the entrance to each room.

  • Physical Examination The Employer, at its own expense, shall have the right and be given the opportunity to have a medical doctor appointed by the Employer examine, as often as it may reasonably require, any employee whose injury, sickness, mental or nervous disorder is the basis of claim upon this Plan.

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.