Operational Tolerance Sample Clauses

Operational Tolerance as defined in Paragraph 11.1.3(C) of Part B of Schedule 2;
AutoNDA by SimpleDocs
Operational Tolerance. It is the intent of the parties hereto that the quantity of Gas scheduled at each Delivery Point shall be the quantity delivered at such Delivery Point. However, Buyer and Seller recognize the inherent inaccuracies in the measurement and allocation of Gas due to the inability to maintain precise control. Such inaccuracies may at times occur through no fault of Buyer or Seller, such as in the case of allocations after actual deliveries which are the result of measurement. inaccuracies, or unpreventable variations in rates of flow at the Delivery Points, and may result in failure to deliver or receive the Scheduled Amounts (such inaccuracies are hereinafter called "Measurement and Allocation Inaccuracies"). To the extent the actual quantity delivered may vary from the quantity scheduled due to Measurement and Allocation Inaccuracies, the parties agree that Buyer's obligation to purchase and receive and Seller's obligation to sell and deliver shall be deemed to be fulfilled to the extent that, on a monthly basis, such deliveries and receipts are within the monthly operational tolerances of the Transporter.
Operational Tolerance. For each Cargo there shall be an operational tolerance of up to plus [***] or minus [***] of the Scheduled Loading Quantity (the “Operational Tolerance”). The provisions of Clauses 7.4 and 7.6 shall not apply to any Cargo if the Quantity Delivered for that Cargo is at least [***] of the Scheduled Loading Quantity. If the Quantity Delivered is less than [***] of the Scheduled Loading Quantity for a Cargo, the Scheduled Loading Quantity (excluding the Operational Tolerance) shall be used for the purpose of calculating amounts due in accordance with the provisions of Clauses 7.4 or 7.6, as applicable. For the avoidance of doubt, the Parties shall seek in good faith to deliver and take the Scheduled Loading Quantity for each Cargo (without any adjustment in respect of the Operational Tolerance) and the Operational Tolerance shall apply only in the manner described above in this Clause 7.9 and shall not be assumed or implied as reducing/increasing the Buyer’s obligations under Clause 7.4 or the Seller Group’s obligations under Clause 7.6. EXECUTION VERSION
Operational Tolerance. Notwithstanding the foregoing provisions of this Article 8, and subject to the provisions of Article 8.4, Buyer shall not be required to lift, nor be subject to any liability for lifting less than, the Contract Quantity in any Month if and to the extent that:

Related to Operational Tolerance

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Operational Control Directing the operation of the Transmission Facilities Under ISO Operational Control to maintain these facilities in a reliable state, as defined by the Reliability Rules. The ISO shall approve operational decisions concerning these facilities, made by each Transmission Owner before the Transmission Owner implements those decisions. In accordance with ISO Procedures, the ISO shall direct each Transmission Owner to take certain actions to restore the system to the Normal State. Operational Control includes security monitoring, adjustment of generation and transmission resources, coordination and approval of changes in transmission status for maintenance, determination of changes in transmission status for reliability, coordination with other Control Areas, voltage reductions and Load Shedding, except that each Transmission Owner continues to physically operate and maintain its facilities.

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • System Maintenance The Trust understands that USBFS will perform periodic maintenance to the System(s), which may cause temporary service interruptions. To the extent possible, USBFS shall notify the Trust of all planned outages and will perform any necessary maintenance during non-business hours.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.