Other Network Upgrades Sample Clauses

Other Network Upgrades. (i) Reliability Network Upgrades. None.
AutoNDA by SimpleDocs
Other Network Upgrades. [insert description of Network Upgrades]. These facilities are estimated to cost $ .
Other Network Upgrades x. Xxxxxxx Substation: four +/- 4 MVAR dynamic reactive sources; a dedicated 115/34.5 kV transformer for the dynamic reactive sources, including High-side and Low-side breakers (see Appendix A-1).
Other Network Upgrades. Comment [ED1]: Estimates are needed for Appendix C, Exhibit 1 New protective relaying for the S-171 and S-171S lines is needed between the new 115 kV ring bus switchyard installed for the Interconnection Customer’s Generating Facility and the Interconnecting Transmission Owner’s Drumrock / Hartford Avenue Substations.
Other Network Upgrades. The Interconnecting Transmission Owner will engineer, design, procure, construct, own, operate and maintain the Other Network Upgrades described in Appendix A.2.b to this Agreement at the Interconnection Customer’s expense. III. Additional Facilities and Associated Equipment N/A
AutoNDA by SimpleDocs
Other Network Upgrades. Description of Project Facility Owner Estimated Cost Xxxxx County Industrial – Rumble Road 115 kV line (GPC)  Loop line into new IC-340 Interconnecting Substation. GPC $300,000 Public Safety Training Center 115/12 kV Substation (GPC)  Upgrade the Ground Grid to accommodate increased fault current contribution from the IC-340 Generating Facility. GPC $125,000 Xxxxx County Industrial 115 kV Substation (GPC) IC-340 115 kV line  Install 115 kV CCVT, line trap, and tuner on the IC-340 115 kV line for power line carrier.  Install a standard power line carrier DCUB pilot scheme on the IC-340 115 kV line.  Install dual channel power line carrier transfer trip receiver panel. GPC $360,000 Total Cost for Other Network Upgrades $785,000
Other Network Upgrades. Interconnecting Transmission Owner’s Network Upgrades shall include an extended grounding mat and rewired and upgraded control and protection for the Interconnection Facilities, all at its Medway Station #65, and all at Interconnection Customer’s expense.