Location of Work The Executive shall be based in the United States in West Orange, New Jersey. However, the Executive agrees to undertake whatever domestic and worldwide travel is required by the Company. The Executive shall not be required or permitted to relocate without the mutual, written consent of the Executive and the Company.
JURISDICTION OF WORK 2.1 The assignment of work of the sprinkler fitter and apprentice shall consist of the installation, maintenance, repair, servicing, inspection, backflow installation, and caulking of sleeves of fire suppression systems, including but not limited to sprinkler, halon, foam, clean agent, CO2 and dry chemical systems, including the unloading, handling, and installation by hand or with power equipment, of all piping or tubing, appurtenances or equipment pertaining thereto, including both overhead and underground water mains, fire hydrants and hydrant mains, standpipes and hose connections to sprinkler supply mains, sprinkler tank heaters, air lines associated with thermal sensing systems used in connection with sprinkler and alarm systems, also all tanks and pumps connected thereto, and other fixed systems used for fire protection purposes. This assignment of work shall also include the erection and dismantling of steel scaffolding, the operation and use of power operated scaffolding, the handling and use of swing stages, and all scaffolding a sprinkler fitter or their apprentice may use in the performance of their job.
SUBCONTRACTING OF WORK If a Contractor chooses to subcontract the scheduled work, the prime Contractor is solely responsible to ensure that the subcontractor has the necessary insurance, licenses, ability to provide the contracted services and shall adhere to all requirements stated herein.
Description of Work (a) that has been omitted or
CORRECTION OF WORK 13.2.1 The Contractor shall be responsible for correcting all Work which the Architect has found to be defective or which fails to conform to the Contract Documents whether observed be- fore or after Substantial Completion and whether or not fabricated, installed or completed. The Contractor shall bear all costs of correcting such rejected Work, including compensation for the Architect's and the State’s additional services made necessary thereby. The Architect, upon a finding of defect or failure to conform, shall immediately notify the State and Contractor, in writing, of the defect. The Contractor shall begin correcting the defective or non-conforming Work within ten (10) days unless the State agrees to a Change Order which reflects the reduction in Contract Sum due to the value of diminishment of the defective or nonconforming Work.