Number of Facilities Sample Clauses

Number of Facilities. 4. a. Provide the total number of direct beneficiaries of this project: Projected # Projected Minorities (if available) # Actual # Actual Minorities (if available) #
AutoNDA by SimpleDocs
Number of Facilities. [326 IAC 2-9-8] Pursuant to 326 IAC 2-9-8 (Crushed stone processing plants), the source shall have no more than six (6) crushers, thirteen (13) screens, and one (1) conveying operation.
Number of Facilities. [326 IAC 2-9-8] Pursuant to 326 IAC 2-9-8 (Crushed stone processing plants), the source shall utilize at most nine
Number of Facilities. [326 IAC 2-9-7] Pursuant to 326 IAC 2-9-7 (Sand and gravel plants), the source shall utilize at most twelve (12) crushers, twenty-four (24) screens, and a conveying operation. D.4 Opacity [326 IAC 2-9-7] [326 IAC 12] [40 CFR 60.670, Subpart OOO] Pursuant to 326 IAC 2-9-7 (Sand and gravel plants) and New Source Performance Standards, 326 IAC 12 (40 CFR 60.670, Subpart OOO) “Standards of Performance for Nonmetallic Mineral Processing Plants”, visible emissions shall comply with the following standards:
Number of Facilities. 1 Alexander Elementary ECM Description M&V Method Xxxxxx Elementary Window Replacement Stipulated Reed Elementary Window Replacement Stipulated The Owner shall pay the Qualified Provider the annual Energy Monitoring fees identified below. For these fees, the Provider shall provide an annual report containing Calculated Savings, equipment runtime data (if applicable) and utility data each year within 120 days following the conclusion of each year during the Program Term. Provider will also prepare and deliver to Owner the appropriate annual state reports as required by statute on annual basis.

Related to Number of Facilities

  • No Dedication of Facilities Any undertaking by one Party to the other Party under any provision of this Agreement shall not constitute the dedication of the system or any portion thereof by the Party to the public or to the other Party, and it is understood and agreed that any such undertaking under any provision of this Agreement by a Party shall cease upon the termination of its obligations hereunder.

  • Utilization Scale STATE shall scale logs or portions of logs that are broken, wasted, or not removed by PURCHASER due to: (1) improper felling or bucking of the logs; (2) failure to remove the logs prior to deterioration; and (3) logs remaining on the timber sale area after completion of logging, provided the logs were merchantable prior to breakage or wastage. Material used to meet down material requirements in the section titled, "Reserved Timber," shall not be considered for utilization scale. PURCHASER shall pay for the logs at the contract price designated in Section 44. STATE shall notify PURCHASER of the volume of logs so scaled. Payment shall be considered due on such volume as if the logs were removed on the date of said notification. In the event PURCHASER disagrees with the findings made by STATE under this section, PURCHASER may furnish scaling by a third-party scaling organization acceptable to STATE. Costs and expenses of such third party shall be paid for by PURCHASER, and the findings of the third party shall be final.

  • New Facilities For all new Generating Facilities to be interconnected pursuant to the Tariff, other than wind- powered and other non-synchronous generation facilities, the Generation Interconnection Customer shall design its Customer Facility to maintain a composite power delivery at continuous rated power output at a power factor of at least 0.95 leading to 0.90 lagging. For all new wind- powered and other non-synchronous generation facilities the Generation Interconnection Customer shall design its Customer Facility with the ability to maintain a composite power delivery at a power factor of at least 0.95 leading to 0.95 lagging across the full range of continuous rated power output. For all wind-powered and other non-synchronous generation facilities entering the New Service Queue on or after November 1, 2016, the power factor requirement shall be measured at the high-side of the facility substation transformers. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. For all wind-powered and other non-synchronous generation facilities entering the New Service Queue on or after May 1, 2015, and before November 1, 2016, the power factor requirement shall be measured at the generator’s terminals. For new generation resources of more than 20 MW, other than wind- powered and other non-synchronous Generating Facilities, the power factor requirement shall be measured at the generator’s terminals. For new generation resources of 20 MW or less, and all wind-powered and other non-synchronous generation facilities entering the New Service Queue prior to May 1, 2015, the power factor requirement shall be measured at the Point of Interconnection. Any different reactive power design criteria that Transmission Provider determines to be appropriate for a wind-powered or other non-synchronous generation facility shall be stated in the Interconnection Service Agreement. A Transmission Interconnection Customer interconnecting Merchant D.C. Transmission Facilities and/ or Controllable A.C. Merchant Transmission Facilities shall design its Customer Facility to maintain a power factor at the Point of Interconnection of at least 0.95 leading and 0.95 lagging, when the Customer Facility is operating at any level within its approved operating range.

  • Existing Facilities Each of the Existing Facilities shall be repaid in full and terminated and all collateral security therefor shall be released, and the Administrative Agent shall have received pay-off letters in form and substance satisfactory to it evidencing such repayment, termination and release.

  • Inspection of Facilities In order to meet their respective obligations under this Agreement, any Party may view or inspect facilities owned by another Party. Provided that reasonable notice is given, a Party shall not unreasonably deny access to relevant facilities for viewing or inspection by the requesting Party.

  • Additional Facilities If the CAISO determines that it requires Operational Control over additional transmission lines and associated facilities not then constituting part of the CAISO Controlled Grid in order to fulfill its responsibilities in relation to the CAISO Controlled Grid then the CAISO shall apply to FERC pursuant to Section 203 of the Federal Power Act, and shall make all other regulatory filings necessary to obtain approval for such change of control and shall serve a copy of all such applications on the affected Participating TO and the owner of such lines and facilities (if other than the Participating TO). In the event that a Party invokes the dispute resolution provisions identified in Section 15 with respect to the transfer of Operational Control over a facility, such facility shall not be transferred while the dispute resolution process is pending except pursuant to Section 4.5.2.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Parking Facilities Alamo Colleges District shall make the existing parking facilities at the rented Facility available for the vehicular traffic and parking necessitated by the Organization’s Use of the rented Facility, on a non-exclusive basis, as specified at Exhibit A. MAXIMUM CAPACITY. Organization anticipates approximately the number of participants stated at Exhibit A and agrees to inform Alamo Colleges District of any significant changes five (5) business days in advance of a Use. Organization shall not admit a larger number of persons than can safely and freely move about the Facility. Alamo Colleges District shall notify Organization of the recommended capacity of the Facility and all decisions of Alamo Colleges District concerning questions arising under this Paragraph shall be final.

  • Alternate Facilities If under Purchaser’s Operating Schedule, roads needed for the removal of Included Timber differ substantially from Specified Roads, other roads may be added to A7. Contracting Officer shall assure that road routing, location, design, and needed easements will make such other roads acceptable as parts of the National Forest transportation facilities. Purchaser shall provide survey, design, and construction staking for such other roads. Based on design quantities from such engineering, Forest Service shall estimate Specified Road construction costs of alternate facilities, using methods consistent with those used in the original computation of the Schedule of Items. If Specified Road construction costs for acceptable alternate facilities are less than the estimated costs of facilities listed in the original Schedule of Items that Purchaser does not construct, Timber Sale Account shall be adjusted by Forest Service to reflect the reduction in costs. In event of rate redetermination under B3.3, such allowed costs shall be the redetermined estimated costs of facilities listed in the original Schedule of Items that Purchaser does not construct.

  • Participating TO’s Interconnection Facilities The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.

Time is Money Join Law Insider Premium to draft better contracts faster.