Offshore platforms and subsea manifolds Sample Clauses

Offshore platforms and subsea manifolds. Offshore platforms provide space and power connections for the equipment needed to operate and maintain the transport and storage of CO2. This will include xxxxx for injecting the CO2 into the reservoir, maintenance facilities for the transport infrastructure, and compressors for increasing the pressure of the CO2 stream to the necessary injection pressure. The platform and subsea infrastructure comprise the following components: • Platform foundation, H on Figure 1.2. This structure supports the platform deck. Several possible engineering solutions are in use in the oil and gas industry, from floating steel structures to concrete shafts firmly anchored on the sea bottom. • Topside facilities, I on Figure 1.2. Equipment on the platform deck including wellheads, maintenance facilities, connection to the CO2 pipeline, metering instruments, accommodation and safety apparatus. • Xxxxx. A shaft from the platform to transport the CO2 to the reservoir. See Appendix A.5 for further detail on the well design.
AutoNDA by SimpleDocs

Related to Offshore platforms and subsea manifolds

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • Přetrvající platnost This Section 3 “

  • Retaining Walls Prepare preliminary retaining concepts to be shown on schematics, typical sections, and cross sections. • Determine if any additional walls are required and verify the need for and length of the retaining wall as shown on the ultimate schematic. • Compute and tabulate retaining wall quantities for preliminary design milestone plans submittal.

  • Inductions 57.1 Prior to first attending the site, all Employees shall have successfully completed the Basic Site Induction (Construction Induction Card) course conducted by a RTO. Employees shall provide proof evidencing same if requested.

  • Přetrvávající platnost Tento odstavec 1.3 “Zdravotní záznamy a Studijní data a údaje” zůstane závazný i v případě zániku platnosti či vypršení platnosti této Smlouvy.

  • Innovative Scheduling Schedules which are inconsistent with the Collective Agreement provisions may be developed in order to improve quality of working life, support continuity of resident care, ensure adequate staffing resources, and support cost-efficiency. The parties agree that such innovative schedules may be determined locally by the Home and the Union subject to the following principles:

  • Additional Wet Weather Procedure 14.15.1 Remaining On Site Where, because of wet weather, the employees are prevented from working:

  • Food Service Waste Reduction Requirements Contractor shall comply with the Food Service Waste Reduction Ordinance, as set forth in San Francisco Environment Code Chapter 16, including but not limited to the remedies for noncompliance provided therein.

  • Safety Glasses 10.3.1 Where a teacher is considered to be working in an “eye danger” area, the teacher shall receive a personal issue of standard neutral safety glasses which shall remain the property of the employer.

Time is Money Join Law Insider Premium to draft better contracts faster.