Percent Design Sample Clauses

Percent Design. At 90% design, City will notify Developer in writing within ten weeks after receipt of design documents at each required stage of design, of approval, or of request for modifications. If modifications are requested, Developer shall modify and resubmit Design Documents for City approval.
AutoNDA by SimpleDocs
Percent Design. The CONSULTANT will complete the following activities resulting in the submission and review of a 60-percent design submittal: • Prepare five copies of 60-percent design drawings and specifications: Based upon the concepts presented in the Basis of Design Report (30-percent) submittal, comments received from the OWNER’s staff, and the completion of the 30-percent design review meeting, CONSULTANT will prepare the 60-percent design submittal. • The contract drawings will include site plans and outside piping layout, mechanical plans and sections, operational and control descriptions of major equipment and process and instrumentation diagrams (P&ID), and subsurface soil investigation report. The estimated fee to complete a subsurface soil investigation is included in the project budget. The specifications will include Division 1 and all major equipment specifications. • Contact Sunshine State One Call of Florida (SSOCF) to identify utility companies who operate inside the project area and request markup of their existing underground utilities. • Attend a 60-percent design review meeting to discuss the contents and concepts of the submittal and receive the OWNER’s comments. Prepare meeting minutes for distribution to all meeting attendees.
Percent Design. The CONSULTANT will complete the following activities resulting in the submission and review of a 90-percent design submittal: • Prepare five copies of the 90-percent design drawings and specifications: Based upon comments received from the OWNER’s staff on the 60-percent design review, CONSULTANT will prepare the 90-percent design submittal. • Prepare an updated EPCC to be submitted with the 90-percent design submittal. In preparing the opinion of probable construction cost, we will rely on equipment supplier price quotes, Means construction cost data, and recent bid tabulations for similar work and adjusted for inflation. • Prepare an updated project schedule for inclusion with the 90-percent design submittal. • Attend a 90-percent design review meeting to discuss the contents and concepts of the submittal and to receive the OWNER’s comments. Prepare meeting minutes for distribution to all meeting attendees.
Percent Design. Prepare a written response to the City’s comments and incorporate the City’s comments into the 95% submittal. Prepare a complete set of demolition, civil, mechanical, electrical and instrumentation drawings. Prepare a complete set of technical specifications and special provisions, including testing and startup plans and construction constraints and sequencing. Plans shall include the details, notes, and references required for construction of the project. Prepare an updated opinion of probable construction cost. Prepare and submit ten sets of 95 percent half-size drawings, specifications, and opinion of probable construction cost. ♦ Discuss the 95 percent design documents with the City at design review meeting. Prepare agenda and meeting minutes.
Percent Design. At 90% design, City will notify Subdivider in writing within ten weeks after receipt of design documents at each required stage of design, of approval, or of request for modifications. If modifications are requested, Subdivider shall modify and resubmit Design Documents for City approval.
Percent Design. CONSULTANT shall:  Prepare drawings, construction cost estimates, an updated permit matrix and schedule for the PROJECT to reflect a 70 percent level of completion for a design review meeting with CNLV staff.  Prepare and furnish for the design review meeting three (3) sets of 24" x 36" Progress Drawings, and three (3) copies of the construction cost estimate, utility permit matrix, and PROJECT schedule. Provide progress drawings and documents to the City one week before the design review meeting.

Related to Percent Design

  • Pavement Design If applicable, the Engineer shall incorporate the pavement design developed by the State for this project. If the pavement design is not available, the State may request the Engineer to perform pavement design and submit to State for review and approval.

  • The Design Builder shall maintain an occurrence form commercial general liability policy or policies insuring against liability arising from premises (including loss of use thereof), personal injury or death, advertising injury, liability insured under an insured contract (including the tort liability of another assumed in a business contract) occurring on or in any way related to the premises or occasioned by reason of the operations of Design-Builder. Such coverage shall be written on an ISO occurrence form (ISO Form CG 00 01 12 07 or a policy form providing equivalent coverage) in an amount of not less than $1,000,000.00 per occurrence and not less than $2,000,000.00 aggregate. Unless otherwise provided, the policy or policies of insurance providing the liability coverage shall include:

  • NASPO ValuePoint eMarket Center a. In July 2011, NASPO ValuePoint entered into a multi-year agreement with SciQuest, Inc. whereby SciQuest will provide certain electronic catalog hosting and management services to enable eligible NASPO ValuePoint’s customers to access a central online website to view and/or shop the goods and services available from existing NASPO ValuePoint Cooperative Contracts. The central online website is referred to as the NASPO ValuePoint eMarket Center.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • How to get a TIN If you do not have a TIN, apply for one immediately. To apply for an SSN, get Form SS-5, Application for a Social Security Card, from your local SSA office or get this form online at xxx.XXX.xxx. You may also get this form by calling 0-000-000-0000. Use Form W-7, Application for IRS Individual Taxpayer Identification Number, to apply for an ITIN, or Form SS-4, Application for Employer Identification Number, to apply for an EIN. You can apply for an EIN online by accessing the IRS website at xxx.xxx.xxx/Xxxxxxxxxx and clicking on Employer Identification Number (EIN) under Starting a Business. Go to xxx.xxx.xxx/Xxxxx to view, download, or print Form W-7 and/or Form SS-4. Or, you can go to xxx.xxx.xxx/XxxxxXxxxx to place an order and have Form W-7 and/or SS-4 mailed to you within 10 business days. If you are asked to complete Form W-9 but do not have a TIN, apply for a TIN and write “Applied For” in the space for the TIN, sign and date the form, and give it to the requester. For interest and dividend payments, and certain payments made with respect to readily tradable instruments, generally you will have 60 days to get a TIN and give it to the requester before you are subject to backup withholding on payments. The 60-day rule does not apply to other types of payments. You will be subject to backup withholding on all such payments until you provide your TIN to the requester.

  • Multi-year Planning Targets Schedule A may reflect an allocation for the first Funding Year of this Agreement as well as planning targets for up to two additional years, consistent with the term of this Agreement. In such an event, the HSP acknowledges that if it is provided with planning targets, these targets:

  • Research Design The data generated by excavations at the prehistoric site(s) will be used to examine at least three topics: (1) chronology; (2) technology; and (3) subsistence practices. Insights into changing patterns of community organization may also be granted, as may insights into changes in social organization. The data recovered will then be compared to data from other regional sites.

  • Creative Commons Attribution-Non-Commercial-NoDerivs License The Creative Commons Attribution Non-Commercial-NoDerivs License (CC-BY-NC-ND) permits use, distribution and reproduction in any medium, provided the original work is properly cited, is not used for commercial purposes and no modifications or adaptations are made. (see below) Use by commercial "for-profit" organizations Use of Wiley Open Access articles for commercial, promotional, or marketing purposes requires further explicit permission from Wiley and will be subject to a fee. Further details can be found on Wiley Online Library xxxx://xxxxxxx.xxxxx.xxx/WileyCDA/Section/id-410895.html Other Terms and Conditions:

  • Rights are cumulative The rights and remedies provided in this agreement are cumulative and not exclusive of any other rights or remedies (whether provided by law or otherwise).

  • Project Design Applicants must design a project that provides access to health services to enable eligible women and men experiencing health needs to secure and maintain safe and accessible quality screening and diagnostic services, comprehensive family planning, and/ or other women’s health services.

Time is Money Join Law Insider Premium to draft better contracts faster.