Pavement Patching Sample Clauses

Pavement Patching. Delete the last sentence of the first paragraph beginning with “During periods of winter shutdown…”. 619-5 BASIS OF PAYMENT 619-5.01 General.
AutoNDA by SimpleDocs
Pavement Patching. A.) For failed Pavement - If the need should arise, and ONLY AT THE DIRECTION OF THE SUPERINTENDENT, to patch a section of the existing pavement that has “failed” the following shall apply: The total depth requirement for patching flexible pavement, as described in the Standard Specification Section 304.04, is hereby amended to be SIX (6) inches. The material under the patch is expected to be in a compacted condition in accordance with said Specification 304.04.
Pavement Patching. Paving shall not proceed until deficient base material areas and utility trenches have been corrected and are ready to receive paving. Paving shall not be applied until the Engineer inspects and approves the finished base.

Related to Pavement Patching

  • Pavement Design If applicable, the Engineer shall incorporate the pavement design developed by the State for this project. If the pavement design is not available, the State may request the Engineer to perform pavement design and submit to State for review and approval.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 15-A, PR-8, PR-15, PR-35 and PR-50:

  • Landscape Develop and coordinate landscape design concepts entailing analysis of existing conditions, proposed components and how the occupants will use the facility. Include location and description of planting, ground improvements and visual barriers.

Time is Money Join Law Insider Premium to draft better contracts faster.