Peak load resource Sample Clauses

Peak load resource. The requirements for peak load resource for each system operator to comply with will depend on national legislation. By peak load resource is meant active reserve which is not normally used. For anticipated peak load periods, the preparedness time is reduced so that the capacity, as and when needed, can be used. The service can be exchanged between the subsystems in the joint Nordic regulation market. However, in the event of power shortages, Appendix 9 Rules for managing power shortages during high consumption, bottlenecks or disturbances will come into force. The peak load resource can be offered to Elspot at Nord Pool Spot. TSO Generation of system service Exchange between subsystems Energinet. dk East Not used. Energinet. xx Xxxx Not used. Fingrid The service is referred to as peak load capacity in Finland. It is provided through contracts with electricity producers and users. Statnett Not used.
AutoNDA by SimpleDocs
Peak load resource. Requirements for each system operator to comply with will depend on national legislation. By peak load resource is meant active reserve which is not normally used. For anticipated peak load periods, the preparedness time is reduced so that the capacity, as and when needed, can be used. The service can be exchanged between the subsystems in the joint Nordic regulation market. However, in the event of power shortages, Appendix 9 will come into force. TSO Generation of system service Exchange between subsystems Energinet. dk East Not used. Energinet. xx Xxxx Not used. Fingrid Not used. Statnett Not used. Svenska Kraftnät Being procured. 2 Description of routines for trading in system services

Related to Peak load resource

  • Services and Resources Services Contractor Agrees to Perform. Contractor agrees to perform the Services stated in Appendix A, “Scope of Services." Officers and employees of the City are not authorized to request, and the City is not required to reimburse the Contractor for, Services beyond the Scope of Services listed in Appendix A, unless Appendix A is modified as provided in Section 11.5, "Modification of this Agreement."

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Network Resource Interconnection Service (check if selected)

  • PROJECT FINANCIAL RESOURCES i) Local In-kind Contributions $0 ii) Local Public Revenues $0 iii) Local Private Revenues iv) Other Public Revenues: $0 - ODOT/FHWA $0 - OEPA $2,675,745 - OWDA $0 - CDBG $0 - Other $0 SUBTOTAL $2,675,745 v) OPWC Funds: - Loan $299,000 SUBTOTAL $299,000 TOTAL FINANCIAL RESOURCES $2,974,745

  • Water Resources Four (4) Union Stewards unless the unit falls below sixty (60) employees and then not more than two (2) Union Stewards.

  • Air Transport Services 1. For the purposes of this Article:

  • TRANSPORT SERVICES Upon the conclusion of such multilateral negotiations, the Parties shall conduct a review for the purpose of discussing appropriate amendments to this Agreement so as to incorporate the results of such multilateral negotiations.

  • Transmission System Operation The NTO shall be responsible for ensuring that all actions related to the operation, maintenance and modification of its facilities that are designated as NTO Transmission Facilities Under ISO Operational Control and NTO Transmission Facilities Requiring ISO Notification are performed in accordance with the terms of this Agreement, all Reliability Rules and all other applicable reliability rules, standards and criteria, all operating instructions, ISO Tariffs, and ISO Procedures.

  • Test Energy Company shall use reasonable efforts to accept test energy that is delivered as part of the normal testing for generators (such as energy delivered to Company during the Control System Acceptance Test but not during the Acceptance Test), provided Seller shall use reasonable efforts to coordinate such normal testing with Company so as to minimize adverse impacts on the Company System and operations. Company shall not compensate Seller for test energy.

Time is Money Join Law Insider Premium to draft better contracts faster.