Other Required Documentation. ALL DOCUMENTS ARE TO BE COMPLETED AND INCLUDED WITH THIS APPLICATION. - ALL DOCUMENTS ARE TO BE NEAT AND LEGIBLE. NON-LEGIBLE DOCUMENTS WILL NOT BE ACCEPTED BY THE UTILITY. Provide an electrical one/single-line diagram of the entire electrical generating facility. This diagram must include proper electrical device labeling and descriptions as well as show the electrical connections between all of the significant electrical components of the generating facility (i.e. generators, inverters, cables, wiring, switches, meters, transformers, circuit breakers, etc.). Provide a site plan drawing of the electrical generating facility and its associated premises. The drawing must show the physical arrangement of all major equipment (i.e. generators, transformers, switches, control panels, etc.), the customer's existing metered services (and the new/proposed meter services, if applicable), the customer- utility interconnection point, and any other significant structures or obstacles present in the area.
Appears in 4 contracts
Samples: www.maritimeelectric.com, www.maritimeelectric.com, www.maritimeelectric.com