Origination Documents to Review Sample Clauses

Origination Documents to Review. ‌ At a minimum, the PFI is required to review the following origination documents for completeness, accuracy, and compliance with all underwriting and eligibility requirements of the Guides and compare them to the reverifications received during its post-Closing QC review: • Uniform Residential Loan Application (FNMA Form 1003 / FHLMC Form 65); • Credit documentation; • Employment and income documentation; • Sources of funds documentation; • Appraisal documentation; • Sales contract; • For manually underwritten Mortgages, the Uniform Underwriting and Transmittal Summary (FNMA Form 1008 / FHLMC Form 1077); and • For Mortgage Loans underwritten with the assistance of either DU or LP, the output certificate must be reviewed, and the PFI must ensure that all conditions from the respective automated underwriting system have been met. Adequate documentation must be in the Mortgage Loan File for each condition listed on the final approval certificate.
AutoNDA by SimpleDocs

Related to Origination Documents to Review

  • Construction Documents Phase 2.2.1.5. Bidding or Negotiation Phase: 2.2.1.6. Construction Administration Phase

  • CLARIFICATION OF SPECIFICATION DOCUMENTS 4.1 Bidders shall promptly notify the Purchasing Agent of any ambiguity, inconsistency or error which they may discover upon examination of the specification documents.

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner.

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • AMENDMENTS TO SERVICE AGREEMENT With effect from the date of this Deed the Parties agree that the Service Agreement is varied so that:

  • AMENDMENTS TO THIS AGREEMENT This Agreement may only be amended by the parties in writing.

  • Identification of Construction Documents The Design Professional shall identify the Construction Documents, which shall include, but are not limited to, the Specifications, the Drawings, and all Addenda. The Construction Documents are included within the Contract Documents.

  • AMENDMENTS TO APPLICATION AND AGREEMENT; WAIVERS A. This Agreement may not be modified or amended except by an instrument or instruments in writing signed by all of the Parties and after completing the requirements of Section

  • AMENDMENTS TO THE CONTRACT The Contract shall be amended as follows:

Time is Money Join Law Insider Premium to draft better contracts faster.